Personal professional and technical summary model essay 3

No matter in which industry, young professional and technical personnel will always be the future of the world, especially in our geological prospecting industry, we need young professional and technical personnel with dedication. This article is my personal professional summary essay for your reference only.

Personal professional and technical summary model:

I am 20__, graduated from the Automation Department of Inner Mongolia University of Science and Technology, majoring in measurement and control. 20__, I came to Zhuozi Power Plant to do thermal maintenance of 200MW units. In these five years, I have made unremitting efforts to learn professional skills, constantly improved my professional level, and organically combined the textbook knowledge I learned in school with practice from theory to practice, thus enriching my mind, arming my talents and becoming a professional and technical expert. Looking back on the past few years, I am full of learning professional skills, love of work and hard work. The summary is as follows:

First, we should constantly strengthen our study, be strict with ourselves, improve our comprehensive quality and meet the needs of modern power plants. With the development and progress of society, the development of electric power production is becoming more and more modern. The dust removal, ash removal and slag removal systems of four units in our factory are all controlled by PLC program control system, which is highly automated. In order to control the system better, the knowledge that needs to be mastered must be more comprehensive and solid to adapt to the development of power system. In order to meet the needs of modern power plants, I strengthened the training and study of computer knowledge, learned network knowledge, PLC and DCS system knowledge, and learned logic and configuration from manufacturers, which laid a solid foundation for the future thermal inspection work. During this period, I have a deep understanding of the working principle, composition and assembly of the microcomputer, especially the operation of the computer, which makes me quite skilled in the operation of the on-site microcomputer, ensures the safe and stable operation of the unit and wins time for accident handling.

2. It has been five years since I came to the company to major in thermal engineering. In the last two years, I served as the head of the thermal boiler group and the head of the thermal steam group respectively. Thank you very much for your help and guidance. In the past two years, I not only have a more comprehensive development in professional technology, but also have more learning opportunities in dealing with people.

In 20__, when I was in the hot peripheral group, I worked as the director for 2 years. There are many kinds of peripheral thermal equipment, but it also creates an opportunity for me to learn, that is, I am fortunate to know the DCS control system and the PLC logic control of the slag and ash removal system, and have a preliminary understanding of the installation position and use of measuring components in maintenance. It is these two years' unremitting efforts that have laid a solid foundation for my future road.

In July, 20__, I had the honor to participate in the thermal training organized by Huadian Group Corporation. During the training, I mainly studied PLC and thermal automatic control in power plant. Through this training, I have a deeper understanding of the structural layout and network connection of DCS control system, which is of great help to the future thermal maintenance work and provides more basis for judging faults in the future maintenance work, thus better ensuring the safe operation of the unit.

During the period of 20__, the slag discharge door of the coal mill is maintained as a pneumatic valve, and the connecting part with the cylinder is a plastic pipe. During repeated maintenance, it is found that the temperature of coal pulverizer is very high during slag discharge, and it is easy to burn out the air supply pipe connected with the cylinder, and the air supply pipe is often replaced, resulting in unnecessary economic losses. Therefore, the air supply pipe is changed to iron pipe, and the effect is obvious after the transformation, and the number of coal mill shutdowns caused by the fault of slag discharge door is greatly reduced.

During the period of 20__, he served as the group leader of thermal professional boiler, participated in the overhaul of # 1 unit, the transformation of boiler oil gun and coal feeder, and got a detailed understanding of thermal equipment. At the same time, during the transformation of coal feeder totalizer of Unit #2, I mastered the protection and control of coal feeder in all aspects, and put forward some changes, which facilitated the control of coal quantity of coal feeder and made the boiler burn. In the transformation of coal feeder, I put forward the PLC transformation suggestion of coal feeder and won the third prize of rationalization suggestion. The specific reconstruction is as follows:

