Consultant (full name):
This contract is signed by both parties through consultation.
1. The Client entrusts consultants to provide cost consulting services for the following projects:
2. The wording and terms of this contract are synonymous with the conditions of the construction project cost consultation contract and related annexes.
Three. The following documents are an integral part of this contract: standard clauses of construction project cost consultation contract; Special terms of the construction project cost consultation contract: * * * Supplementary and revised documents signed during the execution of the construction project cost consultation contract.
Four. Counselor is synonymous. According to the provisions of this contract, they should undertake the construction project cost consulting business within a certain scope specified in the special terms and conditions of this contract.
5. The client shall pay the corresponding remuneration according to the time limit, method, currency and amount stipulated in this contract.
The construction project cost consultation business of this contract is implemented from October 26th, 20xx165438+/kloc-0+May 5th, 20xx 65438+February 65438.
Seven. This contract is made in quadruplicate, with the same legal effect, and each party holds one copy.
Client: (Seal) Consultant: (Seal)
Legal representative: (signature) Legal representative: (signature)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Employer (Party A) of Engineering Technology Management Consulting Contract 2: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Legal Representative: _ _ _ _ _ _ _ Title: _ _ _ _ _ _ _
Consultant (Party B): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Legal Representative: _ _ _ _ _ _ _ Title: _ _ _ _ _ _ _
In order to make the construction and installation project of _ _ _ _ _ scientific in conception, economical and reasonable in design and construction, fast in construction speed and small in error, Party A and Party B hereby sign this contract through full consultation. ..
Article 1 Party A shall, before _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 2 Party B shall, according to the requirements of Party A, conduct a feasibility study on the topography, geological conditions and construction and installation ideas of _ _ _ _ _ _ _ _ _ _.
Article 3 Party A shall pay the consulting fee of RMB Yuan to Party B according to the engineering design charging standard stipulated by the national competent department. Party A shall pay Party B RMB _ _ _ _ _ within _ _ _ days from the date of signing this contract, and Party A shall pay Party B RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ..
Article 4 The travel expenses of personnel who need to go to other places for investigation and data collection due to this consulting project shall be borne by Party A. ..
Article 5 Party A's liability for breach of contract
1. If Party A fails to deliver the relevant documents, drawings and materials to Party B within the time stipulated in this contract, Party B may postpone the delivery of the design task book and estimation table according to the delayed time.
2. If Party A fails to pay the consulting fee to Party B within the time stipulated in this contract, it will be fined at _ _ _ ‰ of the delayed delivery amount for each day of delay.
3. If Party A interrupts the consultation request halfway and Party B has completed more than half of the consultation work, it shall pay all the consultation fees to Party B; If the consulting work is not over half, it will be charged at 50% of the total consulting fee.
Article 6 Party B's liability for breach of contract
1. If Party B fails to deliver the design task book and estimation table within the time stipulated in this contract, it will be fined at _ _ _ ‰ of the total consulting fee for each day of delay.
2. If Party B interrupts the consultation midway, it shall pay a fine to Party A according to the total consulting fee.
3. Where Party B's technical consulting services cause economic losses to Party A due to quality defects or failures, it shall be responsible for compensation. If a major accident is caused and serious consequences are caused, the administrative responsibility or criminal responsibility of the main responsible person should also be investigated.
Article 7 Other agreements _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party A and Party B shall not change this contract at will from the date of signing. Matters not covered herein shall be settled by both parties through negotiation.
The original of this contract is in duplicate, each party holds one copy, and the copy of this contract is on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Employer (Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Person in charge: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Consultant (Party B): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Person in charge: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Entrusting party of engineering technology management consulting contract (Party A) 3:
Trustee (Party B):
According to the provisions of the Civil Code of People's Republic of China (PRC), the two parties to the contract have reached an agreement through technical consultation and signed this contract.
