Debugging of Control Instrument in Vulcanization Room of Shangyu Binbin Experimental Instrument Factory

1. Place the controller in a ventilated and dry working environment. After the controller is placed stably, check whether all kinds of power supplies fall off during transportation, and check whether there is a shell attached with a multimeter. After everything is normal, connect according to the wiring diagram.

2. Fix one end of the water pipe on the faucet, connect the switch inside, open the faucet and add water.

3. Hang the sensor directly in the curing room and fill the humidity sensor with water.

4. Press the buttons of power supply, heating, refrigeration and humidification in turn, and immediately enter the working state together.