20 15 examination questions for secondary constructor-"Regulations and related knowledge"

Multiple-choice questions (***60 questions, each with 1 point, and only 1 in each option best meets the meaning of the question)

1. If the registered construction engineer or the unit to which he belongs fails to provide his credit file information as required, the relevant competent department shall order him to make rectification within a time limit, and if he fails to make rectification within the time limit, he may be fined a certain amount. The fine amount should be ().

A. From 500 yuan to 20 million yuan.

B. 1000 yuan to 50 million yuan.

C. 1000 yuan and 80 million yuan.

D. 1000 yuan and 1000 yuan.

2. The contract dispute between Company A and Company B was arbitrated by the Arbitration Commission, and both parties refused to accept the ruling, believing that the facts identified by the arbitration tribunal were seriously wrong, and the arbitration commission later determined that the facts reflected by the parties did exist, and the facts identified by the arbitration tribunal were seriously wrong. In this regard, the correct way to deal with it is ().

A. Company A and Company B reach an arbitration agreement again and apply for arbitration.

B the arbitration Commission cancels the arbitration award, and both parties re-select arbitrators for arbitration.

C. Company A and Company B bring a lawsuit to the people's court on the matters that have been decided.

D company a and company b request the people's court to cancel the arbitration award.

3. Zhang, who is engaged in special operations, lends his special operation certificate to others. Therefore, Zhang was warned and fined. The fine amount should be ().

A./kloc-less than 0/000 yuan

1000 yuan to 2000 yuan

More than 2000 yuan 10000 yuan.

D. 1 ten thousand yuan or more

4. In the following legal departments, energy conservation law belongs to ().

A. Economic law

B. Social law

C. Administrative law

D. Civil and commercial law

5. A school signed a contract with a plastic-steel window processing factory to process plastic-steel windows, and the factory put forward work requirements to the plastic-steel window processing factory, accepted the work results as agreed and paid remuneration. The school is called ().

A. contractors

B. Employers

C. producers

D. agent

6, the bidder won the bid for a construction project, the contract amount of 68.5 million yuan, the performance guarantee amount should be ().

0.65 million yuan

B.700 million yuan

About 750 million yuan

800 million yuan

7. The completion date agreed in a project construction contract is 20 14 10 3 1. During the project construction, the following situations occurred: (1) Party B's equipment was delayed to enter the site for 7 days when it started; (2) A flood occurred during the construction, which delayed the construction for 7 days; (3) During the construction period, water supply and power failure accumulated to 84 hours due to reasons other than the contractor; (4) If the workload increased by the design change reaches 7 days, the actual completion date of the project should be ().

A.20 14 1 1.7

B.20 14165438+1October14

C.2014165438+1February 2 1.

D.2014165438+1October 28th

8, the following options, does not belong to the mandatory standards currently implemented in our country is ().

A it has been clearly defined as a mandatory standard when it is approved for publication.

B. Although it is not explicitly stipulated as a mandatory standard when approving the release, its serial number is not "/t".

C. Although it is not explicitly a mandatory standard when it is approved for publication, its number is marked with "/t".

D Although it is not explicitly stipulated as a mandatory standard at the time of approval, it contains mandatory provisions (in bold type), and the number is not marked with "/t"

9, whether to nearly five years to complete the quality of construction general contracting project as the standard, measure the actual ability and level of enterprises. The amount of a single Jian 'an contract that meets the qualification of a secondary construction general contracting enterprise should exceed ().

200 million yuan

B. 1 100 million yuan

About 30 million yuan

500 million yuan

10, about the project completion acceptance, the following statement is wrong ().

A. The completion acceptance can only be carried out after the completion of the construction project design and the project agreed in the contract.

B. If the construction project has not been verified by the planning acceptance or does not meet the planning conditions after verification, the completion acceptance shall not be organized.

C. A project that should be subject to fire control acceptance according to law shall not be organized for completion acceptance without fire control acceptance or unqualified fire control acceptance.

D the completion acceptance of environmental protection facilities shall be carried out at the same time as the completion acceptance of the main project.

1 1. A construction company owes 30,000 yuan to Party B's material supplier, and agreed to repay it in April 1, 2065438. But by May of 20 14 and 1, Party A had not paid back the money. On June 3, 20 14, Party B asked Party A to pay and verbally agreed to postpone the repayment. The legal effect of this behavior is ().

A. Interruption of the statute of limitations

B. suspension giving rise to the statute of limitations

C. lead to the extension of the statute of limitations

D. Change the statutory limitation period

12. Zhang works in a construction company and wants to terminate the labor contract with the employer before the contract expires, so the time for Zhang to notify the employer in advance in writing is ().

A. 10 days

B. 15 days

C.20

D.30 days

13, a construction project contract dispute was tried by the people's court of second instance, and the ruling was sent back to the people's court that originally tried it for retrial. The following does not belong to the reason for sending back for retrial is ().

