Awards awarded by Hewu Railway Passenger Dedicated Line

★2011.02|The 10th China Civil Engineering Zhan Tianyou Award|New Shanghai-Hancheng Channel Hefei to Wuhan Railway|National Level

★2011.02|2010~2011 China Construction Project Luban Award (National Quality Project) | Dabie Mountain Tunnel Project | National level. Up to now, the Dabie Mountain Tunnel Project is the only passenger dedicated line railway tunnel that has won the Luban Award (National Quality Project) since the opening and construction of my country's first batch of passenger dedicated lines in 2005. The project represents the highest level of construction quality of my country's railway passenger dedicated line tunnel projects.

★In 2011, the Hewu Railway’s introduction of the Wuhan Hub Riverside Bridge won the 2010-2011 National Quality Project Silver Award.

★2008|2007-2008 National Construction Method|JQ900A Bridge Erecting Machine Small Disintegration Crossing Tunnel Construction Method (GJEJGF165-2008)|National

★2009|2009 National Level construction method | Upward moving formwork over-the-air span prestressed concrete continuous beam construction method (GJEJGF194-2008) | National level

★2011.02|First Prize of 2010 Railway Quality Project (Survey and Design)| Hefei to Wuhan Railway Overall Design | Provincial and Ministerial Level

★2011.02|First Prize of 2010 Railway Quality Project (Survey and Design)|Hefei-Wuhan Railway River Bank Extra Large Bridge|Provincial and Ministerial Level

★2011.02|First Prize of 2010 Railway Quality Project (Survey and Design)|Hewu Railway Yanjiahe Super Bridge|Provincial and Ministerial Level

★2011.02|First Prize of 2010 Railway Quality Project (Survey and Design)|He Dabie Mountain Tunnel of Wuhan Railway | Provincial and Ministerial Level

★2005.01|Third Prize for Excellent Engineering Consulting Achievements | Feasibility Study Report on the New Railway Hu-Hanrong Passage Hefei to Wuhan Section | Provincial and Ministerial Level

★2009|Won the Chongqing "Bayu Cup" Quality Engineering Award in 2009|Dabie Mountain Tunnel Project|Provincial and Ministerial Level

★2009|Won the Ministerial Level Construction Method for Railway Construction Project in 2009|Railway Passenger Dedicated Line 32m Brief Installation method of downward moving formwork for support box girder (TJBJGF-07.08-040) | Provincial and ministerial level

★2009|Ministerial construction method of railway construction project in 2009 | Construction method of large-number turnouts for railway business lines (TJBJGF-07.08-085)|Provincial and ministerial level

★2009|Ministerial construction method for railway construction projects in 2009|Double-block ballastless track rail construction method for railway passenger dedicated lines|Provincial and ministerial level★JQ900A type Large frame structure of bridge erecting machine|Utility model patent|China|

★Utility model patented device for assembling the piggyback frame of JQ900A bridge erecting machine|Utility model patent|China|

★JQ900A type bridge erecting machine utility model piggyback structure|Utility model patent|China|

★A cable laying operation vehicle|Utility model patent|China|

Standard and general Figures

Specifications and general drawings compiled based on the project

★Railway Tunnel Drilling and Blasting Construction Procedures and Operation Guide|Standards|China|TZ231-2007

★ Technical Guidelines for Railway Tunnel Engineering Construction | Standards | China | TZ204-2008

★ Interim Provisions on Risk Assessment and Management of Railway Tunnels | Standards | China | Railway Construction [2007] No. 200

★ Railway Tunnel Structural Waterproofing and Drainage Construction Operation Guide|Standard|China|Jianjianji [2006] No. 21

★Ballasted Track Railway Ballasted Whole Track Construction Operation Guide|Standard|China|Railway Construction [2009] 141 No.

★High-speed Railway Design Code (Trial)|Standard|China|TB10621-2009

★250 km/h Passenger Dedicated Line Railway Double-track Tunnel Beveled Opening Door|Standard|China | Tunnel (2009) 0221

★Passenger and freight *** line double-track open tunnel with speed of 200 kilometers per hour (double-layer container transportation) | Standard | China | Tunnel (2010) 1254

★Interim Technical Conditions for Double-block Ballastless Track Double-block Concrete Sleepers for Passenger Dedicated Railways | Standards | China | Science and Technology Base [2008] No. 74