What if the expansion screw is hung on the ceiling of the bathroom and the waterproof layer is opened?
Further waterproof construction is required. It is recommended that you choose waterproof products of Oriental Yuhong and standardized construction team. Oriental Yuhong is the best waterproof listed company in China. It is a powdery waterproof plugging material made of special cement and additives through a special process, which is used as a matrix for leakage or water gushing. \x0d\ There are three kinds of water leakage in general waterproof works, namely, point leakage, joint leakage and area leakage. According to the specific situation of water leakage in the project, quick-setting waterproof and plugging treasure can be used, and different water stopping and plugging technologies can be used to deal with it. \x0d\ 1。 Waterproofing and plugging of leaking holes \x0d\ Waterproofing treatment of parts around leaking holes. Use powder: water = 1:0.35, mix the powder with water, and apply it around the leakage hole. Generally use a trowel or scraper for 2~3 times, and the material used each time is about 1.2Kg/m2. After each coating is hardened (without fingerprints), spray it wet (but without water), and then proceed to the next step of construction. \x0d\ Remove the circular groove for plugging. Centering on the water leakage point, carve a groove (the groove diameter × depth is 10mm×20mm and 20mm×30mm, and the general capillary seepage carves a round hole with a diameter of 10mm), and rinse the groove with water. Mix the powder with water and knead it into a cone with a diameter close to that of the tank. When it feels hard by hand, put it into a jar, squeeze it with a wooden stick, tap it to make the inside and the surrounding area solid and dense, and then stop the water instantly. \x0d\2。 Waterproof and plugging of water leakage cracks \x0d\ Waterproof treatment of surrounding parts of water leakage cracks. Use powder: water = 1:0.35, mix the powder with water and apply it around the leaking gap. Generally use a trowel or scraper for 2~3 times, and the material used each time is about 1.2Kg/m2. After each coating is hardened (without fingerprints), spray it wet (but without water), and then proceed to the next step of construction. Lift the splayed groove for plugging. Dig a splayed groove with a depth of 10mm~30mm and a width of 15mm~50mm along the crack. Put a small rope along the crack at the bottom of the cylinder. The length of the rope is about 200 ~ 300 mm After mixing the powder with water, knead it into strips and leave it for a while. When it feels hard by hand, fill it in the groove where the rope is put, quickly compact the edge, then pull out the rope and compact it again to make the water leak out along the rope hole. For longer cracks, they can be filled step by step, and the length is about 100mm~ 150mm, with a gap of 20mm wide for each gap. At the gap of 20mm, when the mixture is about to solidify, insert the nail wrapped with the mixture into the gap and quickly compact the gap around the nail with the mixture. At the same time, rotate the nail and pull it out immediately to make water flow out along the nail hole. After the sealing material is solidified, the nail hole is treated according to the waterproof sealing method of the leaking hole. \x0d\3。 Treatment of large-area water leakage \x0d\ When plugging, water must be diverted to relieve pressure first. The principle of water diversion is to change surface leakage into line leakage and point leakage, so as to minimize the water leakage and concentrate the water leakage on one or several points to reduce the seepage pressure in other parts. After that, waterproof and plugging shall be carried out according to the treatment method of point leakage or line leakage. \ x0d \ x0d \ wallbillie interfacial agent (concrete interface treatment agent) \ x0d \ x0d \ concrete interfacial agent mainly refers to a product which can obviously improve the bonding strength between concrete and other products by increasing the roughness of concrete surface or its own strength, and is widely used in surface treatment of various cement bases. \x0d\ Wallbury interface agent (concrete interface treatment agent) is a new type of high permeability material composed of polymer emulsion and multifunctional additives. It has the characteristics of good sealing, strong permeability and high napping strength, and is suitable for interface treatment of concrete and mortar layer. \x0d\ is suitable for interface rubber treatment of concrete, aerated concrete and brick-concrete wall before batch putty scraping \x0d\x0d\ is suitable for base roughening of concrete layer or waterproof coating \ x0d \1,and base treatment \ x0d \ The base should be solid, clean, free from shaking, oil pollution and wax. \x0d\2。 