A, water conservancy and hydropower engineering construction general contracting standards:
(A), the credit capacity of construction enterprises
1, the registered capital of the enterprise is more than 300 million yuan.
2. The net assets of the enterprise are more than 360 million yuan.
3. The business tax paid by construction enterprises in recent three years is more than 50 million yuan.
4. The credit line of corporate banks has been more than 500 million yuan in recent three years.
(2), the construction enterprise main management personnel and professional and technical personnel requirements
1, the enterprise manager has more than 10 years of project management experience.
2. The technical director has more than 15 years working experience in engineering technology management, and has the senior title of engineering sequence and the qualification of first-class registered constructor or registered engineer; He has presided over the technical work of more than two representative projects with the first-class qualification requirements for general construction contracting or the first-class design qualification requirements or general contracting projects with a contract amount of more than 200 million yuan.
3. The person in charge of finance has the title of senior accountant and the qualification of certified public accountant.
4. The enterprise has more than 50 registered first-class construction engineers (first-class project managers).
5 enterprises have professional and technical personnel who meet the requirements of Class A qualification standards for industrial engineering design related to this category.
(3) the level of scientific and technological progress
1. Enterprises have enterprise technology centers at or above the provincial level.
2. In the past three years, the funds for scientific and technological activities of enterprises have reached more than 0.5% of the turnover on average.
3, the enterprise has more than three national construction methods; In the past five years, it has owned more than 3 patents related to engineering construction, which can promote the technological progress of enterprises, and has more than 8 effective patents, including at least one invention patent.
4. The enterprise has won the National Science and Technology Progress Award or edited the national or industrial standards for engineering construction in recent ten years.
5. The enterprise has established an internal LAN or management information platform, and realized the networking of internal office, information release and data exchange; The external website of the enterprise has been established and opened; Archives management and design document management are realized by using comprehensive project management information system, personnel management system and engineering design related software.
(4), on behalf of the project performance
Within 10 years, it has undertaken general contracting, construction general contracting or main project contracting for more than three of the following six projects, of which at least 1 is the project in 1 2, and the project quality is qualified.
1 dam with storage capacity exceeding 1 100 million cubic meters or dam height exceeding 80 meters, or 2 dams with storage capacity exceeding 1 100 million cubic meters or dam height exceeding 60 meters;
2. There are 1 seat with flood discharge > 3,000m3/s, or there are 2 seats with flood discharge > 1 1,000m3/m;
3. One hydropower station with a total installed capacity of over 300MW 1 seat, or two hydropower stations with a total installed capacity of over1300mw;
4. Irrigation and drainage pumping stations 1 seat, with a total installed capacity of more than 10 MW, or 2 irrigation and drainage pumping stations with a total installed capacity of more than 5MW;
5. One hydraulic tunnel/kloc-0 with a diameter of > 8m and a length of > 3,000m, or two hydraulic tunnels with a diameter of > 6m and a length of > 2,000m;
6. More than 500,000 cubic meters of hydraulic concrete pouring, more than 6.5438+200,000 cubic meters of earth and stone filling of dam body, more than 6.5438+200,000 meters of rock foundation grouting or more than 80,000 square meters of cutoff wall will be completed annually.
Two, water conservancy and hydropower engineering construction general contracting enterprise level qualification standard (related recommendation: water conservancy and hydropower engineering construction general contracting level)
Compared with the first-class qualification grade standard of general contracting enterprises of water conservancy and hydropower projects, the first-class qualification grade standard of general contracting enterprises of water conservancy and hydropower projects does not require the level of scientific and technological progress.
Three. Secondary qualification standard for general contracting enterprises of water conservancy and hydropower projects (related recommendation: secondary qualification for general contracting enterprises of water conservancy and hydropower projects)
Compared with the first-level qualification grade standard of water conservancy and hydropower engineering construction general contracting enterprises, the second-level qualification grade standard of water conservancy and hydropower engineering construction general contracting enterprises has certain requirements for the assets, main management personnel and professional and technical personnel of construction enterprises.
Four, water conservancy and hydropower engineering construction general contracting enterprise level 3 qualification standard (related recommendation: water conservancy and hydropower engineering construction general contracting level 3 qualification)
Compared with the second-level qualification grade standard of water conservancy and hydropower engineering construction general contracting enterprises, the third-level qualification grade standard of water conservancy and hydropower engineering construction general contracting enterprises has certain requirements for the technical personnel of construction enterprises.
Verb (abbreviation of verb) Standard scope of qualification grade for general contracting enterprises of water conservancy and hydropower engineering construction (related recommendation: qualification scope of water conservancy and hydropower)
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.