Through the combination of PLC and totalizer, the original coal feeder realized remote local control of coal quantity and related alarm. It is found that the PLC of local coal feeder control cabinet has poor field environment and is prone to failure during operation, so it is suggested to change to contactor circuit, and the alarm is realized by DCS, which can not only meet the remote control but also realize the corresponding alarm, greatly saving the equipment cost and its failure rate. From June+10, 5438, I participated in the transformation of heating network control station, which not only got a preliminary understanding of the new heating network system, but also consolidated the knowledge of DCS and DEH system, namely, the network loop of DCS and its control internal structure, logic loop, card connection loop, card communication part of DEH, the establishment of communication mode between upper computer and lower computer and the call of upper computer trend.

During the period of 20__ _, I served as the leader of steam turbine specialty in thermal energy engineering. In July, I was fortunate to participate in the improvement of the coordinated control system. Under the guidance of experts from Daqi Power Plant, I successfully completed the logical modification of the coordinated control system of four units, and finally realized the coordinated automatic control. Although the debugging time is short, it is very enlightening to my major. Since I left school, I realized that what I learned at school is closely related to our life and work.

In a word, because I majored in thermal automation at school, I have a comprehensive understanding of machinery and boilers in theory, and combined with years of on-site operation practice, I have been strict with myself from ideological understanding to on-site work, and I have constantly worked hard to learn my professional level, accumulated rich on-site experience, and analyzed and handled many accidents.

So my comprehensive quality has been greatly improved. At the same time, during my years in Zhuozi Power Plant, from infrastructure to production, from operation to maintenance, from the compilation of regulations to the establishment of rules and regulations, from the training of personnel to actual operation, I really felt that these years were very hard, but I also accumulated a lot of professional experience for myself, especially from infrastructure to production, and I benefited a lot. I hope to contribute to the power plant with my light and heat.

Personal professional and technical summary model:

I graduated from the School of Civil Engineering and Architecture of Wuhan University in June 2000, and was assigned to work in Shenzhen Shen Zheng Power Supply Service Co., Ltd., where I was engaged in project management, project bidding, pre-settlement and project business contract. Since I joined the work, I have strictly abided by the laws and regulations of the country and have never participated in any illegal and disciplinary activities. Firmly support the leadership of the China Producer Party, adhere to the Party's reform and opening up, take the "Theory of Three Represents" spirit as the action program of their work, and make their due contributions to building socialism with China characteristics. Proactive, pay attention to ideological quality training and comprehensive ability building, and strive to become a new professional manager with firm belief, strict discipline, extensive knowledge, skilled business, able to adapt to the requirements of market economy and competent for all kinds of work. I strictly abide by the rules and regulations formulated by the unit, be strict with myself and be lenient with others, and play an exemplary role. At work, I have been studying, researching and summing up experiences and lessons. From a layman in the power industry to a project manager with comprehensive and mature professional technical requirements and management capabilities, he independently undertook the on-site management of power projects and made great achievements in political thought, professional ethics and professional technical level, which are summarized as follows:

I. Political thoughts

In my work, I am very supportive of the party's policies and guidelines. I insist on watching news broadcast TV programs every day, caring for and learning about the current affairs and politics of the country, applying the party's political thoughts and principles to engineering construction, often having discussions with project department personnel, and organizing project department personnel to seriously study and publicize the party's policies and principles. I earnestly study and understand the spirit of the Party's "Theory of Three Represents" and "16th National Congress", take "Theory of Three Represents" as my work criterion, take the spirit of 16th National Congress as my goal, and make a modest contribution to the cause of building a well-off society in an all-round way.