Glue coating on the base \x0d\ Dilute the interface agent with 50%- 100% water, and brush 1-2 times on the base with a roller brush. After it is completely dried, the next working procedure can be carried out. \x0d\3。 Brushing the base course \x0d\ Mix the interface agent and cement (recommended 42.5 ordinary portland cement) into mixed slurry according to the ratio of 1:2, and brush 1-2 times on the base course with a hard brush, with a thickness of about 2mm. After hardening, it can enter the next process. \ x0d \ x0d \ color tile sealant (soft and delicate) \ x0d \ x0d \ tile sealant is a mixture of cement, filler, pigment and modifier, which is used to fill gaps between tiles. When matched with decorative materials such as tiles and stones, it can provide beautiful finishes, improve the adhesion and seepage prevention between decorative tiles, and relieve the internal stress of the whole wall or floor covering materials. \x0d\ product specification \x0d\20KG/ package \x0d\ product application scope \x0d\ is specially used for indoor caulking, and is applied to product construction technology \x0d\ 1, gap cleaning \x0d\ to remove oil, floating dust and loose objects in gaps below 4mm. In the case of high temperature environment and porous tiles, first wet the joints of tiles with clear water, and there is no clear water. \x0d\2。 Preparation of slurry \x0d\ First, add clean water into the barrel, slowly add the required powder under stirring, and fully stir it to make it paste, and then use it. See the certificate for water consumption. \x0d\3。 Joint filling \x0d\ Fill the joint filling material diagonally into the brick joint with a special rubber spatula and compact it. Wipe in one direction when caulking. \x0d\4。 After cleaning \x0d\ 10~ 15 minutes, use a wet sponge or a wet cloth to wipe off the excess joint filler of the ceramic tile; After 30 minutes, scrub the tile surface with a soft cloth; After 24 hours, use a dry cloth for further cleaning. \ x0d \ x0d \ ceramic tile binder (strong) \ x0d \ x0d \ ceramic tile binder is made of cement+graded sand+polymer admixture by modern technology, which is mainly used to paste ceramic tiles and stones with various specifications and materials, and has many advantages such as labor saving, material saving, low cost per unit area, safety and reliability. \x0d\ product specification \x0d\20KG/ bag, valve pocket \x0d\ product scope \x0d\ can be used indoors and outdoors, with emphasis on outdoor use. \x0d\ Home improvement, civil residence, business hotel, office building, business center, hospital, gymnasium \x0d\ product construction technology \x0d\ 1, grass-roots treatment \x0d\ The grass-roots should be solid and clean, free of sloshing, oil stain, wax stain, concrete curing agent and other loose objects; In the high water absorption base or high temperature and dry environment, the base should be wetted before construction. The flatness of the base should be less than 0.5 mm per meter. If it can't meet the requirements, it is necessary to level or choose a scraper with deep teeth. \x0d\2。 Preparation of mucilage \x0d\ First, add water into the mixing barrel, then slowly add the powder while stirring, stir with an electric stirrer until it is even and not caked, let it stand for 3 minutes, and use it after fully stirring again. The best use time is 1 hour. See the certificate for water consumption. \x0d\3。 Construction technology: A toothed scraper should be used for tile paving. \x0d\ Apply the adhesive to the base with a toothed scraper to make it evenly distributed and toothed. Each floor is about 1 square meter, and then knead the tiles and press them on the floor when they are hanging. The tooth depth of the scraper should consider the flatness of the working face and the convexity and concavity of the back of the tile. \ x0d \ x0d \ Lipton high-efficiency flexible waterproof slurry \ x0d \ x0d \ Lipton high-efficiency flexible waterproof slurry is a two-component water-based waterproof slurry composed of high-quality acrylate emulsion, various additives and inorganic powder composed of special cement and various fillers in a certain proportion. When coated on the surface of the substrate, a flexible and high-strength waterproof coating film can be formed after curing. \x0d\x0d\ product specification \x0d\20Kg/ barrel \x0d\ product scope \x0d\ is suitable for waterproofing and moistureproof in bathrooms, kitchens, balconies, floors, pools and basements. \x0d\ product construction technology \x0d\ 1, base treatment: the base surface should be smooth, solid and clean, free of sharp corners, oil stains, dew and cracks. \x0d\2。 Preparation of slurry: first, pour the liquid material into a mixing barrel, slowly add the powder while stirring, and stir with an electric stirrer until it is uniform and free from caking. When stirring, water can be added as needed to adjust the viscosity when brushing. See the certificate for preparation ratio. \x0d\3。 