1. Technical preparation
(1) According to ISO900 1 standard and the requirements of our company's program documents, organize self-examination and joint examination of drawings, prepare work instructions for key working procedures and special working procedures, and evaluate the process capability of special working procedures.
(2) The chief engineer and technicians of the project shall, on the basis of careful study of the design documents, prepare various construction and acceptance specifications, procedures, quality evaluation standards, standard atlas and various record forms.
(3) Conduct technical disclosure, and the procedure is: Chief Engineer → Technician → Team Leader.
2. Material preparation
(1) According to the building materials and engineering materials provided by the planning department, submit them to the company for examination and approval, and organize the materials to enter the site in a centralized way.
(2) For the processing and purchasing of finished products and semi-finished products, according to the requirements of the construction schedule, the processing plan shall be issued in advance, and the drawings of processed parts shall be drawn for processing in advance.
(3) Equipment operators shall organize all kinds of construction machines and tools to enter the site according to the schedule of construction machines and tools. Carry out maintenance in advance to ensure the intact rate, so as to ensure that it can be put into use on time. Measuring instruments and measuring instruments should be prepared according to the construction organization design, whether they have been metrological verified, and verified and used within the validity period of the certificate.
3. Construction personnel preparation
According to the construction organization design and deployment of construction personnel, ensure the quality and quantity of personnel to meet the needs of this project. Adhere to the principle of "training first, then taking up posts" and the system of workers holding certificates. Equipped with skilled workers all hold professional qualification certificates issued by the state, of which more than 80% are middle and senior workers; Equipped with electricians, welders, scaffolders, riggers and drivers and other special types of work all hold relevant operation certificates and hold relevant certificates.
4. Construction site preparation
Carry out detailed surveying and mapping on the construction site, plan and design the temporary facilities for production and living, draw the general construction plan of the factory, and submit it to Party A for approval before construction, so as to improve the temporary facilities for production and living as soon as possible.