Assistant Engineer 1 Work Summary
20__, came to the real estate engineering department of Hope Rose Garden in June, and was mainly responsible for the civil engineering management of Building 20 of Sanjiang Hope City. According to the arrangement of the company, I am now in charge of the site management of the 8# and 9# buildings.
One, 20__ years of personal work:
During the foundation trench excavation of 1.20 building, actively contact the earthwork construction unit and take the measures of "grasping in sunny days and grasping in cloudy days" to ensure the timely completion of earthwork excavation.
2. In the construction management of temporary slope support, the construction team is strictly required to construct according to the drawings, and the slope instability of the 19# building project is handled in time to ensure the slope stability and the safety of the 19# building project department.
3. In the management of pipe pile construction, strictly control the quality of pipe pile construction, combine with the geological conditions of the engineering site, and control the construction length of pipe pile to reduce the sawing length as much as possible under the condition of ensuring the design bearing capacity of pipe pile.
4. Because there is silt in the foundation trench soil and water comes out, it is suggested to dig a drainage well to drain water first, so as to reduce the groundwater level of the foundation trench and solve the problems in foundation construction in time and effectively.
Second, the shortcomings in the work and improvement methods:
1, lack of communication, unable to make full use of resources.
In the process of work, there is little communication with colleagues and people in other departments, so we can't make full use of superior resources. Improvement method: In the future work, I will actively strengthen the communication between colleagues in this department and other departments, and realize resource sharing through the company's platform, so as to improve my business level.
2. The planning is not strong.
In the construction stage of project development, the scheme is not detailed enough, and the grasp of primary and secondary contradictions is not very accurate. Improvement methods: In the future work, we should carefully formulate detailed work plans, enhance the purpose of doing things, distinguish between primary and secondary contradictions, and strive to get twice the result with half the effort.
3, narrow professional scope.
To be a modern talent needs to be versatile, so as to meet the needs of the times and the company. My major is narrow, and I don't know enough about other real estate majors, especially marketing planning and relevant national policies. Improvement methods: In the future work, I will strengthen the study of this major and other majors, make full use of the company's resources, improve subjective initiative, and strive to become a versatile compound talent.
Three, 20__ years of work ideas are as follows:
1. Strengthen on-site coordination and quality management to ensure smooth construction progress and timely completion of the construction period.
2, in-depth drawing review in advance, in view of the problems on the construction drawing, take out the disposal plan in advance.
3, conscientiously implement the leadership's work instructions, actively put forward reasonable suggestions to the leadership, and make more contributions to the project construction.
In the new year, I will redouble my efforts, do my job well, create value for the company, and look forward to a bright future with the company!
Assistant Engineer's Work Summary II
I have been working in Ningxia Hengmai Engineering Consulting Co., Ltd. since _ _ _ _ _ _ _. With the support and encouragement of company leaders and the assistance and cooperation of colleagues, I can finish my work well. My professional internship is summarized as follows:
Since I became a budgeter, I have been able to complete the operation and management of the company on time according to the rules and regulations of the state and the company. According to the requirements of the company, submit attendance records and monthly work schedule at the end of each month. Attend the meeting on time and make an analysis report of your own stage work.
Work attitude:
1. Obey the work arrangement of the company leaders and actively do all the work. I always put the overall situation first in my work. Actively participate in all the work of the company. Always finish the work arranged by the company on time with good quality and quantity.
2. Actively adapt to and abide by the implementation of the company's management system reform, and further strengthen the sense of responsibility. Since the beginning of this year, the company's rules and regulations have been improved or further improved. I always actively adapt to this situation, based on the company's current rules and regulations and the professional ethics of budget officers, strengthen my sense of responsibility, do my work well in time, and try my best to serve the enterprise.
3. Use the rest time after work to strengthen study. Pay attention to collecting current quota data files at ordinary times, and strengthen the study of business knowledge such as engineering quantity calculation skills. Study computer knowledge hard and improve your work efficiency. In the future, we should study harder and improve our own quality, so as to do our work better.
I finished the performance:
_ _ _ _ has completed _ _ _ projects since _ _; _ _ _ project; _ _ _ project; _ _ _ project; _ _ _ project and other engineering budget preparation and settlement audit work.
