What are the disclosure requirements for weak current intelligent projects?

The following is the relevant content about the communication requirements for weak current intelligent projects brought to you by Zhongda Consulting for your reference.

1. All personnel participating in the construction must strictly abide by all the provisions of the general part of the "Electrical Safety Technical Operating Code".

2. When entering the construction site, you must wear a safety helmet correctly and tighten the chin strap. During the construction process, it is strictly forbidden to take off your hat and untie it. It is strictly forbidden to wear slippers, easy-to-slip shoes with spikes, high heels, shorts, shorts, etc. to work. . It is strictly prohibited to come to work after drinking.

3. Before construction, check whether the surrounding environment meets the safety production requirements and whether the labor protection users are intact. If factors endangering safe work are found, they should be reported immediately to the technical safety department or the person in charge of the construction, and any inappropriate factors should be removed. Only after taking safety measures can you start working.

4. During the cross-construction process of various majors, you should walk according to the designated on-site roads, not pass through dangerous areas, avoid the trajectory of the hanging objects in the civil construction tower as much as possible, and do not pass or stay under the hanging objects. Pay attention to keeping a certain safe distance from operating machinery.

5. When pre-embedding pipelines, attention should be paid to the steel bars and formwork in the operating area to prevent nails from running over your feet and tripping over the steel bars. At the same time, attention should also be paid to the temporary scaffolding walkways above to prevent high objects from falling. Hitting hurts.

6. When working at high altitudes (more than 2.5 meters), a strong and non-damaging safety belt must be worn correctly. The hanging point must be firm and reliable. The safety belt should be hung high and used low. It is strictly forbidden to throw objects downwards from high places. .

7. When using a herringbone ladder, it must be placed flat and stable. The angle between the two ladder feet and the ground should not be greater than 60 degrees, and the two ladder surfaces should be firmly connected with hooks or rigging. Two ladders are not allowed. One or more people are working on the same herringbone ladder. When using a single-sided ladder, the angle between the lower leg and the ground should be no less than 45 degrees. When operating on the ladder, there should be dedicated personnel on the ground to cooperate and monitor. It is strictly prohibited to use the body to shorten the horizontal distance from the construction site, and move the center of gravity to the herringbone Outside the ladder, use the tripping position of the ladder rungs during operation.

8. When using various power tools, protective measures such as one machine, one gate, one safe, one box and one lock must be adopted. The power line must be returned to the air and lead away, and the overhead line must be 0.5 meters higher than the human head. It is appropriate. It is strictly prohibited to hang or tie lines directly to steel pipe scaffolding. Insulating gloves must be worn when using hand-held power tools.

9. When using electric welding equipment, you must first conduct an insulation test and ensure that it meets the standards before use. It must also be tested regularly and recorded. During use, the primary line of the welding machine must not exceed 5 meters. The secondary line must not exceed 5 meters. The secondary line should not exceed 30 meters, and measures should be taken to prevent moisture and rain from the welding machine.

For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd