Is Chongqing Taiding Century Group legal?

Legal. Yuneng Tai Ding Energy (Group) Company is a secondary subsidiary of Yuneng (Group) Company engaged in hydropower development.

1. The company was established in March 1999, and was transformed from a joint-stock cooperative enterprise into a limited liability company in October/2000. It is officially registered as Chongqing Tai Ding Energy (Group) Co., Ltd. with a registered capital of 30 million yuan. Since its establishment, the company has developed rapidly and its business scale has been expanding. By the end of 2005, the registered capital of the company reached 654.38+0.3858 billion yuan, and the asset scale reached 596.5438+0.999 billion yuan. The company has 8 registered employees1person, 75 external employees and 57 with bachelor degree or above, with an average age of 37. 2 years old. The organizational structure includes General Manager's Work Department, Planning and Development Department, Finance and Assets Department, Operation Management Department, Development and Construction Management Department and Safety Supervision and Security Department. It has 8 absolute holding subsidiaries, 4 relative holding subsidiaries and 4 shareholding companies, and has jurisdiction over 6 holding and operating power stations, 20 small hydropower stations and 5 project headquarters under construction.

2. As a specialized company in electric power development, construction and operation, the company invested in Jiangkou Hydropower Station (3×65438+ 10,000 kilowatts) in 1999, and it was completed and put into operation in June 2003. At the same time, the Daxihe Three-stage Hydropower Station (2× 1 10,000 kW) and the Longhe Three-stage Hydropower Station (2×3) were started one after another. 50,000 kilowatts 2× 1 10,000 kilowatts 3× 20,000 kilowatts), and participated in the construction of Peng Hydropower Station (5× 350,000 kilowatts) and Wujiang Yinpan Hydropower Station (500,000 kilowatts).

3. By the end of 2005, six power stations have been put into operation, with a total installed capacity of 6 1.7 kW, an equity installed capacity of 380,000 kW and an annual power generation of 1.7. 8.6 billion kwh. At present, the total installed capacity of power stations under construction and carrying out preliminary work is 5 14. 370,000 kilowatts, installed capacity 13 1. 780,000 kilowatts. This company is legal and officially filed, and has great influence in Guangzhou and Foshan. Engaged in enterprise training, consulting, investment and other sectors, large-scale, has served more than 20 thousand enterprises.