I. Contents, forms and requirements of consultation:
1. Party A entrusts Party B to undertake the preparation of the project proposal of Gaoxin No.2 Road (Zheshuwan Road in the outer ring) open space greening project;
2. Main contents of technical consultation: The contract project includes the preparation of project proposal. The main contents include necessity, demand forecast, engineering scheme, environmental protection, implementation progress, investment estimation, fund raising, economic evaluation and benefit analysis, necessary social benefit evaluation and research conclusion, etc.
3. Party B's project proposal must meet the approval requirements of Party A and pass the approval of government-invested projects.
Second, the way of expression
Party B shall submit four technical consultation reports within 30 working days after accepting the entrustment of Party A and collecting all the information needed for technical consultation.
Three. Entrusting party's cooperation matters:
Within _ _ _ _ days after the Contract comes into effect, the Client shall provide the Consultant with the following information and working conditions:
1, detailed planning of construction project;
2. Topographic map of construction project area 1: 500;
3, the construction project demolition information;
4. Other relevant information.
Four. Confidentiality of technical information and materials:
Party B shall keep all information of this project confidential and shall not disclose it to any party without Party A's permission.
The third party transfers, copies or provides all the information of this project in any other form.
Party A shall keep the technical consultation results of this project confidential and shall not disclose them to anyone without Party B's permission.
The third party transfers, copies or provides the technical consultation results of this project in any other form.
Verb (abbreviation of verb) intellectual property
(1) Party B guarantees that the technology, articles, inventions or knowledge and technological achievements used in the consulting service of this project or provided to Party A will not infringe upon any.
Third party rights; In addition, if Party B uses goods with intellectual property rights, the expenses required for the process and invention shall be borne by Party B. ..
(2) Party A shall not be infringed or compensated by any intellectual property rights such as patent right, trademark right, copyright or industrial design right caused by Party B's consulting services when using the consulting results under this contract. In case of any dispute or controversy due to the above reasons, Party B shall bear all the responsibilities, and Party A shall not be responsible.
Remuneration and payment methods of intransitive verbs:
(1) Remuneration for this project (consulting fund):
(2) The consultation fee for this project is calculated according to the Notice of the State Planning Commission on Printing and Distributing the Interim Provisions on Consultation Fee for Construction Projects (total price: 20 1283), which is 60% of the estimated investment grading fee standard for construction projects, and the adjustment coefficient of the estimated investment grading fee for construction projects is 0.7.
The total consulting fee is RMB 33,000 (in words: RMB 33,000 only).
(3) Payment method
1. The remuneration for technical consultation shall be paid by Party A to Party B in one lump sum.
2. Specific payment time: payment will be made when the report meeting Party A's requirements is submitted.
VII. Ways to settle disputes:
Disputes arising from the performance of this contract shall be settled through negotiation and mediation. If negotiation or mediation fails, it shall be determined according to the following terms.
(a) treatment:
(a) submitted to Wuhan Arbitration Commission for arbitration;
(two) to the people's court according to law.
Eight. Other unfinished business.
This contract is made in sextuplicate, four for Party A and two for Party B..
Party A (official seal): _ _ _ _ _ _
Party B (official seal): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Engineering Technology Management Consulting Contract No.4: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Entrusting unit (Party A): _ _ _ _ _ Undertaking unit (Party B): _ _ _ _ _ _
Party A hereby entrusts Party B to handle the expenses of infrastructure projects and consulting services. After consultation, both parties agree to abide by the following terms.
I. Entrusting services, auditing and verification projects
1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _;
2. Building area: _ _ _ _ _ _ square meters;
3. Project cost (tentative estimate): _ _ _ _ _ _ yuan per square meter;
4. Project address: in Sun City Community, Wang Du, Helan County;
5. Project Commencement Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ \
Two. Service content entrusted or required by Party B (service content should be ticked before the following items):
1, preparation of project budget, final accounts and pre-tender estimate;
2, review the project budget and final accounts;
3. Bill of quantities;
4. Whole process control of project cost;
5, project completion settlement audit;
6. Others: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _;
7. Requirements: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Three. Information to be provided by Party A during the project implementation (information to be provided shall be ticked before the following items):
1, construction contract, supplementary contract or construction agreement.