Detail treatment: according to the design requirements, reserved groove is embedded with sealing material; Before construction, the angle of yin and yang and the pipe root should be pre-processed into circular arcs or obtuse angles, and grid cloth should be laid, and appropriate multi-channel brushing should be carried out. \x0d\4。 Large-scale construction: First, the base is wet and saturated, but there is no clear water. Waterproof coating should be brushed for two or three times, and the next working procedure can be carried out only after each coating is dried, with an interval of 4-6 hours. After the coating is completely dried (estimated at 72 hours), the closed water test can be carried out. \ x0d \ x0d \ Water Lipton environmental protection polyurethane waterproof coating \ x0d \ x0d \ Water Lipton environmental protection polyurethane waterproof coating is a one-component moisture-curing waterproof coating, which reacts with moisture in the air to form a tough, soft and seamless elastic waterproof film. \x0d\x0d\ Scope of application \ x0d \ Waterproofing of kitchens, bathrooms, floors, balconies and exposed roofs. \x0d\ is suitable for basement waterproofing (building basements, underground garages, open-cut underground subways, tunnels). \x0d\ Waterproofing of swimming pools, artificial fountains, pools and canals. \x0d\ Waterproofing of parking lot and square roof. \x0d\ product construction technology \x0d\ 1, base treatment: the base should be solid, smooth and fully dry, free of sand, cracks, uneven defects, dust, oil stains and other dirt. \x0d\2。 Detail treatment: at the joints such as the corner of Yin and Yang and the root of the pipeline, paint 1 ~ 2 times to make additional waterproof layer, and the corner of Yin and Yang is made into an arc. \x0d\3。 Large-scale construction: Generally, the waterproof coating shall be painted for 3-4 times, with the total coating thickness of1.5 mm-2.0 mm. After each painting, it shall be fully solidified before the next construction, with an interval of 24 hours (the drying time shall be correspondingly extended when winter and seasons alternate), and the last painting shall be perpendicular to the previous painting direction. After coating waterproof layer is completely dried, protective isolation layer shall be set according to relevant specifications. \x0d\4。 Finishing layer construction: In the facade, in order to increase the adhesion between the finishing layer such as tiles and the coating film, the general practice is to spread a thin layer of clean medium sand on the surface of the coating film after coating the film for the last time and before curing. After the waterproof layer is completely dried for 48 hours, the finishing layer shall be constructed according to the design requirements. \x0d\\x0d\ Hao Shitou 100 high elastic thickness acrylic waterproof coating \ x0d \ x0d \ Hao Shitou 100 high elastic thickness acrylic waterproof coating is a kind of thick one-component waterborne polymer based on high-quality modified acrylate polymer emulsion, with various additives and fillers. The coating has the characteristics of low temperature resistance and high elongation. \x0d\\x0d\ Product specifications \x0d\20kg/ barrel, 10kg/ barrel, 5kg/ barrel \x0d\ product scope \x0d\ corner, pipeline periphery and Yin and Yang angle pretreatment; \x0d\ Waterproofing and moistureproofing of non-long-term submerged parts such as toilets, kitchens, floors, balconies and non-exposed roofs; \x0d\ product construction technology \x0d\ 1. Grass-roots treatment: the grass-roots surface should be smooth, solid and clean, without sharp corners, oil stains, water accumulation and cracks. \x0d\2。 Detail treatment: the reserved groove is filled with sealing material according to the design requirements; Before construction, the angle of yin and yang and the pipe root are pre-treated into circular arc or obtuse angle, covered with grid cloth and painted with multi-channel waterproof coating. \x0d\3。 Large-area painting: In order to ensure the drying of the base, waterproof paint is painted on the treated base, generally two or three times according to the requirements of the use environment. After each coating is dried (the interval is more than 24 hours), the next process can be carried out, and the next coating direction should be perpendicular to the previous direction (at 90℃) to achieve comprehensive coating. \x0d\4。 Closed water test: after the coating film is completely dried (about 48 hours), block the drain to store water. The water storage depth is not less than 20mm and the water storage time is 24 hours. There is no obvious drop in the water surface as qualified.