Summary of the annual work of architecture in 2020 (I) In 2020, under the correct leadership of the construction group, the company closely focused on the development goals of the company's production and operation, and successfully completed various tasks. The main work in 2020 and the work arrangement in 20021year are reported as follows:
I. Review of Main Work in 20XX
Adhering to the guiding spirit of "year of basic management" and following the working idea of "laying a solid foundation, stimulating vitality, improving management and developing steadily", the company has gone all out to carry out various tasks and achieved remarkable results.
(1) Strengthen equipment safety management and steadily improve the level of safety management.
1. By the end of xx, 2020, the company realized equipment rental income of xx million yuan, including large-scale equipment and electromechanical income of xx million yuan and interlocking block income of xx million yuan. It is estimated that by the end of xx, the equipment rental income will reach xx billion yuan.
2. By the end of xx, large machinery has been dispatched for more than xx times, and small machines and tools have been dispatched for more than xx times, so as to meet the needs of each branch for construction equipment in a timely and high-quality manner; Realize the average intact rate of equipment xx% and the average utilization rate of equipment xx%; * * * Organize equipment inspection xx times and equipment maintenance xxx times.
3. Organize the mobilization and mobilization of large-scale machinery in the company, including the mobilization, mobilization and installation of walking and building tower cranes, Komatsu 650 excavators, 150T crawler cranes and 50T crawler cranes to the ship engineering company. Organize the acceptance of new 1 xxx tower crane, 1 WCB500 stabilized soil station and 1 300KW generator set. At present, the stabilized soil station and generator set have been put into use.
4. Track the accounts according to the equipment ledger of the construction team, update the newly purchased, expired and scrapped equipment of our company in time, and realize the classified management of the ledger. Gradually improve the equipment operation data file, each equipment is equipped with a set of operation data, and record the daily operation status of each equipment, and maintain and replace the records on time.
(2) Continuously strengthen safety and quality management to further enhance the competitive advantage.
1, safety management
(1) According to the requirements of the company, on the basis of summarizing and analyzing the overall situation of safety and quality and the weak links in the previous year, the annual work plan and monthly work plan of safety, quality, education and training, maintenance and so on were formulated and compiled in combination with the actual situation; Organize the formulation and signing of the annual responsibility letter for safety, quality and environmental objectives between the company and various departments; Organize and complete the internal and external audit of the "three systems"; Organize and complete the safety and quality inspection and assessment of the construction team every month throughout the year; Complete the inspection, review and inspection of all kinds of special equipment in time.
(2) Actively carry out safety publicity activities. According to the requirements of the construction team, we will earnestly carry out activities such as "100-day safety without accidents", "site comprehensive improvement", "safe production month", "publicizing accident prevention and control manual", "carrying out fire traffic safety improvement", "carrying out grid management activities on site" and "carrying out19 fire week activities". In the process of activities, make a careful implementation plan, vigorously create an activity atmosphere, and improve employees' safety awareness and participation awareness.
(3) Seriously organize the publicity of the accident prevention manual. Constantly improve the company's emergency management system and implement hidden dangers inspection and rectification; Implement the safety control of high-altitude operations and dangerous operations, and pay special attention to the safety management of tower crane demolition, installation and large-scale equipment maintenance site; Actively manage the "model workshop"; Focus on the implementation of the "four defenses" work measures.
2. Quality management
(1) According to the company's standardized management standards, formulate and improve various management systems and workflows to meet the company's management needs. Focusing on the theme of "promoting transformation and upgrading, realizing a strong port with quality", we earnestly carried out the "Quality Month" activity and organized activities such as centralized dissemination and implementation of quality management standards, which further mobilized the enthusiasm of employees to participate in quality management and improve quality.
(2) Pay a return visit to each unit's service satisfaction every quarter, and pay a return visit from seven aspects: skill service of equipment operators, law-abiding of operators, service attitude of operators, equipment dispatching service, technical status of equipment, timeliness of equipment maintenance and other services. In 2020, the service satisfaction will reach 94% and 3%, reaching the annual quality index. Due to the evaluation and feedback of each unit, the technical condition of the equipment is poor and some equipment is seriously aging, so attention and rectification are carried out.
(3) Strengthen team building and comprehensively improve the overall quality of employees.
1, maintenance professionals strictly control the quality. Actively implement technological transformation and the application of "four new", do a good job in technological innovation, repair the old and make use of the waste. In February, the localization transformation of D85 bulldozer guide wheel was completed, saving more than 25,000 yuan in one time. Completed the technical transformation of bulldozer roller, saving nearly 10 thousand yuan at a time; Give full play to the creativity of personnel and develop an automatic feeder for painting and coding pipe racks, which has submitted a patent application; An automatic exhaust device for oil-gas separation was developed by ourselves, which solved several key technical problems and was successfully tested in the vehicle.
