What are the requirements for the establishment of standard curing rooms?

Regulations on the Management of Standard Curing Rooms on Construction Sites According to the Regulations of Shanghai Municipality on the Management of Standard Curing Rooms on Construction Sites, combined with the actual work, the setting and management of standard curing rooms on construction sites must meet the following requirements: the setting of standard curing rooms must be completed before the concrete pouring project, and all kinds of equipment required by these regulations shall not be added synchronously or lagging behind. The standard curing room must be clean and tidy, the test blocks should be placed in order, managed by special personnel, and the door should be locked. Irrelevant personnel are not allowed to enter without authorization. The house needs insulation. According to the scale of the project, determine the area of standard curing room, the minimum is not less than 5 square meters. Equipped with constant temperature devices such as heating and cooling air conditioning electric heating rods to control the indoor temperature within 20 2℃. For the maintenance of masonry ponds in small and medium-sized projects, the immobile Ca(OH)2 saturated solution with the temperature of 20 2℃ is adopted, and another pre-cultivation pond (or bucket) with similar volume is set as replacement water. In order to save area, the pre-culture pool can be set above the curing pool, and the water temperature must be the same as the room temperature.