Standardization, metrology, quality engineering majors
Requirements for application and review of engineer title
3. Professional and technical work experience (ability) conditions After obtaining the title of assistant engineer, you must have The following conditions:?
(1) Engineering and technical personnel engaged in standardization work must meet one of the following conditions: 1. Participate in science and technology planning projects, engineering projects, and technological transformation projects at or above the provincial (ministerial) level, or science and technology planning projects, engineering projects, and technological transformation projects at the municipal (department) level (top five), and prepare corresponding technical reports; 2. Participate in the formulation and revision of national standards or the formulation and revision of industry, local, and group standards (top five); 3. Meet two of the following conditions: (1) Participate in standardization work in new technology introduction and new product development projects of units (departments), or participate in standardization technical consultation and standardization technology promotion work, and prepare corresponding technical reports; (2) Participate in Participate in the implementation of standardized technical specifications and standards, or participate in the analysis and evaluation of standardization information, and prepare corresponding technical reports, or mainly participate in the preparation of normative documents on the subject of standardization management at or above the county (municipal bureau) level, and publish and implement them , or those who mainly participated in the preparation of standardized research reports that were adopted by governments, departments and units at or above the county or city bureau level; (3) Participated in the formulation of enterprise standards (top three), or participated in standardized technical specifications (top three) Writing work; (4) Participate in the establishment of the unit (department) standard system and prepare corresponding technical reports; (5) Participate in the establishment of the unit’s quality system, participate in the preparation of the professional quality system documents and put them into practice, or participate in the unit’s scientific research Research work on projects (top three) and prepare corresponding technical reports.
?
(2) Engineering and technical personnel engaged in measurement work must meet one of the following conditions: 1. Participate in science and technology planning projects, engineering projects, and technological transformation projects at or above the provincial (ministerial) level, or science and technology planning projects, engineering projects, and technological transformation projects at the municipal (department) level (top five), and prepare corresponding technical reports; 2. Participate in the formulation and revision of national metrology verification regulations, specifications, and standards or participate in the formulation and revision of departmental (local) metrology verification regulations, specifications, and standards (top five); 3. Meet two of the following conditions: (1) Participate in the introduction, development, trial production, and promotion of new technologies and products of the unit (department), and prepare corresponding technical reports; (2) Participate in the preparation of new metrological testing projects, and prepare corresponding reports Technical reports, or participate in the establishment of public measurement standards and the highest measurement standards for enterprises and institutions, and prepare corresponding technical reports, or mainly participate in the preparation of normative documents on the topic of measurement management at or above the county (municipal bureau) level, And publish and implement, or mainly participate in the preparation of professional metrology research reports that are adopted by governments, departments and units at or above the county or city bureau level; (3) Participate in the formulation of enterprise standards (top three), or participate in metrology regulations and technical specifications Organize and implement work, or participate in the research on testing methods of the unit, and write corresponding technical specifications, or be able to solve unconventional testing problems in enterprises, institutions, and production; (4) Participate in proficiency testing and laboratory comparisons, and obtain Satisfied with the results, or participate in arbitration testing, measurement product type evaluation, energy measurement technology review work, and write technical reports, or participate in the planning, implementation and supervision of technical reviews, and write corresponding technical reports; (5) Participate in the establishment of the quality system of the unit , participate in the preparation of the quality system documents of this major and put them into practice, or participate in the research work of the unit's scientific research projects (top three) and prepare corresponding technical reports, or obtain the national registered second-level metrologist qualification, or participate in the municipal bureau-level The top three in the technical competition organized by the above organizations;?
(3) Engineering and technical personnel engaged in quality work must meet one of the following conditions: 1. Participate in science and technology planning projects, engineering projects, and technological transformation projects at or above the provincial (ministerial) level, or science and technology planning projects, engineering projects, and technological transformation projects at the municipal (department) level (top five), and prepare corresponding technical reports; 2. Participate in the formulation and revision of national standards (procedures, specifications) or participate in the formulation and revision of industry (local, group) standards (procedures, specifications) (top five); 3. Meet two of the following conditions: (1) Participate in the introduction, development, trial production, and promotion of new technologies and products by units (departments), and prepare corresponding technical reports; (2) Participate in the preparation of new inspection projects, or participate in county Accident investigation work organized by departments at or above the county level, and preparation of technical reports, or mainly participating in the preparation of normative documents on quality management at or above the county level, and their release and implementation, or preparation of professional quality research reports, which have been approved by the county or city bureau level or above Adopted by governments, departments, and units; (3) Participated in the formulation of enterprise standards (top three), or participated in the implementation of quality regulations and technical specifications, or participated in the development of new inspection methods and the research of new inspection equipment; ( 4) Participate in proficiency testing and laboratory comparisons and obtain satisfactory results, or participate in quality arbitration inspection, product quality risk monitoring (assessment), product quality appraisal, accident technical appraisal, safety evaluation work, or participate in the planning and implementation of technical review and supervision, and prepare corresponding technical reports; (5) Participate in the unit’s quality system certification, participate in the preparation of the professional quality system documents and implement them, or participate in the research work of the unit’s scientific research projects (top three), and prepare the corresponding Technical reports, or obtain two or more special equipment inspector qualifications, or participate in technical competitions organized at the municipal bureau level or above and obtain the top three.
