According to the "Administrative Measures for the Construction of Jiangmen Engineering Technology Research Center", the supporting unit applying to establish an engineering center should meet the following conditions:
(1) Basic conditions:
p>
1. Science and technology enterprises, scientific research institutes and universities with independent legal person status registered in Jiangmen City.
2. The organizational structure is relatively complete and the management and operation mechanism is reasonable.
3. The engineering center applying for establishment must determine the project leader, who will be responsible for the construction of the engineering center.
4. The engineering center applied for establishment should be equipped with management leaders and technical leaders, including no less than 15 full-time R&D personnel, and no less than 20% of personnel have a master's degree or intermediate professional titles.
5. Pay attention to the cultivation, introduction and use of scientific and technological personnel and highly skilled talents. Those with a foundation for industry-university-research cooperation will be given priority.
6. The goal of establishing an engineering center is clear, the research and development tasks are specific, the plan is feasible, and the measures are effective.
7. Have engineering and technical test conditions and infrastructure, necessary inspection, analysis, testing means and process equipment (excluding production equipment), and the original value of the equipment should not be less than 1 million yuan.
(2) Classification conditions:
Enterprise category:
1. The enterprise has good management and operating conditions, strong profitability and high management In principle, the sales volume in the previous year should not be less than 25 million yuan, which can provide the main funds needed to establish an engineering center. Software, creative design and R&D service enterprises can be appropriately lowered.
2. In principle, enterprises have established specialized R&D institutions and have continuous investment in R&D. The proportion of R&D expenditures in the previous year to annual sales revenue is not less than 3%, or not less than 1.5 million yuan. After establishment, the proportion of annual research and development funds in sales revenue shall be no less than 4%, or no less than 2.5 million yuan.
3. The company has independent intellectual property rights such as patents, software copyrights, exclusive rights to integrated circuit layout designs, and new plant varieties.
4. Give priority to supporting large and medium-sized enterprises that are among the best in the industry in terms of products, technical level and comprehensive strength to establish provincial engineering centers.
Public welfare category:
1. Must be able to ensure the implementation of construction funds and daily research and development funds for the engineering center. Undertake no less than 3 scientific research projects in the declared industry (field) every year and the total funding for such projects shall not be less than 1.5 million yuan. At least 1 major technological achievement in the same technical field has been promoted and transformed. Those established based on universities and scientific research institutions should have independent intellectual property rights such as more than 3 patents, software copyrights, exclusive rights to integrated circuit layout designs, and new plant varieties.
2. Have experience in serving enterprises in the same industry (field), have good performance in serving enterprises or industries, and have a number of transformable scientific and technological achievements. Have the ability of self-development in a virtuous cycle.