Paibian construction contract

Plaque construction contract template

Article 1: Signboard Construction Contract

Party A: * * Co., Ltd.

Party B: * * Advertising Business Department

In order to clarify their respective rights and obligations, Party A and Party B have reached the following agreement on the production and installation of billboard characters in * * * * marketing center through friendly negotiation.

Article 1: billboard text production

1, text material: precision stainless steel and titanium wire drawing, with yellow lights on the outside and back.

Article 2: Project Cost and Payment Method

1

2. Payment method: the entertainment items of the project shall be checked and accepted by all relevant departments, and paid in one lump sum within one week after receiving the valid invoice from Party B. ..

Article 3: Construction Period

After the contract is signed, Party B shall complete the production within 9 days after Party A notifies Party B to start work. In case of force majeure factors (such as rain, snow, gale above level 4), the construction period will be postponed.

Article 4: Rights and obligations of both parties

Party A:

1. Provide Party B with the billboard location and ensure that the location can be built.

2. Pay the billboard fee according to Article 2 of this contract.

Party B:

1. manufacture, construct and install according to the installation location provided by party a within 9 days after party a notifies that the site construction can be carried out. ..

2, in strict accordance with the construction plan drawings confirmed by Party A for production and installation. If the site conditions are inconsistent with the construction drawing scheme, it shall be reported to Party A in time for negotiation, modification and confirmation.

Article 5: Liability for breach of contract

1. If Party A fails to make payment according to the time stipulated in Article 2 of this contract, Party A shall pay 0.5% of the total contract amount as liquidated damages to Party B for each day overdue, and extend the contract period.

2. If Party B fails to complete the production and installation of outdoor billboards on time according to Article 4 of this contract without justifiable reasons, Party B shall pay 0.5% of the total contract price to Party A as liquidated damages for each day overdue.

3. In case of shutdown, shutdown or demolition due to Party A's reasons, Party A shall be responsible and the construction period shall be postponed. Party B has the right to request Party A to continue to pay the completed part according to the actual construction situation.

This contract is made in duplicate, with Party A and Party B holding one copy respectively. ..

Signature (seal) of Party A? Signature (Seal) of Party B

Year? Month? Day? Year? Month? sun

Chapter II: Construction Contract of Light Box Plaque

Party A: Heilongjiang

Party B:

The renovation project of Party A in () shall be undertaken by Party B, and the following opinions are reached through consultation between both parties:

1. Nature of the project: Party B contracts the project and materials (double contracting).

Second, the construction technology: scrape the white cement twice, sand it once, and paint the exterior wall twice (white).

Three, quality requirements: no peeling, no shedding, bright, mid-range exterior paint or above. The warranty period is three years (warranty period).

4. Project cost: RMB 9.90 per square meter (? Yuan /m2), according to the actual

Payment of project funds for area calculation.

Verb (abbreviation of verb) payment method: if the project is paid in full after acceptance, the balance will be paid in advance as quality guarantee.

Safety of intransitive verbs: operate according to the construction specifications, and Party B shall bear all safety responsibilities.

Seven, Party A's existing scaffolding, Party B can borrow the construction, and Party B is responsible for checking and strengthening the safety.

8. Time limit: the project task shall be completed within days from the date of commencement.

Nine. This agreement is made in duplicate, one for each party, and shall come into force after being signed. Party A: Party B:

Date, year and month

Article 3: plaque contract

Employer (Party A): Korean charcoal barbecue.

Contractor (Party B):

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the characteristics of decoration in this city, on the basis of equality, voluntariness and consensus, Party A and Party B have reached the following agreement on matters related to this decoration project (hereinafter referred to as the project):

I. Overview of the Project

1. Project address: Korean charcoal barbecue.

2. Project Overview: Labor cost of external plaque

Second, the project date

Commencement date: 20 1__ _ _ _ _ _ _ _ _ _ _ _

Third, the project cost and settlement method:

1. The total project cost is _ _ _ _ _ _ _ _ _ _ _ _ yuan only, excluding tax.

2. After signing this contract, Party A shall pay all expenses to Party B? % RMB _ _ _ _ _ _ Yuan only.

3. Did Party A pay all the expenses to Party B before installing the plastic characters? %____________

Fourth, engineering changes.

During the construction period, the project scale, construction method and project investment have changed, and adjustments have been made due to technical changes.

When the whole project cost increases or decreases, Party A and Party B reach an agreement through consultation, and the construction period will be postponed.

Verb (abbreviation of verb) liability for breach of contract

1. In case of shutdown due to Party A's reasons, or the construction scheme changes, Party A shall compensate Party B for shutdown.

Labor, deceleration and material loss.

2. Party B shall be responsible for the overdue delivery caused by Party B..

3. Party A shall be responsible for the shutdown and slowdown caused by Party A's failure to handle relevant formalities.

Intransitive verb others

This contract is made in duplicate, one for each party, with the same legal effect. The annex to the contract is an integral part of this contract.

After this contract is confirmed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall re-evaluate the supplementary agreement after consultation.

Validity of the contract: The contract shall be valid after sale after the final payment is paid and the after-sale warranty agreement is signed. Before paying the final payment, all the construction projects of Party B shall be owned by Party B, and the final payment shall be handed over to Party A for use.

Signature of Party A:? Signature of Party B:

Date of contract signing: 201_ _ _ _ _

;