1 General provisions
2 Terminology and codes
2.1 Terminology
2.2 Codes
3 Basic regulations
p>
4 Construction preparation
5 Measurement
5.1 General provisions
5.2 Plane control survey
5.3 Elevation control survey
5.4 Construction line survey
6 Subgrade
6.1 General provisions
6.2 Construction drainage and precipitation
6.3 Earth subgrade
6.4 Stone subgrade
6.5 Road shoulder
6.6 Structure treatment
6.7 Special earth subgrade
6.8 Inspection standards
7 Base course
7.1 General provisions
7.2 Lime-stabilized soil base course
7.3 Lime- and fly-ash-stabilized gravel Base course
7.4 Lime, fly ash, steel slag stabilized soil base course
7.5 Cement stabilized soil base course
7.6 Graded gravel and graded gravel base
7.7 Graded gravel and graded gravel base layer
7.8 Inspection standards
8 Asphalt mixture surface layer
8.1 General Regulations
8.2 Hot mix asphalt mixture surface layer
8.3 Cold mix asphalt mixture surface layer
8.4 Transparent layer, adhesive layer and sealing layer
p>
8.5 Inspection standards
9 Asphalt penetration and asphalt surface treatment surface
9.1 General provisions
9.2 Asphalt penetration surface
9.3 Asphalt surface treatment surface layer
9.4 Inspection standards
10 Cement concrete surface layer
10.1 Raw materials
10.2 Concrete mix design
10.3 Construction preparation
10.4 Formwork and steel bars
10.5 Concrete mixing and transportation
10.6 Concrete paving
10.7 Surface maintenance and caulking
10.8 Inspection standards
11 Paved surface
11.1 Stone surface
p>
11.2 Precast concrete block surface layer
11.3 Inspection standards
12 Square and parking lot surface layer
12.1 Construction technology
13. Sidewalk paving
14. Pedestrian tunnel structure
15. Retaining wall
16. Ancillary structures
17. Construction during winter rain
18 Project Quality and Completion Acceptance
Appendix a Sub-item, division and unit project inspection record form
Explanation of wording in this specification
Attachment: Explanation of the provisions