Qidao Expressway refers to the expressway from Qidong County to Daoxian County in Hunan Province. The line starts from Qidong County, connects Loudi to the Qidong Interchange of Hengyang Expressway, passes through Qidong County and Lingguan Town, enters Yongzhou at the junction of Qidong and Qiyang, passes through Qiyang County, reaches the intersection of Maping and Erguang Expressway in lengshuitan, passes through Lengshuitan District, crosses Hengzao Expressway about 2 kilometers east of Niaotangpu, and passes through Lingling District and Lingguan District.
brief introduction
Qidao Expressway is regarded as a construction project in Yongzhou, which will be able to get through the north and south of Yongzhou, cross Shuangpai Mountain and quickly connect Qiyang, Lengshuitan District, Shuangpai and Daoxian. According to reports, it will only take more than an hour from lengshuitan to Daoxian in the future, while it took an hour to climb Shuangpai Mountain in the past.
I. Basic information of the project
(1) Route and main control points. Qidong-lengshuitan-Daoxian Expressway (referred to as Qidao Expressway for short) has been included in the expressway planning network of Hunan Province in the Twelfth Five-Year Plan, and it is one of the projects in the list of major projects in Hunan Province in the Twelfth Five-Year Plan (Xiang Guofa (20 1 1) 10). The project starts in Qidong County, connects Loudi to Hengyang Expressway, passes through Qidong County and Lingguan Town, enters Yongzhou at Liangjia Village at the junction of Qidong and Qiyang, passes through Qiyang County, reaches the intersection of Maping and Erguang Expressway in lengshuitan, passes through Lengshuitan District, crosses Hengzao Expressway about 2 kilometers east of Niaotangpu, and passes through Lingling District, Shishanjiao Town, Wulipai Town and Shuangpai County.
Main control points of the line: Qidong County, Qiyang County, Lengshuitan District, Lingling District, Shuangpai County and Daoxian County.
(2) Construction scale and investment estimation. The total length of Qidao Expressway is 2 10 km, including 30 km in Hengyang and 180 km in Yongzhou. Two-way four lanes. The subgrade from lengshuitan to Lingling is 26m wide and the design speed is 100km/h, while the rest sections are 24.5m wide and the design speed is 80 km/h.
The estimated total investment of the project is 654.38+05.34 billion yuan, including 30 kilometers in Hengyang, with an estimated investment of 2 billion yuan; Yongzhou 180km, with an estimated total investment of133.4 billion yuan. In Yongzhou180km, Qiyang is 44km away from lengshuitan, with an estimated investment of 2.54 billion yuan, and lengshuitan is 0/36km away from Daoxian 108 billion yuan.
Investment benefit analysis
The construction period of this project is * * * three years. It is planned to complete the preliminary work in 20 13, and start construction at the end of 20 13. There are 13 toll stations along Qidao Expressway, including 4 toll stations from Qidong to lengshuitan (Huangyangsi, Qiyang, Lingguan and Qidong County). It is estimated that the daily traffic flow (converted into automobiles, the same below) will be 8,853 vehicles in 2065, and 438+07 vehicles and 45,660 vehicles in 2045. There are 9 toll stations from lengshuitan to Daoxian * * * (lengshuitan North, lengshuitan East, Lingling, Fujiaqiao, Shuangpai, Shangrenli, Daguping, Meihua and Daoxian East). It is estimated that the daily traffic flow will be 7204 vehicles in 2065 and 438+002 vehicles in 2045.
Preliminary work situation
The municipal party Committee and municipal government attached great importance to the preliminary work of Qidao Expressway and decided to build Qidao Expressway with the help of the whole city. A leading group for preliminary work coordination was established with the mayor in charge as the team leader. The office of the leading group is located in the Municipal Transportation Bureau, and a special group is organized to carry out the preliminary work. The whole line is divided into two parts to carry out the preliminary work of the project. 20 1 1 June, the Planning Department of Hunan Provincial Department of Transportation has entrusted the Second Hospital of Communications with the pre-feasibility study of Qidong-lengshuitan project, and entrusted the Hunan Provincial Traffic Survey and Design Institute with the pre-feasibility study of lengshuitan-Daoxian project. 20 1 1 In the middle of June, two design institutes completed the first draft of the pre-feasibility report and passed the experts organized by the design institutes. The pre-feasibility study report of the whole project has been completed. On March 15, the municipal government held a meeting to solicit the opinions of the county governments along the line on the route direction. Considering that the project is a local expressway, the Provincial Department of Transportation does not conduct pre-feasibility review, but directly conducts feasibility study and design. It is expected that the compilation of the feasibility study report will be completed in May, the feasibility study review will be completed in June, and the relevant special reports will be completed by the end of the year, which meets the requirements for feasibility study approval.
Yongzhou Traffic Construction Conference introduced the Qidong-lengshuitan-Daoxian Expressway project, and built the Qidong-Daoxian Expressway with the strength of the whole city.
The above is the introduction of Zhong Da Consulting of CBI to Qidao Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.