2. Engineering construction drawings (complete set: civil engineering and installation).
3, the blue prints.the design information, design changes, visa.
4, construction organization design, concealed engineering records, lifting engineering records.
5. Visa information of both parties during the construction period.
6. Final accounts of the project (budget) (stamped with the official seal of the submitting and compiling unit and the special seal of the budgeter).
7. Calculation table of quantities and calculation table of main materials.
8, the actual amount of steel bar calculation schedule.
9. The policy stipulates that the price difference needs to be proved.
10, the construction unit supply schedule.
1 1, tender documents and other visa materials that affect the project cost and construction period.
12, business license, qualification certificate, fee grade certificate and budget information certificate of the construction unit.
13, cross-year project construction image schedule.
Four. Responsibilities and obligations undertaken by Party A in the entrusted project:
1, and the calculation data provided shall be true and complete.
2, construction management personnel should cooperate closely.
3. If the information provided by Party A or uncooperative personnel is untrue or incomplete, which leads to Party B drawing untrue conclusions or delaying the work progress, Party A shall bear the responsibility and compensate. (Percentage of total cost)
Verb (abbreviation of verb) Responsibilities and obligations that Party B should undertake when undertaking entrusted consulting business:
1. Prepare and review according to the requirements of relevant national laws and regulations, and issue verification reports to ensure the authenticity and legality of the verification reports.
2, according to the agreed time to complete the preparation, audit, accounting business, issued by the calculation, audit, accounting report.
The charging standard of intransitive verbs:
1, according to the settlement amount agreed by both parties.
2. Both parties shall negotiate the fees at one time.
Seven. Settlement method:
1. After both parties reach an agreement and sign a visa, Party A shall pay Party B the advance payment for the total estimated cost of the project.
2. When Party B provides Party A with a complete budget, Party A will pay 30% of the estimated total project cost when signing the budget.
3. When entering the final accounts of the project, Party A must pay all the expenses.
4. The balance shall be paid in one lump sum when the final account is signed and approved.
5. Supplementary contents: When Party A requests to report the progress payment, it shall pay all the expenses included in the monthly payment to Party B, and deduct them in advance when settling.
Eight. Remuneration:
If either party cancels or fails to perform the agreement without reason, it shall compensate the other party for economic losses (30% of the total cost of the audited project).
Nine, the law stipulates that:
This agreement is subject to the relevant provisions of the Economic Contract Law of the People's Republic of China.
X. Other matters that should be explained:
____________________________________。
XI。 Supplementary terms:
This agreement is made in duplicate, one for each party, and shall come into effect at the same time.
Entrusting unit (Party A): _ _ _ _ _ Undertaking unit (Party B): _ _ _ _ _ _
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Tel: _ _ _ _ _ _ _ _ _ _ _
Signature of representative: _ _ _ _ _ _ _
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ Tel: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signature of representative: _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Name of Entrusting Unit (Party A) of Engineering Technology Management Consulting Contract V: _ _ _ _ _ _ _ _ _
Name of consulting unit (Party B): _ _ _ _ _ _ _
Party A and Party B have reached the following agreement in accordance with the principles stipulated in the Economic Contract Law of the People's Republic of China and the Regulations on Construction Project Contracts and in combination with the actual situation of this project.
I. Project Location:
__________________。
Second, the project name:
__________________。
III. Contents of the contract:
Project cost work.
Fourth, the way of contracting:
__________________。
Verb (abbreviation for verb) Inspection completion date:
Completed on the date required by Party A. ..
VI. Contract Price:
The total price of this project.
Seven. Payment terms:
On the date of signing this contract, Party A will remit the advance payment of RMB to Party B's account. After Party B completes the project, Party A shall pay 80% of the contract price to Party B, and the remaining 20% shall be paid after the documents are submitted to relevant departments. (If Party A fails to pay on time, Party A shall be responsible for the consequences).
