Transverse cable installation:
-It can go out from 1 or 2 directions.
-The cable is dragged on a continuous plane, or supported on the ground with brackets with spacing less than1m..
-The installation height from the cable traction plane to the drum center shall not exceed1m..
-Regardless of cable steering.
-Running speed: 10m/min-60m/min.
-The maximum acceleration can reach 0.3m/s &;; sup2
Vertical cable installation:
-The roller is mounted at the top.
-The cable goes down vertically.
-Running speed: 10m/min-40m/min.
-The maximum acceleration can reach 0.3m/s &;; sup2
-Regardless of the free-hanging cable length L0.