1. When using threaded connection, all valves should be closed first, and then after installing the cylinder, the pipeline must be supported to avoid sagging and deformation of the pipeline.
2. When flange connection is used, the joint should be cleaned first, and a gasket should be inserted at the joint, so as to better locate and keep the cylinder in a proper position.