Second, work attitude and professional ethics

Since I joined the work, I have loved the power industry and worked hard. I have been away from Man Qin since I took office. I always go to work early and get off work late. I have something to ask for leave from the leader. Project management is a very rigorous work, and I can't be careless in every process and every link. Every time I receive a project, I have a high sense of responsibility, thinking that I must do my best to manage the project well. Over the past few years, I have been mainly responsible for completing the 1 10kV power transmission and transformation project, the IOkV distribution network project, and hundreds of maintenance and technical transformation projects. In project management, in order to adapt to the development of market economy, we actively carry out the company's project target management responsibility system, determine the key and difficult points of work every year, clarify the tasks and make reasonable arrangements, so that we can gradually develop from a professional and technical personnel to a management-oriented employee. Looking at the completion of the tower and cable, I feel extremely proud and glorious. I have paid countless hardships and sweat, won the praise of the society, and won the praise of leaders and comrades. I have no regrets and contentment.

Third, knowledge level and professional ability.

At work, I constantly learn cultural knowledge and professional knowledge, further improve and enrich my knowledge structure, and strive to improve my knowledge level and professional quality. Power engineering is a new field exploration for me. For the new norms, standards and quotas of the power industry, every time they are introduced, I buy them, study them carefully, master them, apply them to engineering construction, and constantly sum up experiences and lessons. In order to master more business knowledge and adapt to the professional work, I participated in the training of project managers of national construction enterprises in 20__, and combined with my rich construction experience accumulated over the years, through systematic study, my comprehensive quality in engineering technology, project management, engineering economy, laws and regulations has reached a new level. Since I became an electric power engineer for 20 years, I have participated in the site management of many major projects, accumulated rich construction technology and management experience in long-term engineering practice, and improved my professional technology and professional theoretical level through my own continuous practice, continuous summary and study. During my tenure, I studied hard, actively innovated, courageously shouldered heavy burdens, worked conscientiously and practically, and was fully competent as an engineer. During his tenure, he published three papers successively, which contributed his meager strength to the power construction of our city.

Four, project management and project bidding

As we all know, the quality of enterprise construction project management directly affects the economic, social and environmental benefits of enterprises and plays a decisive role. It mainly involves three aspects: project cost, schedule and quality technology. As a project manager, it is undoubtedly necessary to fully understand and practice the specific contents and relationships of the above stages. Project management is a complicated and changeable work, and the quality of management is directly related to the economic and social benefits of the project. Engaged in management for many years, I think project management is a system of overall arrangement, rational utilization and comprehensive management. Personnel, materials, machinery and articles should be carefully organized, deployed and rationally utilized. Maximize the management of safety production, adhere to the policy of "safety first", ensure the quality of the project, adhere to the principle of "survival by quality", strictly control the quality of the project, strive for the rapid progress of the project, abide by the construction contract, reduce the project cost, and create the project with the best quality, the safest production and the lowest project cost in the shortest time. Mainly responsible for "1 10kV Luofang Substation Project", "1 10kV", "and so on.

Project bidding is another core of my work. Bidding is a competitive activity for construction enterprises to obtain engineering construction tasks by economic means such as quotation. Bidding and quotation is a difficult comprehensive thinking, judgment and decision-making process that combines science and skills, which means that decision makers must have rich experience in construction and quotation, and also need the strong cooperation and collective strength of budget personnel and engineering and technical personnel. In the process of bidding, I often lead relevant personnel to the construction site, Construction Bureau, Guangzhou and other places for on-site inspection, collective research and discussion, and can successfully complete our bidding work. In my spare time, I study the budgeting software carefully, get familiar with the calculation rules of electric power engineering quantity, systematically study and master the basic theory and knowledge of project cost, and have the business ability of project budget estimate, budget, final accounts, pre-tender estimate, tender quotation preparation, project change and contract price adjustment, claim cost calculation and project cost control at all stages of construction projects. Let yourself be truly armed and become a qualified project bidding manager.

The electric power industry is an industry with deep knowledge and wide knowledge. It can be said that it is an industry of "providing for the old and learning for the old". In my future work, I will study cultural knowledge and professional knowledge harder, keep practicing, do my job well and make more contributions to society.

I have met the requirements for applying for senior engineer, and hereby apply for promotion to the title of senior engineer.

