Other costs related to project construction?

Other expenses related to project construction mainly include construction unit management fees, survey and design fees, research and test fees, construction unit temporary facility fees, project supervision fees, project insurance premiums, power supply subsidies, and construction agency relocation Fees, other expenses for introducing technology and imported equipment, project contracting fees, etc.

(1) Construction unit management fee.

The management fee of the construction unit refers to the various management fees required by the construction unit for the whole process management of the construction project, such as preparation, construction, trial operation, completion acceptance and post-project evaluation.

(2) Survey and design fee.

Survey and design fees refer to the preliminary work fees paid in accordance with regulations when entrusting relevant consulting units to conduct feasibility studies, project evaluation decisions and design documents, or entrusting survey and design units to conduct survey and design work in accordance with regulations. The survey and design fees paid, or the relevant fees required for the construction unit to complete the relevant feasibility study or survey and design work by itself within the specified scope.

The survey and design fee is generally calculated in accordance with the charging standards and relevant regulations on survey and design issued by the State Planning Commission. With the gradual implementation of survey and design bidding activities, this fee should also be combined with the specific conditions of the construction market. Determine the situation.

(3) Research and test fees.

Research and test fees refer to the fees required for necessary tests to provide and verify design parameters, data, information, etc. for the construction project, as well as the fees required for tests and verifications required by the design during construction, mainly including Research the labor costs, material costs, testing equipment and instrument usage fees required for testing by yourself or entrust other departments. This cost is generally calculated based on the research and test content and requirements proposed by the design unit for the needs of this construction project.

(4) Temporary facility fees for construction units.

The temporary facility fee of the construction unit refers to the erection, maintenance, amortization or leasing costs of temporary facilities required by the construction unit during the project construction period. Temporary facilities of construction units mainly include temporary dormitories, cultural welfare and public utility buildings, structures, warehouses, offices, processing plants, roads, water and electricity, etc. This cost is generally calculated as 1% of the construction and installation project cost for new construction projects; for renovation and expansion projects, it is generally calculated as less than 0.6% of the construction and installation project cost.

(5) Project supervision fees.

Project supervision fees refer to the various expenses required by the construction unit to entrust the supervision unit to supervise the project. The widespread implementation of the construction project supervision system is a major reform of the management system in the field of engineering construction in my country. There are mainly two billing methods:

① Calculated according to 0.03% to 2.50% of the supervision project estimate or budget;

p>

② Calculated based on the annual average number of supervisors multiplied by (3 to 5) million yuan/(person·year).

(6) Project insurance premium.

Project insurance premiums refer to the expenses required to implement engineering insurance according to project needs during the construction period, generally including various construction projects and their materials and machinery and equipment during the construction process as the subject of insurance. Construction project all risks, installation project all risks with various materials and machinery and equipment in the installation project as the subject of insurance, as well as insurance costs for machine damage insurance, etc.

This cost is generally calculated based on different project categories by multiplying the cost of the construction and installation project by the corresponding construction and installation project insurance rate.

(7) Subsidy for power supply.

The power supply subsidy is a fee that the construction unit should pay to the power supply department in accordance with national regulations when applying for electricity or increasing power capacity. The power supply department plans and is responsible for the construction of external power supply projects at all levels below 110kV. A general term for the costs of construction, expansion, renovation, etc.

(8) Construction organization relocation fee.

The construction agency relocation fee refers to the one-time relocation fee for the construction agency to move from the original location to another area based on the needs of the construction task and approved by the construction project authority. It is generally applicable to large and medium-sized projects Engineering projects such as water conservancy, electricity, railways and highways require a large amount of manpower and material resources for construction, and the construction time is long and highly professional.

This expense includes travel expenses for employees and accompanying family members, wages during the relocation period, and transportation expenses for construction machinery, equipment, tools, tools, turnover materials, etc., but does not include the following expenses:

① Should be paid by The construction unit shall bear on its own the relocation costs incurred in mobilizing construction forces and internally balancing construction forces within the prescribed range.

②Relocation costs incurred due to blind relocation of construction teams due to violation of infrastructure procedures.

③Relocation costs incurred by the relocation of the construction organization due to winning the bid. This cost is generally calculated based on 0.5% to 1% of the construction and installation costs.

(9) Other expenses for introducing technology and imported equipment.

Other expenses for the introduction of technology and imported equipment refer to the related expenses incurred by the construction project due to the introduction of technology and imported equipment, which mainly include the following expenses:

① Expenses for personnel traveling abroad. Refers to the travel expenses, clothing expenses, living expenses, etc. for sending personnel to introduce technology and imported equipment to train and conduct design contacts abroad, as well as materials and equipment inspections, etc. Generally, the number of people, time, and the country to which they are sent for training and work abroad are based on the design regulations. , calculated according to the expense standards for temporary overseas personnel stipulated by the Ministry of Finance and the Ministry of Foreign Affairs.

②Expenses for foreign engineering and technical personnel to come to China. It refers to the technical service fees, wages, living allowances, travel expenses, accommodation expenses, entertainment expenses, etc. incurred by hiring foreign engineering and technical personnel to provide technical guidance for the introduction of foreign technology and the installation of imported equipment. Generally, the number of people is stipulated in the contract. , deadline and relevant standards for calculation.

③ Technology introduction fee. Refers to the patent fees, proprietary technology fees, foreign design and technical data fees paid for the introduction of foreign advanced technology, etc., which are generally calculated according to the price stipulated in the contract.

④Guarantee fee refers to the guarantee fee for a domestic financial institution to issue a letter of guarantee for the buyer. It is generally calculated according to the guarantee rate stipulated by the relevant financial institution.

⑤Interest on installment or deferred payment. Refers to the interest paid by using export credit to introduce technology or import equipment by means of installment or deferred payment.

⑥Inspection and appraisal fees for imported equipment. It refers to the imported equipment inspection and appraisal fee that must be paid by the commodity inspection department according to regulations. It is generally calculated as a percentage of the price of the imported equipment.

(10) Project contracting fees.

The project contracting fee refers to the management fee required by a company with general contracting conditions for the entire process of a construction project from the beginning to completion and put into production, generally including organization of survey and design, equipment and material procurement, non-standard Various management expenses incurred in equipment design, manufacturing and sales, construction bidding, contracting, project budget and final accounts, project management, construction quality supervision, concealed project inspection, project acceptance, completion and commissioning, etc. This fee is generally calculated as a percentage of the investment estimate in accordance with the project contracting fee standards stipulated by the national competent department or local government departments. This cost cannot be calculated for projects that do not implement engineering contracting.

For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd