Traffic situation in Xiangchuan county

1988 The opening of Seto Bridge connecting Shikoku and Honshu greatly improved the traffic between Okayama Prefecture and Kagawa Prefecture in Shikoku, bringing great convenience to industrial activities and residents' lives. It took nine and a half years and cost 1 trillion 65438+20 billion yen. It consists of six sub-bridges, with a total length of 12.3 km, of which the offshore part is 9.4 km. It is the largest railway and highway bridge in the world.

Song Xingao airport opened on 1989. It has the longest runway in China and Shikoku, and is a modern airport. Since its opening, chartered flight flights with Seoul, Hongkong, Hawaii and Singapore, and international scheduled flights with Seoul have been opened.

Takamatsu Airport has been opened to Shanghai, and this route is implemented by low-cost airline Spring Airlines.

Shanghai-Takamatsu, about 120 minutes.

Expressway, which passes through the four countries, is a 45 1 km expressway connecting Anan City in Tokushima Prefecture and Dazhou City in Ehime Prefecture. The sections from Shan Tong Temple in Xiangchuan to Fengbang and Gaosong to Shan Tong Temple were officially opened to traffic in 65,438+0987, 65,438+0991year respectively. Seoul-Takamatsu Airport, South Korea, about 1 hour for 45 minutes;

Takamatsu Airport -JR Takamatsu Station (Qindian Bus), about 40 minutes;

Takamatsu Airport -JR Qin Ping Station (Qinkong Bus), about 50 minutes;

Takamatsu Airport → Tokyo, about 75 minutes;

Takamatsu Airport → Sapporo, about 120 minutes;

Takamatsu-Okayama, JR express seaside train, about 55 minutes;

Takamatsu-Kansai International Airport, express bus, about 3 hours and 32 minutes.