A. The facts are not clear

B. Violation of legal procedures

C. Insufficient evidence

D. Wrong application of the law

14. The construction contract stipulates that the project progress payment shall be paid monthly. The contractor has been in construction for more than six months, and applied to the employer for urging the payment of progress payment every month, but never paid it. Therefore, the contractor applied to terminate the contract. After the termination of the contract, the following behavior is wrong ().

A. the employer may not be liable for breach of contract.

B. the contractor shall terminate the performance of the contract.

The employer shall compensate the contractor for the unpaid losses.

The contractor may still ask for settlement of the completed part of the project cost.

15. Party A purchased 500,000 yuan worth of steel from Party B, and the contract stipulated that Party A would pay in 65438+February 65438+February. Previously, due to another contractual relationship, Party B owed Party A 300,000 yuan, which was due on June 5438+February 1, and Party B never paid it. On February 25, 65438, Party A received a notice from Party B that Party B had transferred 500,000 yuan of steel creditor's rights to Party C ... On February 28, 65438, Party C demanded 500,000 yuan from Party A for steel. The following option is correct ().

A. Party B's assignment of creditor's rights is invalid, and Party A shall pay Party B 500,000 yuan.

B party b's assignment of creditor's rights is invalid, and party a only needs to pay 200,000 yuan to party b, and another 300,000 yuan can claim offset.

C. The creditor's rights transferred by Party B are valid, and Party A shall pay 500,000 yuan to Party C..

D. The creditor's rights transferred by Party B are valid, and Party A only needs to pay 200,000 yuan to Party C, and another 300,000 yuan can claim for offset.

16, the national standards for engineering construction are divided into mandatory standards and recommended standards. The following are not mandatory standards ().

A. General comprehensive standards for engineering construction (including installation) and acceptance.

B. General standards for safety, health and environmental protection in engineering construction

C terms, symbols, codes, quantities and units, building modules and drawing method standards commonly used in engineering construction

D. Important general test, inspection and evaluation methods and standards for engineering construction

17. The economic disputes between Party A and Party B shall be settled through court mediation. In this regard, the following statement is wrong ().

The court may invite relevant units and individuals to assist in mediation.

B to reach an agreement through mediation, it must be voluntary by both parties and cannot be forced.

After reaching an agreement through mediation, the people's court must make a conciliation statement.

D. After being signed by both parties, the court conciliation statement has the same legal effect as the judgment.

18, a construction enterprise urgently needed the professional construction of the project, and hired a senior professional worker C who did not terminate the labor contract with construction enterprise B, causing great economic losses to construction enterprise B. For the economic loss of enterprise B, the following statement is correct ().

A. party c shall be liable for compensation.

B. party a shall be liable for compensation.

C. party a does not assume any responsibility.

D. Party A and Party C shall be jointly and severally liable for compensation.

19. In the equipment installation stage of the project, a crane with lifting capacity of 1Ot is needed to hoist large-scale permanent equipment. When the contractor signs the construction machinery leasing contract with the equipment leasing company, the materials required by the equipment leasing company do not include ().

A. manufacturer's crane manufacturing license

B. certificate of quality of crane products.

C. mechanical fuel consumption quota certificate.

Safety performance inspection certificate issued by a qualified inspection and testing institution.

20, the construction market integrity behavior record information release period, according to the specific circumstances have different provisions. The following statement is wrong ().

A. The publication period of the information of the integrity behavior records in the construction market is generally 6 months to 1 year.

B. the information disclosure period of good behavior records is 3 years.

C. If the rectification of the reviewed enterprise is indeed effective, the publicity period may be shortened, but the shortest time shall not be less than 3 months.

D. The announcement period of the record of illegal bidding and tendering is 6 months (2 1). About the work-start report system, the following statement is wrong ().

A. The commencement report system is an administrative licensing system stipulated by the competent department of the State Council government.

B. The construction unit shall report the commencement report to the competent government department.

C. The commencement report is to review the commencement conditions that the construction unit should have.

D the commencement report is to review the commencement conditions that the construction unit should have.

22, for a revocable contract, the following situation can't meet the requirements is ().

A. both parties demand to continue to perform.

B. After both parties reach an agreement to change the contract, the court requests to cancel the contract.

After the parties request to cancel the contract, the court may cancel the contract.

D. the parties apply to the court or arbitration institution to terminate the contract.

23, the construction site related construction personnel, found that steel pipe piled up too high and no protective facilities, immediately report to the relevant personnel. This person should be ().

A. on-site safety inspectors

B. Professional supervision engineer

C. The person in charge of the contractor

D. Safety production supervision station

24, the content of the construction unit fire inspection does not include ().

A. Fire water source

B. Configuration of fire fighting equipment

C. Foundation pit enclosure

D. Is there any violation of electricity consumption regulations?

25, about the evidence, the following statement is correct ().

A the people's court may, according to different circumstances, reject the evidence submitted by the parties within the time limit and the reasons cannot be established.

B. In the process of evidence exchange, disputed evidence will not be accepted.

Evidence without cross-examination cannot be used as the basis for determining the facts of the case.

D. the appraiser shall appear in court to accept the inquiry of the parties.

26. Among the conditions for granting a patent right, the condition that does not belong to the invention and utility model patent is ().

A. novelty

B. Creativity

C. Suitable for industrial application

D. practical

27, a construction enterprise in February 20 1 1 year 1 day to handle the safety production license, after the expiration of the period of validity to the original issuing authority for () extension procedures.

A. February 20 14- April 2065 438+04

B.20 13 1 1 month ~ 20 14 1 month

C.july c.2013 ~ june 20 14 1

D. February 20 14- July 2065 438+04

28, the following constitutes a major engineering safety accident crime behavior is ().

A. The safety protection net of a construction site was destroyed, causing workers to fall from the upstairs and die.

B. When underground concealed works are carried out at the construction site, the exposed steel bars are unprotected, causing personal injury.

C. A project supervision unit found that the construction unit excessively pursued the construction progress and seriously failed to meet the project quality requirements, but did not exercise the supervision function according to law, resulting in the collapse of buildings and many casualties.

D. Bidders collude with each other in bidding quotation, which harms the interests of the tenderee or other bidders.

29. Party A undertakes the project contracted by Party B. During the project implementation, Party B requires Party A to complete sporadic projects outside the contract. In this regard, A's improper practice is ().

A. Submit the construction visa to Party B within 10 days after accepting Party B's request.

B the visa items submitted include the quantity and unit price of labor, the quantity and unit price of mechanical shifts, the materials used and the amount.

The construction of sporadic projects began after the C.B visa.

D. In order to maintain a good cooperative relationship, Party B shall start the construction without obtaining a visa, and bear the responsibilities for the disputes arising therefrom.

30, construction projects need to continue to use after the reasonable service life, the first thing the property owner should do is ().

A entrust a survey and design unit with corresponding qualification grade to formulate technical reinforcement measures.

B, entrust the construction unit with corresponding qualification grade for reinforcement, maintenance and reinforcement.

C entrust a survey and design unit with corresponding qualification grade for evaluation.

D, entrust a survey and design unit with corresponding qualification grade to re-determine the service life.

3 1, among the following project costs, the one that belongs to the priority compensation scope of the construction project price is ().

A. Interest arising from delayed payment of project funds

B. Loss of shutdown due to delay in on-site delivery

C. claims arising from employer's breach of contract

D. Material fees paid by the contractor

32, a construction enterprise in the inspection of building materials, took the following measures, is not in conformity with the provisions of ().

A. Building materials that have not been inspected or failed to pass the inspection shall not be used in the project.

B based on the engineering design requirements and construction technical standards.

C. take the contract as the inspection basis.

D. Make written records of the inspection results and file them.

33, engineering supervision unit should undertake engineering supervision business according to law, the following engineering supervision unit behavior is correct ().

A lend the qualification of this unit to other engineering supervision units to undertake engineering supervision business.

B undertake engineering supervision business in the name of other engineering supervision units.

C undertake the engineering supervision business within the scope permitted by the qualification grade of the unit.

D transfer the bid-winning engineering supervision business to other engineering supervision units with the same qualification.

34. If the price or remuneration is not clear during the performance of the contract, it shall be performed at the agreed price. The stipulated price is ().

A. the market price at the place of performance when the contract is concluded

B. government pricing at the place of performance when signing the contract

C. the government-guided price at the place of performance at the time of conclusion of the contract

D. the market price at the place of performance when the contract is performed.

35, composed of various departments of a country's current law, organically linked unified whole is usually called ().

A. Legal form

B. Rule of law

C. Legal norms

D. Legal department

36. A construction company is on the verge of bankruptcy. 2065438+2004120 during the legal rectification, Zhao and others were laid off. If the company needs to re-employ personnel after reorganization, it shall give priority to the laid-off personnel such as Zhao within the prescribed time limit. The deadline for this semester should be ().

2065438+February 20, 2004

2065438+April 20, 2004

C.2065438+July 20, 2004

D.2015 65438+1October 20th

37, the main person in charge of the construction unit fails to perform the duties of production safety management, but no safety accident, the preferred punishment is ().

A. Order to suspend business for rectification

B. impose a fine.

C. Giving dismissal

D. Order correction within a time limit

38, about the government's evaluation of market participants' honesty, the following statement is wrong ().

A. Evaluate the integrity of market participants according to the record of administrative punishment for illegal acts.

B. Records of administrative penalties for market participants who violate compulsory obligations stipulated in various administrative laws.

C. Based on the legal responsibilities related to the construction market, we can focus on the focus and hot issues of social concern.

D. Marketization evaluation based on the credit platform records of the construction market

39. The construction enterprise undertakes the reconstruction project of the cultural relics protection unit without obtaining the qualification certificate of the corresponding level of cultural relics protection project. Therefore, the enterprise was punished and fined accordingly. The appropriate fine should be ().

A.50,000 yuan or less

B.50000 yuan to 200000 yuan.

C.50,000 yuan to 500,000 yuan.

D.50 More than 500,000 yuan

40. A construction project quality accident occurred, which was identified as being caused by the designer. To this. The legal obligation that the design unit should perform is to put forward the corresponding ().

A. Technical solutions

B. Loss compensation scheme

C. Responsibility identification scheme

D. design change scheme 4 1. If the construction unit misappropriates the cost of safety protection and civilized construction measures, it shall be ordered to make rectification within a time limit and impose a fine of a certain proportion of the misappropriation cost. The ratio is ().

A. 10% to 20%

B. More than 20% and less than 30%

C. More than 20% and less than 50%

D. more than 30% and less than 50%

42, about the responsibility and authority of engineering supervision, the following statement is correct ().

A. Without the signature of the supervision engineer, building materials, building components and equipment shall not be used or installed in the project.

B without the signature of the supervision engineer, the construction unit will not allocate the project funds.

C. Without the signature of the supervision engineer, the construction unit will not conduct the completion acceptance.

D the supervision engineer has no right to decide whether to allow the construction unit to carry out the construction of the next working procedure.

43. Company A applied to the court for enforcement according to the effective judgment. After the execution begins, both parties reach a settlement agreement. The settlement agreement stipulates that Party B's debt of 800,000 yuan will be reduced to 700,000 yuan, and Party B will pay it off within 1 month from the effective date of the agreement. 1 After this agreement comes into effect, Party B fails to perform this agreement. The following statement is correct ().

A. Party A brings a civil lawsuit to the court where Party B is located for Party B's violation of this Agreement.

B. Court enforcement of the settlement agreement

C. the court resumed the execution of the original judgment ex officio.

D. A applies to the court for execution according to the original effective judgment.

44. The Employer fails to pay the project completion settlement within 15 days after receiving the contractor's application, and the contractor's reminder is fruitless, and both parties fail to reach an agreement on deferred payment. In this regard, the treatment method that can be taken is ().

A after negotiation, the people's court of the contractor will auction the project according to law, and the contractor will get the compensation of the auction price of the project first.

B. If the contractor discounts the project, he will get the payment of the discounted amount of the project first.

C. If the contractor negotiates with the employer to auction the project according to law, the contractor will give priority to paying the project price.

D the contractor negotiates the project discount with the employer, and the contractor gives priority to paying the project discount.

45, a bank to provide engineering guarantee for a construction enterprise, the correct way should be taken is ().

A. Written form

B. Oral form

C. Other forms

D. There is no clear definition

46. A construction unit and B construction unit signed a warranty contract on the project contracted by A to B through equal consultation. The warranty period agreed in this contract is legally binding ().

A. roof waterproofing works shall be leakproof for 3 years.

B. the electrical pipeline project is 2 years.

C. The leakage prevention of toilets with waterproof requirements is 2 years.

D equipment installation project is 1 year.

47, about the legal status of the contract model text, the following statement is wrong ().

The parties may conclude a contract by referring to the model texts of various contracts.

B. the reference function of the model contract text for the parties to conclude a contract

C. when signing a contract, the model contract text must be used.

D whether the contract is established is not directly related to whether the model contract text is adopted.

48, in the property insurance contract, the transfer of the insurance contract shall be notified ().

A. Insurance brokers

B. Insurance companies

C. Beneficiaries

D. policyholders

49. A provincial and municipal construction committee fined an enterprise 500,000 yuan. The enterprise refused to accept it and applied for administrative reconsideration to the construction department of a province. The following statement is correct ().

An enterprise can only apply for administrative reconsideration in written form.

B after the construction department of a province accepts the administrative reconsideration, the enterprise shall not bring an administrative lawsuit to the court within the statutory administrative reconsideration period.

C. An enterprise cannot entrust an agent to participate in administrative reconsideration.

D the administrative reconsideration decision of the provincial construction department shall be made within 60 days from the date of accepting the application for administrative reconsideration.

50, an architectural design unit in the design documents, the correct way to choose building materials and equipment without special requirements is ().

A according to the requirements of the construction unit, the quality standard has been relaxed appropriately.

Indicate the manufacturers and suppliers of building materials and equipment.

Briefly describe the performance of building materials and equipment.

D indicate the specifications and models of building materials and equipment.