The construction drawing budget is the basis for determining the project cost, signing the construction and installation contract, implementing the investment contract between the construction unit and the construction unit, handling the project settlement, implementing economic accounting and assessing the project cost. When calculating, you should be careful, you can't calculate less and you can't omit it. At the same time, we should respect reality, don't over-calculate, don't overestimate risks, and don't take chances. Editing varies from person to person, regardless of the object and personal reasons. We should obey the truth, not stick to our own opinions, and maintain good professional ethics and our own reputation. On the above basis, ensure the accuracy and rationality of "quantity" and "price" and make a good budget for construction drawings.
The above is a summary of my work since my internship. During this period, I constantly improved my professional and technical knowledge through study, accumulated experience in practice, absorbed the strengths of others to make up for my own shortcomings, and made great progress in receiving goods combined with my own analysis and thinking. In my future work, I will redouble my efforts to improve my comprehensive quality and professional and technical level and meet more challenges.
Assistant Engineer's Work Summary 3
20__, came to the real estate engineering department of Hope Rose Garden in June, and was mainly responsible for the civil engineering management of Building 20 of Sanjiang Hope City. According to the arrangement of the company, I am now in charge of the site management of the 8# and 9# buildings.
One, 20__ years of personal work:
During the foundation trench excavation of 1.20 building, actively contact the earthwork construction unit and take the measures of "grasping in sunny days and grasping in cloudy days" to ensure the timely completion of earthwork excavation.
2. In the construction management of temporary slope support, the construction team is strictly required to construct according to the drawings, and the slope instability of the 19# building project is handled in time to ensure the slope stability and the safety of the 19# building project department.
3. In the management of pipe pile construction, strictly control the quality of pipe pile construction, combine with the geological conditions of the engineering site, and control the construction length of pipe pile to reduce the sawing length as much as possible under the condition of ensuring the design bearing capacity of pipe pile.
4. Because there is silt in the foundation trench soil and water comes out, it is suggested to dig a drainage well to drain water first, so as to reduce the groundwater level of the foundation trench and solve the problems in foundation construction in time and effectively.
Second, the shortcomings in the work and improvement methods
1, lack of communication, unable to make full use of resources.
In the process of work, there is little communication with colleagues and people in other departments, so we can't make full use of superior resources. Improvement method: In the future work, I will actively strengthen the communication between colleagues in this department and other departments, and realize resource sharing through the company's platform, so as to improve my business level.
2. The planning is not strong.
In the construction stage of project development, the scheme is not detailed enough, and the grasp of primary and secondary contradictions is not very accurate. Improvement methods: In the future work, we should carefully formulate detailed work plans, enhance the purpose of doing things, distinguish between primary and secondary contradictions, and strive to get twice the result with half the effort.
3, narrow professional scope.
To be a modern talent needs to be versatile, so as to meet the needs of the times and the company. My major is narrow, and I don't know enough about other real estate majors, especially marketing planning and relevant national policies. Improvement methods: In the future work, I will strengthen the study of this major and other majors, make full use of the company's resources, improve subjective initiative, and strive to become a versatile compound talent.
Iii. 202 1 The working idea is as follows:
1. Strengthen on-site coordination and quality management to ensure smooth construction progress and timely completion of the construction period.
2, in-depth drawing review in advance, in view of the problems on the construction drawing, take out the disposal plan in advance.
3, conscientiously implement the leadership's work instructions, actively put forward reasonable suggestions to the leadership, and make more contributions to the project construction.
In the new year, I will redouble my efforts, do my job well, create value for the company, and look forward to a bright future with the company!
Assistant Engineer's Work Summary 4
Since my work, I have made great progress and gained great gains in my thoughts, studies and work through my own continuous efforts under the careful training and teaching of the unit leaders. The work is summarized as follows:
Ideologically, we should use Scientific Outlook on Development's guiding ideology, respect practice, go deep into practice, seriously study and solve problems in practice, and constantly improve our ability to understand and solve problems. Insist on seeking truth from facts, constantly improve their political and ideological awareness and level, and constantly explore and pursue.
In learning, I have been strict with myself since I joined the work, and I take my work seriously. Theory comes from the fact that life is higher than life and should be reduced to life. I always remember learning constantly at work and combining theory with practical work. Constantly change yourself at work, put forward different requirements for yourself at the right time, constantly sum up experience at work, improve work ability, learn at work, and grow up gradually at work.
At work, after being assigned to the workshop, the first task is to be assigned to the site and work with the staff on site. During this period, I have been working diligently, cooperating with the field staff and obeying the arrangement. Good help and complete the task at the same time, I also have great gains. In order to enter a new working state in the shortest time, so as to finish my work better in the future, I personally realize that only by constantly learning new knowledge, mastering new skills and constantly improving my professional level and working skills can I meet the needs of my work and adapt to the development of society. In the process of work, learn from experienced colleagues the skills or skills that you don't really have, and apply them. Some information in the process of work is also collected and converted into information for later use; In my spare time, I read some professional books and websites, and also read some management books or websites to learn all kinds of knowledge and improve my comprehensive ability. In my future work, I will improve my quality through continuous study and practice, so that my progress can be synchronized with the development of society to meet the needs of my work. I know that as an engineer, I should have a correct attitude and a rigorous scientific style in my work. Equipment maintenance is a relatively hard industry, which needs meticulous work. It is impossible without an optimistic attitude towards life and a rigorous and scientific work spirit. Although my job is not to engage in scientific research, I must not be careless, because I know it is not easy to become a qualified engineer and technician. As a technician, we should not only be able to handle the website, but more importantly, we should be able to solve the problems that appear on the website. In order to improve work efficiency, it is necessary to solve problems invisibly in advance, which requires engineers and technicians to find problems well and solve them in time.
After nearly three years of working time, I have become more and more clear about the operation of the maintenance site, more and more familiar with the instruments and equipment, and closer to my colleagues. In addition, I have an overall understanding of all aspects of maintenance work. At the same time, we are gradually improving our understanding and learning of instruments, equipment and theories. During this period of work, my personal working ability has been improved to a certain extent, which is inseparable from the concern of leaders and the help of colleagues around me. In the future work, I will continue to work hard, make persistent efforts, be strict with myself, be realistic and innovative, constantly temper myself and do my best to do a good job.
Assistant Engineer's Work Summary 5
I am honored to be a new employee of _ _ _ _ _ _ limited liability company on _ _ _ _ _ 20. Since work, with the cordial care of the company leaders and the enthusiastic help of my colleagues, I have quickly integrated into the warm family of Barun. In the year of work, I can always remember my responsibilities, do my duty and do my job conscientiously. Now I will summarize the situation after work as follows.
First, the basic situation of professional work
Since my work, I have studied carefully according to the unified deployment of the company's leaders and the safety education and work content arranged by various departments and groups. My main job now is to learn how to drive a heavy harvester and how to produce safely to create benefits for the company. There is also the 5S that we are now in full swing. How to understand 5S and do it well is also the focus of our work. Driving heavy harvesters is my focus in the future, so now I have to practice hard, listen carefully to the master and learn more from his work experience. Create a safe working environment for yourself and others. 5S can make us have a clean and clear working environment, which can reduce many potential safety hazards in our work. Although it is very bitter and tiring now, it will bring great benefits to both individuals and companies in the future. The pain and fatigue now are nothing. Coming here will bring benefits to this place. We are no longer students. You can't get paid if you don't work hard. I must work hard.
Second, achievements and gains.
Ideologically, as a college student who has just joined the work, I always remind myself to put myself in a correct position, complete the two changes in an all-round way, put my ideological understanding first, seriously study the spirit of the current important meeting of the party and the country, and always keep up with the party. In the process of learning practical work experience and 5S rectification of the Group Company, we should give full play to our learning enthusiasm and initiative, comprehensively and systematically learn practical work experience and related theories, give full play to our own advantages, combine 5S with practical work experience, and organize and carry out various learning activities scientifically and reasonably. As a preparatory party member, I always remember party constitution, play an exemplary role, constantly strengthen my own study, improve my ideological quality, expand my creative thinking, and contribute to the company's development.
In life, unite colleagues in the unit and create a harmonious working environment. After coming to the unit, I quickly integrated into this group, and my leaders and colleagues also took special care of me, both at work and in life.
