the evaluation of enterprise grade standard of waterscape fountain was studied and passed by the executive meeting of waterscape fountain Committee, and was approved by the water supply and drainage equipment branch. Now it has entered the declaration stage. These regulations are formulated in order to make this work fair and effective. 1. Any member of the Waterscape Fountain Committee, who abides by the articles of association of the Waterscape Fountain Committee and meets the reporting conditions, can declare according to the procedures. 2. Application procedures: 1. The enterprise shall send the application materials to the Waterscape Fountain Committee. 2, by the branch of water supply and drainage equipment and waterscape fountain committee evaluation committee, to review the application materials. 3. For the enterprises that have passed the document review, the Waterscape Fountain Committee will arrange the evaluation committee to conduct on-site inspection on the declared enterprises. At that time, the enterprise shall provide the original documents consistent with the application materials for review. 4, the evaluation committee according to the detailed rules for the evaluation of water fountain enterprise rating standards, to declare the enterprise rating. 5. After the enterprise level is released, if there are different opinions from the enterprises applying for participating, they should apply to the Waterscape Fountain Committee for re-evaluation within 15 days from the date of release.
6. Twenty days after the release date, the waterscape fountain committee will issue the enterprise grade certificate. 7. Measures for the level management of waterscape fountains will be stipulated separately. Iii. Requirements for application materials (both written materials and electronic version are indispensable): (1) Written materials: (in duplicate, bound into a book in the specified order) 1. Cover format of application materials (A4 paper, style attached); 2. A copy of the business license of the enterprise; 3. Production, installation and implementation of standards; 4, product quality inspection report, such as outsourcing products must provide the product quality inspection report; Such as: water pump, cable 5, product samples; 6, design, construction, installation and other technical documents; 7. ISO9 series quality system certification documents; 8. Award-winning certificate (including product and technology patent certificate and project award-winning certificate); 9. Provide copies of three different engineering contracts, and indicate the completion time, construction site, name of Party A, contact person and contact telephone number; 1, a copy of the enterprise employees' education and professional title certificate. (2) Requirements for filing electronic version: 1. Engineering design and installation process (8-1, words); 2, enterprise model project video.
for more information about the engineering/service/procurement bidding, and to improve the winning rate, you can click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd