Fan: Repair contract.
Contractor:
This contract is concluded by and between xx (Party A), the representative of xx Township Central Primary School in Xxxx County, and xx (Party B), the representative of xx Township Construction Team in xxxx County, for the purpose of repairing the teaching building.
1. Party A entrusts Party B to repair a teaching building, and Party B will repair it according to the requirements put forward by Party A (with repair request attached).
2. All maintenance costs (including materials and labor) are agreed to be RMB xxxx.
3. After the contract is signed, Party A shall pay 30% of the total maintenance cost to Party B, 30% after the project is completed, and the remaining 40% shall be paid in one lump sum after the maintenance acceptance.
The teaching building should be repaired within one and a half months (from xx to xx).
5. The materials used in the renovation of the teaching building meet the standards agreed by both parties (with a copy of the material standards).
6. If one party violates the terms of the contract and affects the repair project, the breaching party shall be responsible for compensating the losses.
7. This contract is made in triplicate, one for each party, and the other is supervised by the County Education Bureau.
Contractor xx Township Central Primary School (Seal)
Representative: xxx (signature)
Xx Township Construction Team (Seal)
Representative: xxx (signature)
In charge of xx County Education Bureau (seal)
Representative: xxx (signature)
Xxxx year x month xx day
Mode 2: Housing Repair Contract
This agreement is signed by the following parties on _ _ _ _ _ _:
Party A: _ _ _ _ _ _ (hereinafter referred to as Party A)
Address:No. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
ID number: _ _ _ _ _ Party B: _ _ _ _ _ _ (hereinafter referred to as Party B)
Address:No. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Legal Representative: _ _ _ _ _ _
Tel: _ _ _ _ _ _
Whereas: _ _ _ _ _ _
1. As the owner of the minor repair house, Party A has the right to repair the house;
2. Party B has obtained the license issued by the relevant state departments to engage in house repair, and it is an enterprise with the right to house repair, which currently exists legally.
In order to clarify the rights and obligations of both parties in this house renovation, Party A and Party B, in line with the principles of fairness, reasonableness, equal value and compensation, and in accordance with relevant laws and regulations, hereby enter into this agreement for mutual compliance.
Article 1 Party A decides to build a house in _ _ _ _ _ _ _ _.
Article 2 Party A guarantees that it has the right to maintain the above-mentioned house.
Article 3 Party B guarantees that it has the qualification certificate for house repair.
Article 4 The scope of Party B's maintenance of Party A's house this time is _ _ _ _ _ _ _ _ _; The mode is _ _ _ _ _ _ _; The standard is _ _ _ _ _ _ _ (the specific parts of the house that need to be repaired and the requirements of repair methods and standards should be specified in detail).
Article 5 The time for Party B to repair Party A's house this time is _ _ _ _ _ _ _ _ _.
Article 6 The renovation cost of the house is RMB _ _ _ _ _ _ _ _.
Article 7 In addition to the list listed in Annex 2, the raw materials for this house decoration shall be purchased by Party B and provided by Party B, but Party A has the right to supervise whether the raw materials used comply with relevant national regulations or industry practices. The raw materials listed in Annex II shall be provided by Party A (or provided by Party B according to the requirements of Party A in the list).
Article 8 Both parties agree that: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. ..
Article 9 After this agreement comes into effect, Party A shall allow Party B to enter the site for work within _ _ _ _ _ _ days and assist Party B in relevant maintenance work.
Article 10 A breach of this Agreement is a breach of contract and shall be liable for breach of contract.
Article 11 Except as stipulated in Article 12, the breaching party shall compensate the observant party for all losses, including but not limited to actual losses and legal fees and attorney fees paid for handling the breach.
Article 12 If Party B violates the provisions of Article 5 of this contract, it shall pay a penalty of RMB Yuan to Party A for each day overdue. However, the reasons attributable to the acts of Party A or relevant government or force majeure are excluded. This agreement does not exempt Party B from the liability for breach of contract under Article 11.
Article 13 This contract can only be changed under one of the following three circumstances:
1. Both parties agree to change and reach a written agreement;
2. All kinds of behaviors of relevant government agencies make this kind of house repair behavior have to be revised;
Force majeure makes it necessary to modify this contract.
Article 14 This contract can only be terminated after the following circumstances occur:
1. Both parties agree to terminate the performance of this contract through negotiation and reach a written agreement;
2. Various behaviors of relevant government agencies make it impossible or meaningless to repair such houses (such as the above-mentioned houses being included in the scope of demolition);
Force majeure makes it necessary to modify this contract.
Article 15 Any dispute related to this contract shall be settled through friendly negotiation. If both parties fail to reach an agreement within 30 days after negotiation, either party has the right to bring a lawsuit to the people's court where the house is located.
Article 16 All annexes to this contract are an integral part of this contract and have the same legal effect as this contract.
Article 17 this agreement. In duplicate, each party holds one copy, with the same legal effect.
Article 18 This Agreement shall come into force after Party A signs it and Party B signs and seals it.
