According to the characteristics of high moisture content and low calorific value of garbage in China, the company introduced and digested the advanced complete set of proprietary technology of garbage incinerator and flue gas purification system in segars, Belgium, and realized all localization. The emission index after garbage incineration is far superior to the national environmental protection emission requirements, and the main emission index reaches the European standard. At the same time, the heat treatment technology of landfill leachate (CEAB) was developed, which filled the technical gap in China and was successfully applied to Yantian and Nanshan garbage power plants, and obtained the national utility model patent. Combined with the technology and successful experience of landfill leachate treatment, the company also built a 2X600 MW desulfurization wastewater zero discharge project in Heyuan Power Plant, and made every effort to build another leading industry of the company-water treatment industry. After years of development, the company has accumulated rich experience in the design, investment, construction, operation and management of garbage power generation and related industries, especially the establishment of a design institute, which has a group of excellent engineering designers and strong scientific research strength, and is committed to the research, development, promotion and application of garbage incineration technology and environmental protection facilities and technologies.
Shenneng Environmental Protection actively promotes the development and construction of new projects with the development strategy of "based in Shenzhen, giving consideration to the surrounding areas and radiating the whole country", including large industrial zone (2,500 tons/day), Nanshan Phase II (800 tons/day), Baoan Phase II (3,000 tons/day) and Wuhan, Hubei (1000 tons/day). After these projects are completed and put into production, the company's daily garbage disposal capacity will reach 9750 tons. Among them, the second phase of Baoan Project was completed and put into operation on 20 12 and 12. Bao 'an Plant can handle 4,200 tons of garbage every day, and now it has become the largest garbage incineration power plant in China.