Shuiguan expressway was completed and opened to traffic on February 30th, 2006 1+65438. The total investment is 980 million yuan.
The reconstruction and expansion project of Shuiguan expressway started in March 2009 and was completed in July 20 1 1. The total length of the extension route is 13.465km, and the subgrade width is 50m. There are 3 overpass bridges, 9 medium bridges, 23 culverts and 6 interchanges. Total investment1200 million yuan.
The Shuiguan Expressway expansion project has added a Shuilian Interchange, and the Jilian Expressway and Shuiguan Expressway can be interconnected.
Xinshuiguan expressway is the first bi-directional 10 lane fully-illuminated and fully-monitored expressway in China, which was developed and built by Huayu Institute with the concept of "ecology, environmental protection, sightseeing and quality products".
history
Shuiguan Expressway, originally invested by Longgang District Government, is a free municipal expressway (equivalent to Beihuan Avenue in nature) named Longgang Second Passage. After successfully participating in the project bidding, Huayu Agency Company officially started construction at the beginning of 1995 and was completed and opened to traffic on February 30, 2006 1 65438. The total investment is 980 million yuan.
In order to welcome the 26th Summer Universiade of 20 1 1 Shenzhen, the reconstruction and expansion project of Shuiguan Expressway started in March 2009 and was completed in July 201/. The expansion project adopts the design standards of inner two-way six-lane expressway and outer two-way four-lane auxiliary road, with the design speed of 80 km/h and the total length of the expansion route of 13.465km.
Hutong junction
From southwest to northeast, they are: Longjing Interchange Bulong Toll Station (Longhua North of Jihua Road, Longhua South of Bulong Road, Buji South of Jihua Road, and Nanping Expressway West), Li Lang Li Jiao Bran Toll Station (Guanlan North of Bran Road, Buji South of Bran Road), Pingsha Toll Station of Danping Interchange (Pinghu North of Danping Expressway, Danzhutou South of Danping Expressway, Yantian direction of Yanpai Expressway), Xinyi Interchange Hengping Toll Station (Hengping Road westbound in Henggang direction, Hengping Road eastbound in Pingshan direction), Shuihe Interchange He 'ao Toll Station (Huiyan Expressway northbound, Shenshan Expressway southbound), and North Passage Interchange Longgang Toll Station (Yanlong Avenue northbound, Ainan Road southbound, Longxiang Avenue eastbound).
Matters needing attention
Shuiguan Expressway and Yanpai Expressway are partially interconnected. At present, the ramps that have been opened are: Shuiguan Expressway to Yanpai Expressway (east to south) and Yanpai Expressway to Shuiguan Expressway (north to west and north to east); The off-ramp roads are: Shuiguan Expressway to Yanpai Expressway (west to north and west to south), Shuiguan Expressway to Yanpai Expressway (east to north) and Yanpai Expressway to Shuiguan Expressway (south to west and south to east).
The above is the introduction of Shuiguan Expressway by Construction Network. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.