2. Organize mechanical operators and maintenance personnel to participate in mechanical and electrical maintenance related knowledge learning, safety production month education and training, and the latest industry standard "Inspection Standard for Lifting Equipment and Facilities in Construction" JGJ305-20 14 publicity and training, so as to comprehensively improve the operating skills of operators. * * * respectively send 1 1 mechanical drivers to Fujian, Nanjing, Weihai, Yantai, Jining and other construction sites to complete various tasks in their respective posts.
3. In view of the wide range of production sites and scattered personnel, make full use of Fetion and rainy days and holidays to carry out employee skills training, safety education, pre-holiday safety education, education on "strengthening road traffic and fire safety", "four precautions in summer" and "four precautions in winter", and organize "four strict and four suggestions", "safe production month" and "safe production".
(4) Continuously improve material management and further optimize resource allocation.
1. Establish and improve the list of qualified suppliers and strengthen supplier management. The new supplier catalogue provides a wider range of suppliers and more accurate supplier information, which can better meet the daily procurement of materials and accessories and provide a prerequisite for the timeliness of company procurement and the qualified rate of product quality. At the same time, further improve the management of suppliers, strengthen the evaluation of suppliers, listen to the opinions of various departments extensively, and evaluate suppliers fairly and fairly.
2, do a good job of waste materials management. In improving the Regulations on Material Management, the management of waste materials has been further strengthened and the waste materials have been distinguished. Give priority to the self-repair and utilization of waste materials, and the materials and equipment department of the construction team will manage those that cannot be used. For the materials deemed as scrapped by the company, our company will store them in a unified way and keep them by special personnel, and report them to the Materials and Equipment Department of the construction team for unified treatment.
(5) Continuously strengthen comprehensive management and create a good atmosphere for activities.
1, fully mobilize the potential of young people's collective innovation and efficiency, and give play to the strength of the Young Pioneers. Organize six league members to join young volunteers and actively organize and participate in youth volunteer activities; Organize employees to actively participate in the "10,000-meter" long-distance race in Rizhao Port, and one person won the prize; 1 person won the second prize in the essay activity with the theme of "safety in my heart"; 1 person won the first prize for the answer to the international archives day essay; One person won the third prize of "How to improve customer satisfaction". * * * Contribute X articles with the title of "xxxx", X articles with the title of "Three Entrepreneurials", and xx Spring Festival couplets will be submitted for the 2020 Spring Festival couplets collection * * *. Actively mobilize staff to participate in various essay competitions, enrich their spare time, and at the same time constantly enhance everyone's cohesion and centripetal force, laying a foundation for better investment in all work in the future.
2. Make full use of Rizhao Port Newspaper, Rizhao Daily and other media to mobilize employees to actively do a good job in external publicity. By the middle of xx, xx articles at the municipal level and X articles at the group level have been completed; Government information * * * published X articles, all of which have completed the annual task index of the Construction Group.
Two. 202 1
In 2020, our production and operation goal is to achieve an output value of xxxx million yuan and zero safety accidents.
The business plan of (1)202 1 mainly includes making full use of existing equipment, actively expanding business and looking for new profit growth points on the premise of ensuring the internal construction needs of the group; Create differentiated services and enhance the competitiveness of enterprises; Through quota management and refined management, internal cost accounting is refined.
(II) The investment plan for the equipment project in 2002 1 year includes the planned purchase of six 50-type wheel loaders, two crawler-type hydraulic excavators, 1 set of concrete interlocking block production line equipment, 1 set of WCB500 stabilized soil mixing station, 1 set of 20 cubic multifunctional sprinklers,1set/set.
(3) The technical transformation of 2021equipment mainly includes: continuing to install fuel consumption meters and GPS positioning systems on loaders, excavators, cranes and other large equipment; Upgrade the monitoring system of the pound house to monitor and manage the weighing process and unloading process of the skip more comprehensively; Install an emergency stop device on the conveyor belt of the stabilized soil mixing station to strengthen the safety control of the conveyor belt before and during operation; The dust removal at the top of cement tank in stabilized soil mixing station was reformed, and dust pollution was controlled by adding small tanks.
(4) Further improve safety management. Explore and improve the form and content of safety education, strengthen the effect of safety education, combine with the creation of youth demonstration posts, do a good job in the creation of "safety workshops", strive to raise safety management to a higher level, and lay a more solid safety guarantee for maintenance and production.
(5) In terms of equipment maintenance, we should adhere to the working principle of "maintenance first, combining maintenance" and actively promote the guiding ideology of equipment management of "maintenance first". The Equipment Leasing Section will assign a special person to supervise the equipment maintenance to ensure that the equipment is not lost.