?4. Performance and achievement conditions After obtaining the title of assistant engineer, three of the following conditions must be met: ?
(1) Receive scientific and technological achievements awards at or above the municipal (department) level (to reward Certificate shall prevail, limited to designated personnel).
?
(2) Participate in more than one formulation and revision of national standards, procedures, and norms, or participate in more than two formulations and revisions of industry, local, and group standards, procedures, and norms (top five), And be implemented with the approval of the competent department, or participate in the formulation of more than two enterprise standards (top three), and make them public on the "Enterprise Standards Information Public Service Platform". ?
(3) Participate in the completion of more than two units (departments) in the introduction of new technologies, new product development, and promotion of new technological achievements, and achieve significant social and economic benefits, or participate in proficiency testing and laboratory comparisons Yes, and achieved satisfactory results, or participated in more than 2 quality arbitration inspections, product quality risk monitoring (assessment), product quality appraisal, accident technical appraisal, type evaluation, safety evaluation, and technical review work, and the technical report prepared was recognized by the competent department , or participated in more than 2 energy measurement technology review works, and the technical reports prepared were adopted by relevant units, or as technical experts, participated in accident investigation work organized by departments at or above the county level and played an important role, and the technical reports prepared were adopted by the competent authorities. ?
(4) Obtain more than 1 national invention patent in this major or more than 2 utility model patents related to this major (subject to the patent certificate). ?
(5) Participate in the completion of science and technology planning projects, engineering projects, and technological transformation projects at or above the provincial (ministerial) level, or participate in the completion of science and technology planning projects, engineering projects, and technological transformation projects at the municipal (department) level (formerly Five), or mainly participated in the completion of more than 2 scientific research projects of the unit, passed the acceptance or appraisal by the competent department, and the results were applied. ?
(6) Participate in the establishment of the unit (department) standard system, prepare quality system documents, and pass the acceptance of the competent department, or participate in the establishment of one social public measurement standard or the highest measurement standard for enterprises and institutions Those who have passed the measurement standard assessment, or participated in the preparation of new inspection projects and have more than one item approved by the relevant departments, or participated in the implementation of the technical regulations, standards and specifications of the profession, and have more than two items confirmed by the relevant departments. ?
(7) Participate in the preparation of more than 2 standardized technical specifications (top three), or participate in the development of new inspection and testing methods and the research of new inspection equipment, and solve problems in enterprises, institutions and production Unconventional testing issues (top three), and prepare more than 2 corresponding technical documents, or mainly participate in the preparation of normative documents at the county (municipal bureau) level or above on the topics of standardization, measurement, and quality management, and publish and implement them, or Compile professional research reports on standardization, metrology, and quality, and be adopted by governments, departments, and units at or above the county or city bureau level, or participate in the unit's laboratory qualification accreditation, institutional assessment, and quality improvement, and pass the assessment or be adopted or be adopted by relevant authorities The department has confirmed, or more than one of the proposed scientific and technological suggestions has been adopted by the relevant departments or units, and after peer review by experts, it is believed that it will have a certain role in promoting scientific and technological progress or industry development (review materials are attached). ?
(8) Publish more than 1 professional paper in a published academic journal independently or as the first author, or write technical reports for projects directly undertaken by yourself (project establishment report, feasibility analysis report , scientific experiment report, research design report, technical demonstration report, etc.) 2 or more. (9) Engineering and technical personnel on the front line of enterprise production have completed the digestion and absorption of advanced technological achievements or introduced more than one medium-sized advanced equipment, have innovative technological achievements, and have passed the appraisal (acceptance) of the municipal (department) level business department. ?