Responsibility is the guarantee of quality, and quality is the foundation of brand.
From the design, technology, materials, service quality to meet customers' home.
Space consumption demand, strive for perfection and create humanized living space.
Take "Cantonese Seiko" as the guiding standard, and take the lead in promoting seven types of work in the industry.
According to the 365 construction procedure, the construction audit system is higher than the industry standard.
Seven Technological Processes-"Construction Protection"
Elevator entrance and exit protection
Access door protection
Balcony protection
Window protection
Sliding door slideway protection
Protection of sanitary ware
Protection of temporary guardrail
Bare wire protection
Strong and weak current box protection
Protection of floor tiles and wooden floors
Product door protection
Seven Technological Processes-"Electrical Engineering"
According to the determined position, determine the direction of the elastic line of the whole set of indoor lines.
The circuit layout is horizontal and vertical, neat and beautiful.
Circuit laying
Test the circuit structure according to the specification.
Install the junction box and protect it
Lamp wire outlet hose protection
Seven technological processes-"water conservancy project"
Water pipe layout, try to avoid gas pipes, heating pipes and ventilation pipes, and keep them.
Be separated by a certain distance
Catheter slotted, avoid slotted catheter from bedroom and study.
Waterway construction, hot melt connection
Drainage and sewage treatment construction, drainage pipeline installation
Seven Technological Processes-"Masonry Engineering"
Build a wall, hang a net, and then swing
Wall and ground leveling
waterproof treatment
Caisson treatment
Ground paving project
Seven Technological Processes-"Woodworking Engineering"
Door cover manufacturing
Manufacture and installation of sliding door
Manufacture and installation of cabinets
Manufacture and installation of ceiling and suspended ceiling
Modeling walls and porches
Seven technological processes-"painting project"
Brush protective paint
eyeshade
Polishing and cleaning the bottom
Spray primer three times.
Dry grinding and water grinding
Spray the top coat three times.
After acceptance, it shall be protected with special protective film.
Seven technological processes-"ash removal project"
Interior wall fan ash
The ceiling is covered with dust.
Wall hanging net, fan dust
Manual and mechanical grinding
Hand painting, roller coating and mechanical spraying.
The trust of millions of families
Ingenuity craft conscience casting
From materials, construction protection, grass-roots, concealment, surface and overall decoration.
The presentation of the effect is controlled by the total quality of the input, and every link is pre-controlled.
Acceptance and formal acceptance, to ensure that all details within the scope of acceptance meet or even
Higher than industry standards
Eight-fold quality inspection system
Worker self-inspection
Preliminary inspection of foreman
Re-inspection of engineering housekeeper
Quality inspection of engineering department
Sampling inspection by general manager of branch company
Regional quality inspection and inspection
Group quality control sampling inspection
Presidential inspection
Monographs on quality management
Carefree Project Construction Specification Guide Manual and Carefree Project Image Manual
Worry-free engineering materials manual and worry-free engineering construction standard video
Quality Briefing and Engineering Post Work Execution Manual.
Implementation manual of quality and process standards
Engineering research and development
Process research and development: invest a lot of manpower and material resources in seven categories of decoration.
Carry out technical improvement and research and development
Tool research and development: continuously research and develop or introduce advanced high-tech testing equipment, such as
Infrared projector, standard rangefinder, humidity measuring instrument, weak current circuit.
Signal attenuation detector, etc.
Process patents: applied for municipal patents 10.
Warranty and follow-up services are provided 24 hours a day, with regular return visits twice a year.
Make an appointment to visit the site hotline: 400-040-2005
Eight times the mass