What is an accessory project? Does the unit project need bidding?

What is an accessory project? Does the unit project need bidding? Refers to the auxiliary facilities that serve the main project outside the main building. Generally refers to the outdoor works of buildings such as roads, outdoor pipe networks and fences.

What is a civil engineering subsidiary project is not easy to answer, and the question is not specific.

Can the ancillary works of the construction factory be tendered separately? Yes, and according to the bidding regulations, no matter what type of project, the financial capital investment cost is more than 500 thousand yuan, it must be invited to bid.

Accessory works Urban municipal works include urban roads, bridges, drainage, sewage treatment, urban flood control, gardens, greening, street lamps, environmental sanitation and other urban public facilities. 1, road traffic engineering. Such as roads, interchanges, squares, transportation facilities, railways, subways, etc. 2. River and lake water system engineering. Such as rivers, bridges, diversion (drainage) canals, irrigation and drainage pumping station, sluice bridges and other hydraulic structures. 3. Underground pipeline engineering. General water supply, drainage (including rainwater and sewage), power supply, communication, gas supply, heating, special underground pipelines, civil air defense passages, etc. 4. Overhead pole line project. Power supply poles, communication poles, trackless poles and overhead pipelines with different voltage levels. 5. Street greening project. Street trees, shrubs, lawns, green sketches (such as rockeries, verandahs, easels, pools, fountains, etc.). ), buildings and structures are the main components of municipal professional engineering fields (factories), stations and points. Municipal ancillary structures include inspection well construction, rainwater outlet construction, valve well construction and valve installation.

Can outdoor ancillary works be packaged for bidding? How to bid in sections? You can see how many teams you want to do this. Several teams will be divided into several blocks when they do it. They will bid, they can't win both. Everyone does a section.

Does the supervision unit of100000 project need to bid for Article 3 in 2008?

The following construction projects in People's Republic of China (PRC), including engineering survey, design, construction, supervision and procurement of important equipment and materials related to engineering construction, must be subject to tender:

(a) large-scale infrastructure, public utilities and other projects related to social interests and public safety;

(2) Projects that are wholly or partially invested with state-owned funds or financed by the state;

(3) Projects using loans or aid funds from international organizations or foreign countries.

Those who meet the requirements must be invited publicly.

Non-conformity means private bidding, that is, negotiation and the like.

What is a unit project? Unit project is a project with independent design documents, independent construction conditions and independent use functions, but it can not independently exert its production capacity or engineering benefits after completion, and it is an integral part of a single project.

The division of unit projects shall be determined according to the following principles:

A building or structure with independent construction conditions and independent use function is a unit project.

A large-scale unit project can be divided into several sub-unit projects that can form independent use functions.

In highway engineering, a complete highway project is usually a facility with independent functions (or benefits), which is called a single project.

In architectural engineering, a factory construction project and a complete office building are also facilities that independently exert their benefits (or functions), also known as single projects.

If the highway engineering is divided into blocks, the subgrade engineering and pavement engineering of each block are unit projects. A single office building project in construction engineering, including civil engineering, heating engineering, ventilation engineering, lighting engineering, thermal equipment and installation engineering, electrical equipment and installation engineering, can be called unit engineering.

Different from a single project, a unit project cannot exert its production capacity or value independently after completion.

What is the affiliated project of expressway mainly refers to toll station, service area, parking area, maintenance work area, management center, monitoring center and overload control station.

Which units are involved in the project that needs bidding from the beginning to the end of the project? What kind of process is it? Thank you. It's complicated. Look at the provisions of the bidding law.

Does the municipal engineering material supply unit also need bidding? This is the rule. But in practice, there are two situations.

1, the tenderee must select the materials provided by Party A before the commencement of construction, so it may or may not adopt the tender if the quantity is large, and directly find several well-known enterprises to make an inquiry and make a choice.

2. It is almost impossible for the construction unit to choose its own material suppliers after the start of construction. One is that time is not allowed, and the other is that bidding will inevitably increase the bidding cost, which is not cost-effective. Basically, the choice is made through market inquiry.