About 500 yuan.
You also need to pay related fees when opening an electric meter account. The fees for opening an electric meter account are different in each city. In some cities, the fee for opening an electric meter account is only about 300 to 500 yuan, but in some cities The cost of opening a city meter account is about 1,000 yuan.
When opening an electric meter account, you need to install it first, and you also need to pay the corresponding material fees and corresponding labor costs. These costs add up to a lot, although the state stipulates that opening an electric meter account does not require Pay a fee, but in most cases there is a fee.
Electric meter is the abbreviation of electric energy meter. It is an instrument used to measure electric energy. It is also called electric meter, fire meter, electric energy meter and kilowatt-hour meter.
Extended information
To apply for the installation of an electric meter, you must go through the following procedures:
1. The procedures for residents to install a new electric meter are as follows: First, residents must bring their original ID card and Please go to the power supply business window in person to get the "Application Form for Telegraph Installation", fill it out as required, and submit it to the window business receptionist for registration. If the ID card is lost or expired and cannot be processed in time, you can issue your own household registration book; if you are unable to issue a house ownership certificate, you can fill out the "Application Form for Installation by Telegraph" and go to the village committee where the household registration is to have the official seal stamped. If entrusting another person to handle the application, the trustee must present a letter of authorization, the original ID card and its copy, and the applicant's original ID card and its copy.
Second, after the window service receptionist verifies that the materials provided by the residents are correct, the originals will be returned and the copies will be archived. Arrange on-site inspection according to the "Application Form for Telegraph Installation".
Third, the load survey personnel go to the residential power site to conduct power supply condition survey, verify the power demand, determine the power capacity, nature of power consumption, power supply method, power supply path, metering method, metering device configuration, etc. content and formulate a power supply plan.
Fourth, the business receptionist issues a notice of the power supply plan to the customer. From the date of issuance of the notice, the residents will complete the payment procedures within 5 working days, and the construction workers will install the meter and turn on the electricity.