The new campus of Foshan Second Hospital is located in the Green Island Lake area and is expected to be completed in 2023. It is understood that the construction project of the new campus of the Second Hospital of the City is an important measure to build a "healthy Foshan". It was built by the government with an investment of more than 2 billion yuan. The site selection is determined in the Lake District of Green Island, which covers an area of about 120 mu and is expected to be completed in 2023. The new hospital is a smart hospital integrating science and technology, ecology and humanities. After completion, it will have 1.200 beds, filling the rare situation that there is no third-class first-class hospital in Zen West District.
In addition, there is good news from the rail transit in the Green Island Lake area. The first train of Foshan Metro Line 2 rolled off the assembly line. It is expected that Foshan Metro Line 2 will be put into trial operation in September 20021year. The first phase of Foshan Metro Line 2 starts from Nanzhuang, Foshan, passes through Shiwan, Qi Kui Road and Huahua Avenue, and connects with Guangzhou South Railway Station. The total length of the line is 32.3 kilometers, with a total of 7 stations/kloc-0. After the completion of Line 2 and Line 3, you can reach Guangzhou South Railway Station from Nanzhuang Station within 40 minutes.
Therefore, medical care, transportation and other fields have been greatly improved, and it is not surprising that this property has skyrocketed.