Party A (signature): _ _ _ _ Party B (seal): _ _ _ _ _ _
Legal representative or authorized representative (signature): _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Signing place: _ _ _ _ _ Signing place: _ _ _ _ _ _
Mode 3: Model House Maintenance Contract
In order to clarify the rights and obligations of both parties in this house renovation, Party A and Party B have made this agreement in accordance with relevant laws and regulations and in line with the principles of fairness, reasonableness, equal value and compensation, and abide by it jointly.
Article 1: Party A decides to repair the office building (the whole building) of Tang Xian Traffic Observation Station of Heyuan Highway Bureau, which is located in Xudong Village, Tang Xian, G205 National Road, with a building area of square meters, and Party B agrees to repair it.
Article 2. Party A guarantees that it has the right to maintain the above-mentioned house.
Article 3. Party B guarantees that it has the house maintenance qualification certificate.
Article 4. Requirements of Party B for the renovation project of Party A's house this time:
1. Water supply and drainage engineering requirements: the pipeline layout meets the design requirements, the pipeline is firmly installed and fixed without looseness, the faucet and valve are installed smoothly, the opening is flexible, the water outlet is unblocked, and the water meter runs normally. There shall be no leakage at the joints between pipelines and appliances, pipelines and pipelines.
2. Electrical wiring engineering requirements: each floor is equipped with household distribution box, equipped with leakage circuit breaker, which has overload and overvoltage protection functions and controls lighting, air conditioning and sockets separately. , its circuit should ensure the normal use of the load. The laying of conductors shall be carried out in accordance with the provisions of decoration design, and the short-circuit protection, overload protection, conductor section selection and installation of lines shall be carried out in accordance with the current national standards.
3. Wall glue and ICI requirements: the surface should be clean and smooth, with straight line angle, no delamination, no ash explosion and no cracks.
4, the ground, metope with paste. Requirements; Mosaic should be firm, the surface is smooth and clean, without leakage and dislocation; The gap is even, the periphery is straight, and there are no cracks, corners and gaps on the brick surface.
5. Requirements for doors and windows: The specifications, opening direction and installation position of doors and windows should meet the design requirements. Doors and windows must be installed firmly, in the right position, straight, consistent in height, smooth and crack-free, and the doors and windows can be opened flexibly.
6. Requirements for suspended ceiling: The suspended ceiling shall be firmly installed, with smooth surface and no pollution, cracks, missing edges, falling corners, hammer injuries and other defects. The ceiling position should be accurate, and all connectors must be fastened and clamped tightly without obvious dislocation.
7. Requirements for bathroom equipment: the appearance of sanitary ware should be clean and free from damage. Receiving sanitary ware installation must be firm and not loose; Smooth drainage; Each joint shall be sealed without leakage; The valve switch is flexible.
Article 5. The time for Party B to repair Party A's house this time is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 6. The renovation fee of this house is subject to the attachment (1) Budget Table for Renovation Project of Tang Xian Traffic Observation Office Building of Heyuan Highway Bureau, and the payment method is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 7. If the unqualified materials provided by Party A affect the project quality, the cost of rework shall be borne by Party A, and the construction period shall be postponed. Except the materials provided by Party A, all other materials are purchased by Party B and provided by Party B, subject to the Annex (1) Budget Table of Tang Xian Traffic Observation Office Building Reconstruction Project of Heyuan Highway Bureau, but Party A has the right to supervise the raw materials used. In case of quality accidents caused by Party B, the cost of rework shall be borne by Party B, and the construction period shall not be postponed.
Article 8. Both parties agree that this part of the expenses shall be borne by Party A. ..
Article 9. Party B is appointed as the resident representative to be responsible for the performance of this contract. Organize the construction according to the requirements, ensure the quality and quantity, complete the construction tasks on schedule, and solve all matters that Party B is responsible for.
Tenth, Party B shall strictly implement the construction specifications, safety operation regulations, fire safety regulations and environmental protection regulations. Carry out the construction in strict accordance with the agreement of both parties, and participate in the completion acceptance and project settlement.
Article 11 After this agreement comes into effect, Party A shall allow Party B to enter the site for work within _ _ _ _ days and assist Party B in relevant maintenance work.
Article 12 Violation of this agreement is a breach of contract, and the breaching party shall bear the liability for breach of contract, and the breaching party shall compensate the observant party for its losses.
Article 13 This contract can only be changed after one of the following two situations occurs:
1. Both parties agree to change and reach a written agreement;
Force majeure makes it necessary to modify this contract.
Article 14 Any dispute related to this contract shall be settled through friendly negotiation. If negotiation fails, either party has the right to bring a lawsuit to the people's court where the house is located.
Article 15. All annexes to this contract constitute an integral part of this contract and have the same legal effect as this contract.
Article 16 This agreement is made in duplicate, each party holds one copy, which has the same legal effect. This agreement shall come into effect after being signed by Party A and sealed by Party B. ..
Party A (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Legal representative or authorized representative (signature) _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _