How to construct the mud tile project? Mud tile construction steps

How to construct the mud tile project? Mud tile construction steps

Ceramic tile construction is a very important part in home decoration. Construction workers need to clean the base, find the slope layer, make waterproof layer, make insulation board, hang tiles and deal with details. These construction steps have clear relevant regulations to ensure the smooth progress of the mud tile construction process. So how to construct the mud tile project? Next, I will bring you the steps of mud tile construction, hoping to help you.

Mud tile project: waterproof layer

The first thing the bricklayer did was to construct the waterproof layer of the kitchen and bathroom. In the choice of waterproof materials, most of them choose cement mortar. During construction, the bricklayer will smooth the cement slurry at the grass-roots level, and then start waterproof treatment. Keep the thickness above 1.5mm, and remember to do the closed water test.

Mud tile project: thermal insulation layer

The insulation layer is divided into sloping roof and flat roof. When bricklayer works, the sloping roof should be leveled first, and then spread with perlite, and the surface should be smooth. After inspection, steel wire mesh shall be bound with steel dowel. The flat roof construction scheme is the same, but steel wire mesh is not needed.

Mud brick project: ceramic tile surface

Masons must make full preparations for tile surface construction, and carefully check the quality of materials to see if the tiles are incomplete, cracked and uneven. These have a great connection when bricklayers lay tiles. After tiling, the minimum matching length of upper and lower tiles is 100mm, and cement colored tiles are paved with fine stone concrete. From right to left, from bottom to top.

Mud tile project: wall and floor tile laying

Bricklayers should lay floor tiles in a standardized way, and polished tiles should be waxed first to prevent discoloration. When laying floor tiles, corners, colors and gaps should be eliminated. If the flatness deviation is large, use mortar to lay bricks, and the thickness shall be controlled at about 7- 10 mm. ..

The height of the bricklayer from the wall brick to the ground should not exceed 0.5mm, and the floor drain should be at the lowest point indoors, otherwise it will have no effect. If the floor tile has shading, it should be pasted again if it is wrong. Put it in an inconspicuous place when pruning. After laying, it should be protected with cardboard, and it is not allowed to work on it for 36 hours.

The above is how to construct the ceramic tile project brought by Bian Xiao. The whole content of mud tile construction steps.