Installation sequence of 330 plunger pump for power sprayer of Taizhou Jingde Electromechanical Technology Co., Ltd.

Taizhou Jingde Electromechanical Technology Co., Ltd. Power sprayer 330 plunger pump installation sequence is as follows:

1. Mounting base: Place the base of the power sprayer in a proper position to ensure that the base is stable and flush with the ground.

2. Install 330 plunger pump: If your electric sprayer is equipped with 330 plunger pump, please install the pump in the correct position according to the instructions provided by the manufacturer. This may involve steps such as fixing bolts and connecting pipes.

3. Connect the power supply: Connect the electric sprayer to a suitable power supply. Ensure that the connection is made according to the electrical installation requirements to ensure safe operation.

4. Connect the nozzle: connect the nozzle to the connection point between the pump and the spray gun. Ensure that the pipes are tightly connected and there is no leakage.

5. Liquid supply: If the power sprayer needs liquid supply, such as pesticides and water, ensure that the liquid supply system is connected correctly and smoothly.

6. Trial operation: Before actual use, conduct a short trial operation to ensure that the power sprayer and pump can work normally and spray evenly.

7. Calibration and adjustment: According to the manufacturer's instructions, make necessary calibration and adjustment to ensure the best performance of electric sprayer in use.