(6) Strengthen the comprehensive quality education of all employees, strengthen the knowledge training of mechanical equipment operation and equipment maintenance and all kinds of safety education, strengthen the comprehensive quality of employees, improve the operation and maintenance level of employees, and ensure the safe operation of each employee and the safe production of all kinds of mechanical equipment. Guide employees to enhance their awareness of technical knowledge and strive to build a positive, United and enterprising high-quality maintenance team.
Summary of the annual work of architecture in 2020 (II) When the footsteps of the New Year come quietly, my work in XX Construction Co., Ltd. will come to an end in 2020. In the past year, with the careful care and help of the company leaders, department managers and colleagues, I seriously studied and understood the corporate culture spirit of the company, kept in mind the company's purpose and mission, followed the corporate philosophy, obeyed the work arrangement, strengthened my study and exercise, earnestly performed my duties, and successfully completed various tasks assigned by the leaders. Now, I will summarize my thoughts and work this year and my future efforts as follows:
I. Work Report for 2020
With the pursuit of ideals and love for architecture, I came to xx Construction Co., Ltd. in XX County in 2020 and worked in the General Management Department. In this year's work, I am engaged in the bidding of the company's engineering projects, the sending and receiving of documents, the declaration of professional titles, and the filing of the company's internal files. Has participated in the company's XX hospital outpatient building renovation project, XXXX comprehensive teaching building, XXXX maintenance and renovation project, XXXX project, XXXX low-rent housing project, XXXX project and other more than 20 large and small engineering projects bidding and binding.
At the same time, receive all kinds of documents issued by superiors in time and report them to the general manager and chairman for approval. The spirit and notice of relevant documents after examination and approval shall be distributed to all project departments in time, and all distributed documents shall be registered. Respond positively to the notice issued by the superior to declare the assistant engineer's documents, and organize the internal personnel of the company to declare actively. The number of assistant engineers declared this time is xx. In order to further improve the company's internal management requirements, the company's internal files are re-standardized. Set up the company's archives room, register and file the company's internal data according to different years and different projects, and record them in the book, so as to make the company's internal management target by going up one flight of stairs.
Second, be positive, correct working attitude, seriously study and understand the company's corporate culture, and take every study and training seriously.
Seriously study and understand the company's corporate culture, carefully study the company's relevant management regulations and documents, and learn the company's relevant meeting spirit and leadership speeches. Through the study, I learned that the company has put forward very concise and incisive requirements for building quality, safe production, enterprise management and team building. Clarify the company's future development ideas and key work and requirements at this stage. Consciously and actively put the ideas and concepts of the corporate culture of the whole company into practical work, and guide us to better complete various tasks.
In order to further establish a correct outlook on life and values, and improve my self-cultivation and consciousness, I actively joined the company's working committee to learn about the line, principles and policies of the party and the country, and submitted an application for joining the party.
I take every training and study organized by the company seriously. The company is people-oriented, concerned about people's development and caring for employees. I feel the same way. The company spends a lot of manpower, material resources and financial resources to organize various trainings frequently to train employees. In this year's time, I have the honor to participate in the study and training of cost engineers, consolidate my theoretical knowledge, learn my business skills at work, and get tested in practical work, which will benefit me immensely.
Three, strengthen the study of various professional knowledge, and strive to improve their professional knowledge level in all aspects.
With the continuous development of society and the continuous progress of the company, what we have learned is far from meeting the requirements of the company. In this regard, I used my business time to learn many professional knowledge such as economic management of project cost, construction laws and regulations, construction contract management norms and so on. To improve my professional knowledge and technical ability and pave the way for the development of the company.
Fourth, know yourself correctly and find out the gaps and shortcomings.
In this year of work, my ideological understanding and working ability need to be further improved. My knowledge and understanding of some problems is one-sided and not objective enough, which leads to some negative thoughts in my work and life. In the future, I will strengthen my study, improve my ideological understanding and face my work and life positively and optimistically.
In terms of work, the thinking is not clear enough, and there is a phenomenon that you want to do things well but you can't do them well. I don't have a deep understanding of the knowledge I need and the business I should be engaged in. Some problems are not considered comprehensively, and sometimes the views and practices on things are relatively one-sided, which leads to the phenomenon that work is delayed. The study and understanding of the company's rules and regulations is not comprehensive enough, and the company's rules and regulations can not be better reflected in every detail of their work. It is necessary to further strengthen the re-study, re-understanding and re-understanding of the company's rules and regulations.
In the study, the knowledge learned has not been effectively consolidated. Not using and operating immediately after learning and training, leading to the phenomenon of learning today and forgetting tomorrow. I will learn and consolidate knowledge points according to the memory cycle in the future.
Verb (abbreviation of verb) In the future, we will constantly improve our comprehensive quality and make contributions to the development of the company.
