How to deal with the renovation of new houses?

Many new house decoration owners are actually white people, and I learned about the decoration step by step from the very beginning. Many owners may have just completed the transfer of their houses today or just got the key to the new house, so congratulations on becoming the prospective owner of the new house decoration.

Then, after everyone becomes a prospective car owner, some friends are extremely experienced. There are several houses installed at home, and some can even set up their own decoration teams.

But we have more owners who are still a little confused about the renovation of new houses. What should we do if we have a new house?

We need to solve several problems.

First of all, how many ways to decorate?

There are generally four ways to decorate.

The first one is called a cleaner.

The second type is called Kisuke, also called semi-package.

The third kind is called big bag, also called all-inclusive

The fourth kind is called set meal, also called set meal.

The second problem is the renovation period.

Many friends attach great importance to this. After the decoration method is determined, the next step is to estimate the decoration time.

Decoration time is usually divided into three areas, called morning, middle and evening.

It usually takes 18 days to 15 days to find a decoration company, a designer and a foreman in the early stage.

In the medium term, the construction is officially started, the wall is demolished, and the hydropower transformation is carried out. The construction period of a bricklayer is about 45 days to 60 days.

The later period of furniture installation and soft decoration is about 18 days to 15 days.

All the above are calculated according to the regular time, that is, the cycle length of the general decoration period.

It involves a detailed decoration design scheme, and there are many factors that affect the decoration, such as large house area, high-grade decoration design scheme and so on. Including the weather, the extension of the construction period is also normal.

But it can't be postponed for too many days, because if the time is postponed for too long, it will have a direct impact on our next decoration. When we sign a contract with the decoration company, we must set a good decoration period for our home.

It is not enough just to determine the time limit for a project. There are still some hardware to be determined in the decoration. What is given to you by the decoration company and what do you need to determine in advance? This is very, very critical. Everyone must know what he should buy.

The third is how much decoration budget should be prepared?

This is what many owners are most concerned about, that is, how much will it cost to decorate this house?

Spending money should come first.

Many friends have asked me how much it costs to install a 100 square meter house. This is said separately at the actual construction site, and you will naturally understand how much money to prepare for the renovation of the new house.

Let me briefly talk about it here. In Wuhu market, a simple decoration, let's take a house with a square of 100 as an example.

Very simple decoration, I mean this decoration is based on the fact that you can move in, and the cost is between 40 thousand yuan and 60 thousand yuan.

The middle and low-grade decoration is probably between 50,000 and 80,000, which is relatively low.

Mid-range decoration, buying furniture and household appliances, if these are counted, it is probably between 65438+ 10,000 and130,000.

/kloc-high-end decoration of 0/00 square meter house, 1.6 thousand to about 250 thousand.

Luxury decoration, 100 square meter house, is generally not a luxury decoration at home, so don't consider this issue.

So how are these calculated?

There is a formula that decoration accounts for 60% of the total cost, furniture accounts for 20% of the total cost, and home appliances and fabric decoration account for 15% to 20%.

So how is the decoration 60% calculated? The normal algorithm is that the design fee accounts for 5%, then the material accounts for 25% to 30%, and the labor cost accounts for 15% to 18%.

Regarding the budget for the renovation of new houses, I think it can really be made clear at the actual construction site!

Finally, briefly talk about Internet decoration.

Many friends may trust Internet decoration and find it cost-effective.

In fact, the internet decoration, this model feels to subvert the traditional home improvement model. In fact, it is a platform model, integrating and optimizing resources of all parties, so that the benefits can be completely disintermediated to end consumers.

In order to ensure the quality of the project, the wall tiles, floor tiles, floors, sanitary wares, cabinets, wardrobes, topcoats and ceilings, which are the necessary main materials for home improvement, are all provided for you, and the price is the lowest for you, plus the design labor and accessories, the whole set is packaged and sold for you.

However, in these big cities, this model is a bit unworkable. Why?

Because there is no profitable service, there will often be huge problems in the later stage. In order to implement a new model in the market, we need the assistance of various factors.

In particular, some core leading factors, such as the problem of workers, originally a day 100 yuan of human labor costs, in the Internet decoration mode, 30 yuan can only do one day's work.

I also hope that the internet decoration is conducive to the decoration of our owners, but the ideal is full and the reality is very skinny.

In summary

How to deal with the renovation of new houses?

We need to solve several problems.

1, know how to decorate.

2. Determine the renovation cycle.

3. Make a decoration budget

Thank you for reading my article, and you are more welcome to pay attention to the decoration!