Compilation outline of project feasibility study report

1, the significance and necessity of the project, the analysis of domestic and international status, technical development trend and industrial relevance, and the analysis of a certain field;

2. The technical basis of the project: the source of achievements and intellectual property rights; R&D work, pilot test and appraisal period have been completed; The characteristics of the technology or process, and the advantages compared with the existing technology or process; The significance and function of the breakthrough of this major key technology to the technical progress of the industry;

3, the construction plan, scale and location;

4, technical characteristics, technical route, equipment selection and main technical and economic indicators;

5, the supply of raw materials and the implementation of external supporting conditions;

6. Prevention and control of environmental pollution;

7, the construction period and schedule;

8. Project implementation management, labor ability and personnel training;

9, the nature and general situation of the project undertaker or project legal person ownership (sales revenue, profits, taxes, fixed assets, asset-liability ratio, bank credit rating, etc.). ), the basic situation of the project leader;

10, investment estimation, fund raising, liquidity and sources required for loan repayment plan;

1 1, calculation and evaluation of internal rate of return, investment profit rate, investment payback period and loan repayment period;

12, analysis of economic and social benefits;

13, project risk analysis.

Attachment: Attachment of the feasibility study report of the project:

L, bank loan certificate (above a branch) documents;

2, the bank issued by the enterprise's own funds certificate;

3, local and departmental matching funds and other sources of funds;

4. The business license issued by the Industrial and Commercial Bureau and the certificate of the nature of the enterprise provided by the competent department of the enterprise;

5. Proof materials of previous scientific research achievements (such and such ministerial-level scientific and technological achievements appraisal materials, patent certificates or other proof materials);

6. Opinions of the competent department of environmental protection;

7, issued by the relevant departments of the product production license documents (medicine, biology, pesticides, etc ... );

8, raw materials and external supporting conditions (site, water, electricity, steam, etc. );

9. Other required certification materials.