Retaining Wall 1 Minutes of Acceptance Meeting
The 38 th session
Ankang municipal administration facilities management division
20xx65438+February 8th
20xx65438+On February 8th, Qu, deputy director of Ankang Municipal Facilities Management Office, presided over the completion acceptance meeting of Yantai Lane Municipal Comprehensive Reconstruction Project. Responsible persons of Hanbin District Planning and Design Institute, Shaanxi Anxin Supervision Company, Jiangbei Office, Yantai Village and Municipal Office attended the meeting. The minutes of the meeting are as follows:
1. The acceptance team and participants conducted site survey and referred to the engineering data in detail. The meeting first heard the summary reports of construction, supervision, design and other units, the construction unit made a report on the implementation of the project, and the inspection team made a report to the meeting. The municipal comprehensive reconstruction project of Yantai Lane in Ankang City has passed the acceptance evaluation, and the engineering data is standardized and the completion acceptance procedure meets the requirements.
2. The total investment in final accounts audit of this project is 763,422.67 yuan, including 707,885.53 yuan for Jian 'an project (the cost of road, drainage and water supply projects is 625,765,438 yuan +04.42 yuan, and the cost of street lamp projects is 8265,438 yuan+0765,438 yuan+065,438 yuan+). The prepaid expenses are 55537. 14 yuan (management fee of the construction unit 14 157.7 1 yuan, design fee 17697. 14 yuan, supervision fee1844).
3. Collective evaluation by the completion acceptance team: The comprehensive municipal reconstruction project of Yantai Lane in Ankang City passed the completion acceptance, and now it is officially put into the custody of Ankang Municipal Facilities Management Office. The warranty period is one year from the date of acceptance.
Four, the meeting put forward some problems such as engineering defects and incomplete completion drawings, and instructed the construction unit to carefully sort out the investigation and compare the implementation of rectification one by one. After the rectification results are confirmed by the supervision unit, they will be verified in writing to the Municipal Management Office according to the procedures.
Participants:
Minutes of Acceptance Meeting of Retaining Wall II
20XX On the afternoon of June 9th, Jiangbei District Housing and Urban-Rural Development Bureau hosted a preliminary acceptance meeting for the completion of the second bid section of Tang Hong West Road Project in the conference room of the on-site project department. Participants attending the meeting included Municipal Construction Committee, Municipal Urban Management Bureau, Traffic Police Bureau of Municipal Public Security Bureau, Municipal Investment Company, Municipal Quality Supervision Station, Municipal Drainage Company, Municipal Water Supply Corporation, Municipal Public Transport Corporation, Municipal Street Lamp Management Office, Jiangbei Traffic Police Brigade, Jiangbei District Urban Management Bureau, District Transportation Bureau, District Agricultural and Water Bureau, Jiangbei Power Supply Bureau, Tang Hong Sub-district Office, Hefu Municipal Design Institute Co., Ltd., Ningbo College Construction Supervision Co., Ltd., Zhejiang Jinsheng Construction Co., Ltd. and Ningbo East China Construction. The relevant matters are summarized as follows:
1. Tang Hong west road project starts from the north outer ring in the south and ends at jiangbei avenue in the north, with a designed total length of 1 523.88m and a planned width of 44m. The construction standard is urban main roads. Main construction contents: roads and ancillary works, bridges, rain and sewage drainage pipes, water supply pipes, power trenches, supporting greening, street lamps, bus stops and traffic sanitation facilities. Communication and gas pipelines are implemented simultaneously as planned.
2. Participants agreed that the overall construction quality and appearance of Tang Hong West Road Project were good, and agreed that the project passed the preliminary acceptance of completion.
Three. Relevant contents specified in the meeting:
1. Because the southern end of the project involves the construction of the north outer ring elevated road, the pile number K0+0 18? K0+05 1 section is not in place. After reporting to the Municipal Construction Committee and other relevant departments, it is agreed to abandon this part of the project construction content and build the unit by the North Outer Ring Elevated Road.
2. The green space between the east red line of this road project (Changxing East Road to Jiangbei Avenue) and the existing residential fence and park is designed, and the specific contact list is designed. The cost is included in the total investment of this project.
3. In order to ensure the traffic safety of this road, the greening of the traffic island and the central isolation belt implemented at the intersection of Changyang East Road and Changyang East Road is transformed; Plastic-steel guardrails should be set at the sections with large roadside height difference at both ends of the bridge. The road traffic facilities at the intersection of Changxing East Road and Changyang East Road need to be further optimized, which will be determined by Jiangbei District Housing and Construction Bureau in conjunction with relevant units after the meeting. Specifically, a contact list is designed. The cost is included in the total investment of this project.
4. Bridges should be equipped with bridge nameplates and load-limiting plates, pedestrian walkways should be equipped with warning piles, and contact plates should be specially designed. The cost is included in the total investment of this project.
5. As the North Outer Ring Elevated Road and Jiangbei Avenue are under construction, brick walls with a height of 1 m are set at the north and south ends of the road in this project, and reflective no-go signs are set.
Four. What needs to be rectified in this project:
1. Completion data shall be delivered to relevant units as soon as possible, and special acceptance shall be conducted.
2, local asphalt concrete pavement damage should be rectified and reworked, and local sidewalk pavement should be rectified and reworked.
3, completes the finished product protection, green seedlings to strengthen maintenance, individual does not conform to the provisions of the seedlings and dead seedlings should be replaced or replanted in time.
4. Please ask the traffic facilities implementation unit to complete traffic facilities such as traffic marking and sign setting as soon as possible.
