This paper will take an industrial park as an example to introduce its new face design scheme under the modern planning.
First, the factory entrance renderings
The following is the renderings of the factory entrance:
(picture)
As can be seen from the renderings, the design of the factory entrance is very simple and atmospheric, adopting modern architectural style, giving people a sense of exquisite and high-end. The landmark building at the entrance adopts a glass curtain wall, which makes the whole entrance look very beautiful, and at the same time increases the visibility and facilitates the identification of passing vehicles and pedestrians.
Second, the design scheme
1. The landmark building at the entrance
The landmark building at the entrance adopts glass curtain wall, and the wall adopts a large area of glass, which makes the whole entrance look very beautiful, at the same time, it increases the visibility and facilitates the identification of passing vehicles and pedestrians. The landmark building at the entrance also adopts LED lighting design, which has excellent lighting effect at night, making the whole entrance more beautiful.
2. Greening at the door
The greening design at the entrance is very important, which can not only beautify the environment, but also purify the air and improve the environmental quality of the whole industrial park. The greening design of the doorway adopts various plants, such as flowers, shrubs and small trees, which makes the doorway look more vibrant.
3. access
The design of the road at the entrance is very important, considering not only the traffic of vehicles, but also the safety of pedestrians. The road at the entrance adopts the design of separating people and vehicles, which separates the sidewalk from the roadway, making the passage of pedestrians and vehicles safer and smoother. At the same time, the road at the entrance also uses asphalt pavement to make the whole road look cleaner.
Third, the operation steps
1. Determine the design scheme
First of all, we must determine the design scheme of the entrance, including the landmark buildings, greening and roads at the entrance. The design scheme should not only consider the environment and atmosphere of the whole industrial park, but also consider the economic cost and practical feasibility.
2. Construction preparation
After the design scheme is determined, construction preparations should be made, including the procurement of construction materials, recruitment and training of construction personnel, etc. At the same time, site survey and measurement are needed to determine the specific location and construction scope.
3. Construction process
Pay attention to safety and quality during construction to ensure the smooth progress of construction. Pay attention to the coordination with the surrounding environment in the construction process to avoid affecting the surrounding environment. At the same time, we should also pay attention to communication and coordination with the local government and relevant departments to ensure the legality and standardization of construction.