After the project was put into production, the local authorities attached great importance to it and invested a lot of capital cost. The site selection in the early stage and the whole construction process in the later stage took great efforts, and finally a storage power station was built in Wuyue Reservoir. This power storage station is indirectly powered. When the power supply is not tight, the power station can pump water by generating electricity and store water potential energy. When the power consumption peak comes, in order to alleviate the power shortage, the storage power station can supply power through hydropower generation.
From the working principle, it looks like a battery or a charging treasure. This is because the power station has brought new vitality to local development and can make good use of Xinyang's water resources. Henan is not a province rich in water resources, because most areas are plains. Xinyang is a mountainous and watery place, which is obviously different from other places in Henan. Therefore, we attach great importance to the belief of using water resources, and using hydropower will play a real role in water resources. The official operation of the project can promote the development of local hydropower and expand the scale of new energy in China.
If this hydropower station can achieve the expected effect, then other reservoirs in Xinyang can follow suit, so Xinyang can use the rich local water resources to build various hydropower stations, large and small. This measure can promote the local economic development, and also alleviate the supply shortage of China power grid, especially now the global climate is getting higher and higher, and the electricity consumption is increasing.