Five, the construction unit should be aimed at the problems raised in this meeting, in accordance with the design and specification requirements, pay close attention to the implementation of rectification, pay close attention to the preparation of project final accounts and improve construction materials, and conduct comprehensive acceptance after conditions are met.
Minutes of the Third Acceptance Meeting of Retaining Wall
Time: May 9, 20XX
Venue: Party A's Third Meeting Room
Participants: Chongqing Real Estate Development Co., Ltd.:, Chen, Tang Shuping, Wang Chunyu.
Chengdu Benchmark Zhong Fang Architectural Design Office: Wang Youling, Wang Bo and Yu Long.
Chongqing Jianxin Construction Supervision Consulting Co., Ltd.:,, Liu.
Chongqing Yuzhong Municipal Construction Co., Ltd.: Yu, Qin Guisheng, Chair: Yang He.
Recorder: Yan Li
First, the construction unit introduces the construction situation and quality self-evaluation:
1, this project belongs to residential pipe network and road engineering. Due to the tight construction period, our company attaches great importance to it, and immediately organizes relevant technical personnel of the company to formulate a strict and reasonable construction plan according to the contents of this project, requiring our project department to carry out the construction in strict accordance with the design drawings, specifications and contract provisions, and form a quality assurance system to ensure the project quality meets the requirements. During the construction process, our project department strictly checked the materials and engineering quality according to the company's requirements. Through the joint efforts of the construction, supervision and construction parties, the project has been completed without violating the mandatory standards. Cement, steel, sand and gravel in this project have certificates and sampling reports, and all kinds of materials have certificates. All hidden information meets the requirements and the signature is complete. The inspection lot, subdivisional work and divisional work meet the qualified standards, and the visual evaluation is qualified. The unit project is assessed as qualified according to the inspection and evaluation criteria.
2. The project entered the site in February of 20XX. The site construction conditions are complex, and the materials, safety and quality are strictly controlled. Strictly control each process node according to the requirements of Party A and the supervisor. Each process node shall formulate strict execution and inspection procedures. Under extremely complicated site construction conditions, with the support of Party A and the supervisor, the first and second phases of Zong Ping Project were successfully completed with high quality according to the design and Party A's requirements. The quality is qualified.
3. The completed engineering quantity is: 30,000 square meters of concrete road; The asphalt area is 26,000 square meters; Inspection wells 1200; Rain sewage pipe S2-300 double-wall corrugated pipe12000m; S2 type ¢400 double-wall corrugated pipe1500m; The 900m kerb of S2-type ¢300 double-wall corrugated pipe is1100,000 m; Drainage ditch1500m; Fire hose 6000 meters; The power tube is 5000 meters.
Second, the supervision unit introduces supervision and quality evaluation:
1. According to the contract, the site supervision department was established in this project to conduct comprehensive supervision and supervision of the project. All materials in this project are qualified and do not violate the mandatory provisions. All concealed inspection data are signed completely, and the sampling inspection is qualified. Some projects are qualified, and some problems are rectified within a time limit.
2. The rainwater, sewage pipe network, fire fighting and power pipe network of the first and second phases of the outdoor comprehensive station are all completed according to the design requirements, and the quality is qualified. All working procedures and on-site materials are strictly controlled, and the quality is qualified, and acceptance is agreed.
3. The road engineering construction unit shall carry out the general layout and pipe network layout according to the design requirements, and the data are true and reliable, and agree to acceptance.
Third, the design unit:
1, on-site workflow and test results, function test, reflected by data. Conform to the specifications, meet the acceptance requirements, and agree to acceptance.
Four, the construction unit:
1. Thank you for your support of this project. Due to the tight time and difficult conditions, except for minor problems in various parts, all the others reached the standard. Agree to accept. The overall quality is qualified, and due to the hasty project, there are inevitably some shortcomings;
① The fire hose outside the retaining wall needs anti-corrosion treatment;
(2) Add intercepting ditch on the road;
③ The road between buildings11-12 is damaged locally and needs to be repaired;
(4) The plastering of inspection wells needs local improvement.
2. The time limit for closed rectification is 10 day.
On the whole, thank you for your support.
V. Formation of completion acceptance opinions:
1. The construction unit has completed all the work contents of Phase I and Phase II specified in the contract and design documents, and the construction quality meets the requirements of design and construction quality acceptance specifications;
2. This project consists of four subprojects, namely outdoor rainwater and sewage pipe network, electric fire protection, road and biochemical pool in Phase I and Phase II, and the quality of each subproject is qualified;
3. The project function meets the requirements;
4. The physical object of the project meets the requirements of the design documents through observation, without obvious quality defects, and the visual quality acceptance meets the requirements;
5. Complete engineering and technical data, complete quality control data, complete safety and functional testing data, and the results of spot checks of major functional projects meet the requirements of relevant professional quality acceptance specifications;
6. All contractors' qualifications and personnel qualifications comply with relevant regulations;
7. The project construction procedure is legal, and there is no violation of mandatory standards for project construction. According to the Unified Standard for Construction Quality Acceptance of Building Engineering (GB50300-20XX), the quality of the project is assessed as qualified, and the completion acceptance is agreed.
Employer: (Seal)
Supervision unit (seal)
On-site representative:
Project leader:
Project leader:
Director:
Design unit: (seal)
Construction unit: (seal)
Project leader:
Project manager:
Designer:
Technical director:
Guess you are interested in:
1. Format of project acceptance meeting minutes
2. The acceptance meeting record model.
3. Model essay on minutes of acceptance meeting of division project
4. Minutes of project acceptance meeting
5. Minutes of acceptance meeting of divisional works