First of all, be familiar with the drawings, design change documents and relevant construction specifications, and carefully grasp and implement the technical requirements in the construction organization design, special construction plans of various disciplines and technical disclosure.
Second, each team in the division, subdivisional work, team first self-inspection, self-inspection by the project department after passing, before the construction of next working procedure, and the division, subdivisional work within the warranty period stipulated in the contract.
Three. In case of similar quality problems in the construction process, the project department has the right to order the subcontracting team to leave the site for the first time through education and rectification, the second time with a fine (500-2,000 yuan) and rectification within a time limit.
Four, all kinds of materials needed in the construction (construction contract documents stipulated by the project department procurement), two or three days in advance in written form submitted to the project department for review (and indicate the quantity, specification, model), so that the project department organization procurement. (Steel shall be reported 7 days in advance)
Five, control the construction schedule, weekly schedule, monthly schedule, reasonable and orderly arrangement organization construction, construction, such as due to the lack of technical force or personnel, machinery, can't guarantee the time limit for a project requirements, organize in place within a time limit, if can't guarantee the schedule requirements, the project department ordered the team to leave.
Six, carefully arrange all kinds of materials and safety protection articles specified in the construction contract documents, and use them only after being confirmed by the project department, and put an end to all inferior materials.
Seven, the site safety and civilized production, all kinds of materials piled up neatly and orderly, it is forbidden to throw the place on the construction site. All kinds of semi-finished materials should be collected, sorted and stacked at the designated location after each working procedure is completed, so as to be cleaned after work.
Eight, regular and irregular safety education and training for workers, whether strictly implemented in the construction? Regulations on Safety and Civilization Management? . Special operations personnel must hold relevant certificates.
Nine, labor shift workers' wages and all kinds of machinery rental fees should be paid under the supervision of the project department, and submit an original to the project department for future reference and filing.
Ten, all kinds of subcontract subdivisional work outside the construction contract (such as water and electricity, aluminum alloy, waterproof, etc.). ) actively cooperate and do a good job in related coordination.