Eight. Party A's responsibilities:
1. Party A shall provide drawings and technical data for the project. For matters that need Party A's coordination and communication, Party A shall try its best to solve them through coordination and communication, and give a written reply to the matters submitted by Party B within the agreed time. When Party B requests a third party to provide relevant information, Party A shall be responsible for conveying and transmitting the information.
2. Party A shall pay the consulting fee on time. If Party A fails to pay the construction project cost consultation fee within the specified payment period, Party A shall compensate Party B for the interest of the fees payable from the specified payment date. The calculation method of interest is to multiply the bank demand loan on the last day of the specified payment period by the time when the remuneration is in arrears.
3. The travel expenses and accommodation expenses related to this project shall be borne by Party A..
4. If the progress is delayed or delayed beyond the agreed date due to reasons not attributable to Party B, both parties shall further agree to extend the validity of the contract accordingly.
5. If Party B's work is blocked or delayed due to Party A's reasons, thus increasing the workload or construction period, the consultant shall promptly notify Party A in writing of the situation and the possible impact, and the increased workload shall be regarded as extra service, and the time for completing the construction project cost consultation shall be correspondingly extended, and extra remuneration shall be paid.
Nine. Party B's responsibilities:
1. The project cost shall be borne by Party B, and Party B has the right to provide reasonable suggestions to Party A..
2. Party B shall complete the task with good quality and quantity according to the time required by Party A. ..
3. If the work is delayed due to Party B's reasons, Party B shall bear the corresponding responsibilities.
X. Supplementary provisions:
This agreement is made in duplicate, each party holds one copy, which has the same legal effect. This contract shall come into effect as of the date of signing, and shall automatically become invalid after the payment of the contract money.
XI。 Others:
Matters not covered in this contract shall be settled by both parties through consultation.
Party A (seal): _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative (signature): _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ ID number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Employer of Engineering Technology Management Consulting Contract 6: _ _ _ _ _ _ _ _ _ _, hereinafter referred to as Party A;
Consultant: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, hereinafter referred to as Party B.
In order to make the concept of _ _ _ _ _ _ _ _ _ _ _ _
1. Party A shall, before _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. Party B shall, according to the requirements of Party A, conduct a feasibility study on the topography, geological conditions and construction and installation ideas of _ _ _ _ _ _ _ _ _ _.
3. Party A shall pay the consulting fee to Party B according to the trial charging standard for engineering design promulgated by the State Planning Commission. Party A shall pay Party B $ _ _ _ _ _ _ _ _ _.
Fourth, the travel expenses of personnel who need to go to other places for investigation and data collection due to this consulting project shall be borne by Party A. 。
5. If Party A fails to deliver the relevant documents, drawings and materials to Party B within the time stipulated in this contract, Party B may postpone the delivery of the design task book and framework calculation table according to the delayed time; If Party A fails to pay the consulting fee to Party B within the time stipulated in this contract, a fine of _ _ _ _ _ will be imposed according to the delayed delivery amount for each day of delay. If Party A interrupts the consultation request halfway and Party B has completed more than half of the consultation work, it shall pay all the consultation fees to Party B; If the consulting work is not over half, it will be charged at 50% of the total consulting fee.
If Party B fails to deliver the design task book and framework calculation table within the time stipulated in this contract, it will be fined at _ _ _ _ of the total consulting fee for each day overdue. If Party B interrupts the consultation midway, it shall pay a fine to Party B according to the total consultation fee.
Other intransitive verbs: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
The original contract is in duplicate, one for each party. The copy of this contract is dated _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Employer (Party A): _ _ _ _ _ Consultant (Party B): _ _ _ _ _ _ _ _ _ _
Address: _ _ _ _ _ _ _ Address: _ _ _ _ _ _ _ _
Person in charge: _ _ _ _ _ _ Person in charge: _ _ _ _ _ _ _ _ _ _ _
Phone number: _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _
Contact: _ _ _ _ _ _ Contact: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Bank account: _ _ _ _ _ _ Bank account: _ _ _ _ _ _ _ _ _ _
Completed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.