brief introduction
Jiangjin Dingshan Yangtze River Bridge is a twin-tower cable-stayed bridge, with two floors, the upper layer is an expressway and the lower layer is reserved for Chongqing Rail Transit Line 5. The total length is 6066 meters, the main steel bridge is 897 meters, the main span is 464 meters, the total steel consumption is 26,000 tons, and the total investment is 2.8 billion yuan. It is not only the bridge with the highest tower, the largest span, the largest investment and the most complete functions in Jiangjin, but also the bridge with the largest main span in Chongqing.
The bridge consists of 1 Yangtze River Bridge, 2 tunnels (Aipingshan Tunnel and Leizui Tunnel) and 3 interchanges (Jinxi Interchange, Jiangzhou Interchange and Xiaowan Interchange). It starts from the south bridge head of Jiangjin Yangtze River Highway Bridge in the south, and crosses Aipingshan Tunnel in the north to connect with Dingshan Avenue. The main bridge crosses the Yangtze River and enters Jiulongpo District, and communicates with Chongqing Outer Ring Expressway and Xipeng Park in Xipeng Xiaowan.
work progress
Jiangjin Dingshan Yangtze River Bridge was built by China Construction Sixth Bureau. It was officially started on October 24th, 2009/kloc-0, and was completed and opened to traffic on June 26th, 20 13. * * * Used 134 1 day.
In more than 1000 days and nights, the bridge contractor has carried out a series of scientific and technological innovations. 16 technologies have been authorized by the state patent, 25 applied technologies, 1 enterprise technical standards and 4 new equipment. These technological innovations not only ensure the quality and safety of bridge engineering, but also save more than 40 million yuan in construction costs for Jiangjin.
20 12 Jiangjin "July 23rd" flood, the steel box of the Dingshan Yangtze River Bridge was almost flooded, but the bridge stood still and successfully resisted the impact of the flood. In 20 13, the Dingshan Yangtze River Bridge project was appraised as an international advanced level by experts from the appraisal committee organized by China Construction Corporation.
Construction chronology
In 2009,165438+1October 8th, the first pile was drilled.
On April 29th, 20 10, the bearing platform of the main pier came out of the water.
2011On July 24th, N ramp, the first span box girder was poured.
201265438+1October 5th, steel beam hoisting.
201265438+1October 18, the main tower on the south bank was capped.
20 1 April1Steel beam bridge deck crane is assembled.
2065438+February 8, 2003 Bridge closed.
On June 5, 20 13, the asphalt laying of the main bridge was completed.
The bridge was opened to traffic on June 26th, 2003.
Important significance
This bridge is a control project for jiangjin district to undertake industrial transfer and integrate into the main urban area of Chongqing, and it is also one of the important infrastructures for jiangjin district to develop and construct Binjiang New Town. According to the person in charge of jiangjin district, Jiangjin is a large satellite city with a planned population of 6,543.8+0,000 and an area of 6,543.8+0,000 square kilometers. Jiangjin Dingshan Yangtze River Bridge crosses the Yangtze River in the north, goes under the Leizui Tunnel, and connects Xipeng Industrial Park and Outer Ring Expressway via Xiaowan Overpass. The south passes through the east and west urban areas of Jijiang Peninsula, detours to the north, connects with Jiangjin Yangtze River Highway Bridge, Jinma Road and Xijiang Avenue, and forms a huge loop connecting Jiangjin Jijiang Peninsula, Degan Group, Binjiang New City and Shuang Fu New District with the outer ring expressway of the main urban area.
It is understood that for a long time, due to the barrier of the Yangtze River, Jiangjin city center has been confined to the corner of the Jijiang Peninsula, resulting in relatively backward urban development. With the establishment of the development goal of "Double Hundred Cities" in Jiangjin, Jiangjin seized the opportunity of the "outer ring era", actively docked with the main city, the urban development spanned the north of the Yangtze River, and accelerated the construction of Shuang Fu New District and Binjiang New City adjacent to the west of the main city. The completed Jiangjin Dingshan Yangtze River Bridge shortens the distance from Jiangjin central city to Chongqing main city to 34 kilometers, integrates the internal and external transportation backbone networks of Jiangjin urban agglomeration, and plays a tactical fulcrum role in the development of the "second ring road" area of the main city. It not only connects the urban agglomerations along the Yangtze River in jiangjin district, such as Jijiang Peninsula, Shuang Fu New District, Binjiang New City, etc., but also takes a key step for the expansion of Jiangjin city. The bridge connects Jiangjin urban agglomeration with the university town and Shiroishi Castle in the main urban area of Chongqing.
Bonus; prize
Dingshan Yangtze River Bridge won the "Luban Award for Chinese Architectural Engineering" from 20 14 to 20 15. There are 96 selected projects in China, and the Dingshan Yangtze River Bridge is the only project in Chongqing that won this honor.
"Luban Award for Chinese Construction Engineering" is the highest honor award for engineering quality in domestic construction industry. 1987 was established with the support of the Ministry of Construction. The award is reviewed once a year and awarded once every two years. In addition to meeting the national and industry standards, the construction quality of selected projects must also reach the leading level of similar projects in China.
Dingshan Yangtze River Bridge was selected as the' Bayu Cup' quality engineering award in Chongqing in 20 13 due to its high technology content. "During the construction of the Dingshan Bridge, the design unit and the construction unit carried out a series of scientific and technological innovations, and successively * * * 16 technologies were granted national patent authorization." Yi Dongmei, deputy director of jiangjin district Binjiang New Town Management Committee, said that the bridge construction has not only obtained 6 invention patents, but also formed 25 application technologies, 5 construction methods, 1 enterprise technical standards and 4 new equipment. The research results of key technologies of highway-railway cable-stayed bridge in the upper reaches of the Yangtze River have been rated as the advanced level in the world.