Construction project contract (3)

Terms of the construction project contract agreement

Party A: _ _ _ _ _ _ _

Party B: _ _ _ _ _ _

According to the principles of People's Republic of China (PRC) Contract Law and the specific conditions of this project, the two parties have reached the following agreement.

Article 1 General situation of the project.

1. 1 project name:

Project location:

Project content:

Scope of contract:

1.2 commencement date:

Date of completion:

Total calendar date:

1.3 quality grade:

1.4 contract price:

Article 2 Contract documents and interpretation order.

Article 3 Language, standards and applicable laws used in contract documents.

3. 1 Contract language:

3.2 Applicable laws and regulations:

3.3 Applicable standards and specifications:

Article 4 drawings.

4. 1 Date of providing drawings:

4.2 Number of sets provided by drawings:

4.3 Special confidentiality requirements and expenses of drawings:

Article 5 Party A's on-site representative.

5. 1 List of on-site representatives and appointed personnel of Party A:

5.2 Name and authorized scope of the chief supervision engineer who carries out social supervision (if any):

Article 6 Party B's on-site representative.

Article 7 Party A's work.

7. 1 The construction site meets the requirements of commencement conditions and completion time:

7.2 Time, place and supply requirements of water, electricity, communication and other construction pipelines entering the construction site:

7.3 The opening time, starting and ending place of the main traffic trunk lines on the construction site and their roads with the public * * *:

7.4 Engineering geology and underground pipe network line data providing time:

7.5 Name and completion time of documents and approvals:

7.6 Requirements for the provision and submission of leveling points and coordinate control points:

7.7 Time for disclosure of drawings and design:

7.8 Protection requirements for buildings and underground pipelines around the construction site:

Article 8 Party B's Work

8. 1 Name, completion time and requirements of construction drawing and supporting design:

8.2 Provide the name, time and number of copies of the plan and report:

8.3 Construction protection requirements:

8.4 Requirements for providing office and living facilities for Party A's representatives:

8.5 Construction site traffic and noise requirements:

8.6 finished product protection requirements:

8.7 Protection requirements for buildings and underground pipelines around the construction site:

8.8 Construction site hygiene requirements:

Article 9 Schedule

9. 1 Time for Party B to provide the construction organization design (or construction plan) and schedule:

9.2 Time approved by Party A's representative:

Article 10 Delaying the commencement of construction.

The eleventh suspension of construction.

Article 12 The construction period shall be postponed.

Article 13 The construction period is advanced.

Article 14 inspection and rework.

Fifteenth engineering quality grade.

15. 1 Economic expenditure required by engineering quality grade:

15.2 name of arbitration department for quality evaluation:

Article 16 Concealed works and intermediate acceptance.

16. 1 Intermediate acceptance location and time:

Article 17 Trial operation.

Article 18 Acceptance and reinspection.

Article 19 Contract Price and Adjustment.

19. 1 Adjustment conditions:

19.2 adjustment method:

Twentieth engineering advance payment.

20. 1 Total amount of advance payment:

20.2 Time and proportion of advance payment:

20.3 Deduction time and proportion:

20.4 Party A's liability for breach of contract for not paying on time:

Article 2 1 Verification and confirmation of quantity.

2 1. 1 Time and requirements for Party B to submit the engineering quantity report:

Article 22 Payment of project funds.

22. 1 payment method of project funds:

22.2 Payment amount and time of project funds:

22.3 Party A's liability for breach of contract:

Article 23 Party A shall supply materials and equipment.

23. 1 Requirements for materials and equipment supplied by Party A (attached table):

Article 24 Party B shall purchase materials and equipment.

Article 25 Design changes

Twenty-sixth determine the change price.

Article 27 Completion acceptance.

27. 1 Time for Party B to submit completion data and acceptance report:

27.2 Time and number of copies of as-built drawings submitted by Party B:

Article 28 Completion settlement.

28. 1 Settlement method:

28.2 Time for Party B to submit the settlement report:

28.3 Time for Party A to approve the settlement report:

28.4 Time for Party A to send the appropriation notice to the handling bank:

28.5 Party A's liability for breach of contract:

Article 29 guarantee.

29. 1 warranty content and scope:

29.2 Warranty period:

29.3 Warranty amount and payment method:

29.4 Guarantee interest rate:

Article 30 Disputes.

30. 1 dispute settlement procedure:

30.2 Dispute settlement:

Article 31 breach of contract.

3 1. 1 default handling:

3 1.2 amount of liquidated damages:

3 1.3 calculation method of loss:

3 1.4 Interest rate for Party A's failure to pay on time:

Article 32 claims.

Article 33 Safe construction.

Article 34 Patented technologies, special processes and rationalization proposals.

Article 35 Underground obstacles and cultural relics.

Article 36 Subcontracting of projects.

36. 1 Subcontractors and subcontracted works:

36.2 the subcontract works price settlement way:

Article 37 Force Majeure.

37. 1 Criteria for determining natural disasters caused by force majeure:

Article 38 Insurance.

Article 39 the project is suspended or postponed.

Article 40 Entry into force and termination of a contract.

40. 1 effectiveness and termination of the contract:

Article 41 Number of copies of the contract:

4 1. 1 number of copies of the contract:

4 1.2 responsibility for distributing copies of the contract:

4 1.3 Contract preparation fee:

Time of contract conclusion: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Employer (seal): Contractor (seal):

Address: _ _ _ _ _ _ Address: _ _ _ _ _ _

Legal representative: _ _ _ _ _ _ Legal representative: _ _ _ _ _ _

Authorized Agent: _ _ _ _ _ Authorized Agent: _ _ _ _ _ _

Tel: _ _ _ _ _ Tel: _ _ _ _ _ _ _

Fax: _ _ _ _ _ _ Fax: _ _ _ _ _ _

Bank of deposit: _ _ _ _ _ Bank of deposit: _ _ _ _ _ _

Account number: _ _ _ _ _ Account number: _ _ _ _ _ _

Postal code: _ _ _ _ _ Postal code: _ _ _ _ _ _ _