Always care about me, remind me and help me adapt to the new working environment. We work and play together, which makes me feel the warmth of my big family and inspires my enthusiasm for work. I will cherish this warmth and continue it.
At work, I have been insisting on leaving Man Qin this year without being late, leaving early and being absent from work. Strictly abide by the policies of the office. Remember the instructions and criticisms of leaders and put them into practice, do things carefully, record daily work and report them in time. In addition, be polite to others and be frank and tolerant with colleagues. Serious office discipline, no slack in work, no games, no small talk, no things unrelated to the work content. All activities organized by the unit can be present on time and actively participate. In August this year, I participated in the football match organized by the company, which not only achieved the goal of keeping fit, but also enhanced the teamwork ability and cohesion. In the 5S construction of the whole company, I actively cooperated with the leaders by learning the 5S essentials of "sorting, rectifying, cleaning, sweeping the floor and reading". At work, what I think of is not where it is easy and where the responsibility is small, but where I need to go. By actively working with the comrades in the class to find ways and countermeasures, and through several months of intense work, the situation has changed in the shortest time, so as to find the next job.
Three. Problems and shortcomings
I have the following problems in my work that need to be corrected in my future work and study. I'm not nervous enough in my mind, and I don't ask much of myself. I need to further strengthen my work and I am not familiar with my business. I need to further improve my professional quality. In terms of lifestyle, the standard of self-demand is not high enough and needs to be further strengthened. In addition, the work efficiency is not high, and there is potential to be tapped. Working methods need to be improved, and we need to learn from experienced masters. Although you can do a good job record, it is a mere formality, not practical enough, and can not achieve high results. Efficiency is an important factor in doing a good job, and it is particularly important to improve work productivity. In the future work and study, we should strive to strengthen political study and improve our political literacy and consciousness. In addition, it is necessary to improve personal cultivation and strengthen business learning ability to improve their professional quality and thus improve the quality of work. Moreover, we should work creatively, think more about improving working methods and improving work efficiency. Draw lessons from previous work, make preparations before each work, avoid making the same mistakes again, actively complete your work, and don't fight unprepared battles. Strengthen communication with the institute, so that the leadership's supervision work is deeper.
Four. Countermeasures and suggestions
As a young worker, I dare not slack off in my work. I ask myself to be diligent, take more notes and records, and try to write down the gains and losses in my work and the problems that appear every time to learn from them. Diligent, ask more questions, ask more old comrades and experienced comrades when you encounter problems or difficulties in your work; Be diligent, listen to the good opinions and suggestions put forward by colleagues and improve your work. The year of 20 1_ passed quickly. I stayed in Barun for nearly half a year, during which I learned a lot. I am very grateful to the company for providing me with a platform for growth, so that I can continue to learn and progress in my work and gradually improve my quality and talents. Improve ideological understanding, strictly abide by the company's rules and regulations, and demand yourself with the standards of excellent workers.
Looking back on the past year, the company accompanied me through a very important stage and let me know a lot. In the future, I will study hard scientific and cultural knowledge, integrate theory with practice, improve my professional quality, and keep innovating in my future work. Strengthen communication with colleagues, enhance the feelings between colleagues, and try your best to help colleagues no matter what troubles they encounter. Be strict with yourself and set an example in everything. Here, I would like to express my heartfelt thanks to the respected leaders and dear colleagues of the company. With your help, I can be handy in my work. With your help, I can put the company's development in by going up one flight of stairs. I hope that in the future work, leaders and colleagues can, as always, point out my shortcomings and deficiencies, let me constantly improve myself and make better contributions to the construction of the company.
Summary of Assistant Engineer's Work (5 Summaries) Related Articles:
★ Five Selection of Assistant Engineer's Work Summary
★ Five essays summarizing the work of assistant engineers.
★ Five latest model essays in 2020: annual work summary, assistant engineer.
★ Four short articles summarizing the personal work of assistant engineers.
★ Excellent model essay for assistant engineer's work summary
★ Model essay on personal work summary of assistant engineer
★ Assistant Engineer's latest work summary.
★ Highlights of Assistant Engineer's Work Summary
★ Selected model essays of assistant engineer's work summary
★ Personal annual work summary, assistant engineer