With the rapid development of the company, it can be expected that our work will be more arduous and demanding, and the knowledge we need to master will be broader and deeper. To this end, I will work harder, study hard, strive to improve my ideological and cultural quality and professional skills, and make due contributions to the development of the company.
Summary of annual work of construction in 2020 (III) Under the strong leadership of the group company and the development company, the xx project went smoothly. During my work in the project engineering department of xx Company, I strictly abide by laws and regulations, abide by the company's rules and regulations, and be strict with myself, honest and self-disciplined. Dare to take responsibility in the work, have a serious and responsible spirit, have certain organization and coordination ability, be able to integrate theory with practice, cooperate with comrades, devote themselves to the company, and successfully complete the work goal in 2020. This year's work is summarized as follows.
I. Project investment
Under the leadership of the company, be responsible for the technical support and project management of project cost control, project schedule and quality management. Be responsible for the implementation plan of time limit for a project, quality, safety and cost. Organize, coordinate, control and make decisions, and implement dynamic management of all production and construction factors in the whole process. In the process of project construction, the quality, cost, progress and safety of the project shall be supervised and inspected in strict accordance with the design requirements, acceptance specifications and regulations.
Second, project organization and management
Firstly, the project organization and management system and the main responsibilities of the project engineering department are defined, the purpose and task of project management are determined, and the four overall objectives of the project and the key points of construction process control are formulated. Formulate working procedures for project management. With the strong leadership of the leaders of the group company and the development company and the cooperation of relevant colleagues, the xx project was carried out smoothly. Report the progress of the project construction and matters that need to be coordinated by the company through the weekly work meeting of the group company, listen to the company's next work plan, implement the spirit of the company meeting, and timely implement the relevant decisions of the company; Through the weekly project meeting, coordinate all the work, solve the contradictions in daily construction, strengthen mutual communication, and timely and effectively control the quality, progress, cost, safety and civilization of the project.
Third, the project quality control situation
The company put forward the quality goal of "building high-quality projects and building xx brand", and the project department decomposed the target responsibility around this goal. Before the project starts, make clear the objectives and acceptance criteria of the supervisor and individual subcontractors. To examine and approve the supervision outline and construction organization design of general subcontracting. In view of the weak links of supervision and construction units in energy saving, intelligence, prevention and control of common quality defects, this paper puts forward improvement requirements, assists them to improve construction technology and formulate measures. Organize manufacturers of new materials and new processes to give lectures on material characteristics, construction technology requirements and quality inspection methods to Party A, the supervisor and the construction unit. Organize experts, quality supervision stations, manufacturers, supervisors and construction personnel to discuss material properties, construction technology, quality evaluation and acceptance methods, and determine the final pre-control scheme.
At present, building products are mainly done by hand, so there will be great deviation in product quality. The process control of product formation is the implementation of all pre-control schemes, which will directly affect whether the quality objectives can be achieved and the project brand and enterprise brand. In process control, give full play to the role of supervision in quality management, and fully authorize and effectively supervise supervision. In strict accordance with the rights and obligations stipulated in the supervision contract, supervise whether the grass-roots supervisors implement quality management in accordance with the supervision outline and Party A's enterprise standards.
Strictly control the quality of raw materials. First of all, the company selects some major material suppliers and orders directly from manufacturers, reducing intermediate links and preventing counterfeit and shoddy products that may appear in the circulation process. The project department shall accept the quality, quantity and specifications of the materials in the site, and supervise the on-site sampling inspection to check whether the materials in the site meet the contract requirements.
Fourth, strengthen material inspection.
Supervise the material quality inspection through the daily witness sampling of the supervisor; Check on-site materials; For suspicious materials, stop using and seal them first, and then take samples for inspection. Only by eliminating doubts can it be used; Do professional inspection, seal suspicious materials on site, expand the number of samples, and do independent inspection outside the specification; Confirmed unqualified materials shall be sealed and cleaned up at the lower limit of the supervisor's supervision. Strengthen the quality management of general and sub-contractors.
The general contractor is the producer of the product, and their work directly determines the quality of the product. In fact, the operating skills of workers in various construction units are basically close, and the difference in product quality is mainly the difference in management level. Therefore, in the management of general subcontractors, we should focus on the construction of their quality assurance system, give full play to the role of quality assurance system in quality management, strengthen communication with the first person in charge of the general subcontractors and the on-site project manager, organize a horizontal visit to the on-site standard area, learn from each other's strengths, strengthen market competition awareness, big team awareness and brand awareness, and attach importance to quality management ideologically.
Xx project is large in scale, large in volume and wide in construction cooperation. How to build this project with high quality, high efficiency, low consumption, schedule, safety and civilization is an important milestone in the company's real estate development. Therefore, the company's people, finances and materials are fully scheduled and operated in strict accordance with the quality and safety system. Careful organization and scientific management ensure the realization of the predetermined goals.