Where can I check the budget certificate?

Generally, the local cost information is queried online.

Budget personnel should be trained and evaluated. After passing the examination results, a post certificate will be issued. The certificate has a serial number source and a steel seal. And it has its own chapter, the content of which is the name and certificate number. The budget officer can check the qualification and certificate number through the network. The budget officer certificate, also known as the cost officer certificate, is implemented with the national qualification examination system for construction project cost personnel in China.

Registered cost engineers are national in nature and have exams every year. The application conditions are above, but the annual pass rate is very low, not according to the score, but according to the overall level of all examiners in that year.

Extended data:

Job responsibilities of budget officer

1, be familiar with national laws, regulations and management regulations on project cost, master professional theoretical knowledge, be familiar with engineering drawings, master project budget quota and relevant policies and regulations, and lay a foundation for correctly compiling and auditing budgets.

2, responsible for the audit of construction drawings, to participate in the blue prints.the design and technical disclosure, according to its records for budget adjustment.

3. Assist leaders in project declaration, organize bidding, examination and approval before commencement and acceptance after completion.

4. After the project is completed and accepted, the final accounts shall be made in time and reported to the factory director for signature.

5. Participate in the procurement of engineering materials and equipment, be responsible for the analysis of engineering materials, check the price difference of materials, collect and master the records of technical changes and material substitution, conduct cost accounting at any time, and provide scientific basis for leadership decision-making.

6, a comprehensive grasp of the terms of the construction contract, in-depth understanding of the construction situation, to lay a good foundation for the final accounts review.

7. After the project is completed, it should be sent to the audit department for audit.

8. Complete the economic analysis of the project cost, and timely file the final accounts of the project.

9, assist in the preparation of infrastructure plans and adjustment plans, understand the implementation of infrastructure plans.