Personal professional technical summary Fan Wensan:

1July, 996, successfully completed his studies, graduated from the Woodworking Department of Hefei University of Technology, majoring in urban water supply and drainage, and was assigned to the former _ _ _ _ _ _ _ _ _ _ _ _. I have been engaged in _ _ _ and management since I joined the work. /kloc-0 obtained the qualification of assistant engineer in August, 1999, and started to work that month. The following is a comprehensive summary of my work in the past eight years from a professional and technical point of view:

First, learn professional knowledge and improve job skills.

I officially started working in July 1996, and was assigned to work in _ _ _ _ _ _ _ _ _ _ _ _. At the beginning of my work, I found that the professional knowledge I learned at school was very different from the actual work. In order to change my role as soon as possible and adapt to the requirements of my work, I study my professional knowledge and improve my job skills. In a short period of six months, through my own efforts and the help of my colleagues, I have been able to skillfully carry out complicated daily affairs such as _ _ _.

Second, political thought.

Politically, I am strict with myself, actively participate in various political activities, consciously study political theory, pay special attention to the study of Theory of Three Represents Theory, and strive to improve my political theory literacy and practice Theory of Three Represents. I have a strong sense of the overall situation and organizational concept. I put my career first in my work, regardless of personal gains and losses, straighten my position in my new post, and put _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ in my work. Pay attention to investigation and study, be diligent in thinking, and have clear working ideas. Can combine the general theory of scientific research management with scientific research practice, and actively make suggestions and suggestions for the system to formulate practical scientific research development goals and measures. Be unequivocal in the face of right and wrong, and play an exemplary role in the development and reform of the cause of _ _ _.

Third, organization and coordination

In practical work, I study hard to analyze, study and solve problems with Marxist standpoints, viewpoints and methods, and have certain organizational coordination and scientific decision-making ability. Pay attention to the study of modern scientific research management knowledge and master the general laws of scientific research management in humanities and social sciences. As a part-time _ _ _ manager, I can help the department head to do a good job in the ideological and political work of employees, which provides a guarantee for the effective development of the department work. In the work, we fully believe and let go of the department-level cadres in charge, and pay attention to training, which has played their role well.

Fourth, business ability.

Since I joined the work, I have worked hard to learn the theoretical knowledge and professional skills of my major, attached importance to constantly improving my professional level and teaching ability, and strived to improve my professional technical ability and level through different forms of study in my spare time according to the actual needs of management work. Through years of hard work, my professional skills and ability to control my work have been greatly improved, laying a solid foundation for better completing various tasks. Since joining the work, he has been awarded the honorary title of "Advanced Individual in Management in the City" for many times.

Verb (abbreviation of verb) continues education and learning.

In order to better adapt to the current land management work, and strive to do their own work. I attach great importance to further study and have participated in technical training organized by various departments many times. In June of 20 years, I participated in the first phase of _ _ _ _ _ senior secretary vocational training and obtained the professional qualification certificate of senior secretary. Since I joined the work, I have actively undertaken all the work of _ _ _ management, and I can be conscientious and successfully complete all the tasks assigned by the organization. I have never been affected by my personal affairs, and I have always been able to actively participate in various activities organized by the government. Because of his excellent work, he has been affirmed by the bureau leaders many times.

Six, professional scientific and technological achievements

Since joining the work, I have actively participated in the preparation of the Tenth Five-Year Plan for the management of this system, and published more than 20 professional papers and information manuscripts in newspapers and magazines, including _ _ _.

Seven. existing problems

_ _ There are not many representative works and highlights of management work, insufficient innovation, insufficient investment in scientific research, and the decision-making ability and level of scientific research management need to be improved, with few major achievements. In the future work, I will definitely study harder, use what I have learned to explore the basic laws of protection work, constantly improve my working methods, improve my work efficiency, be down-to-earth, work hard, and become a qualified _ _ management professional and technical personnel.