After the delivery of the new house, you should first find a professional house inspection agency to inspect your new house, and check whether the floor, wall and roof of the house are flat, whether the wall is empty and whether the power supply is normal. For the problems found in the house inspection, timely notify the property for maintenance.
& gt02
Change hydropower
When the new house is delivered, many sockets and faucet switches are not in the most suitable position, and some socket switches are in the way. At this time, it is necessary to change the water and electricity first. The reason why water and electricity will be changed is because changing water and electricity will damage the walls, and these damaged walls can be well repaired in the later decoration process. However, after wall treatment, changing water and electricity will seriously affect the appearance.
& gt03
Demolition and transformation of main body
The main body demolition mainly refers to the removal of redundant walls, the displacement of heating, the removal of wall skin and so on. This step can be carried out simultaneously with the change of water and electricity, but it should be noted that the property opinion must be consulted when removing the redundant wall, so as not to affect the handling of the real estate license. At the same time, it should be noted that the load-bearing wall should not be removed.
& gt04
Woodworking furniture
There is a lot of carpentry work in the decoration now, such as the wardrobe in the master bedroom, the bookshelf in the study, the antique bookshelf in the living room, the shoe rack and so on. Any carpenter can do it. Building furniture is also done in front, and it can be directly fixed on the wall after it is built. It should be noted that if tiles are laid, the furniture should be fixed after the tiles are laid. If you lay a wooden floor, you need to install furniture first, and then lay the wooden floor.
& gt05
Living room hung ceiling
At the same time of carpentry construction, construction workers can also be arranged to make the ceiling of the living room and install the top corner line. After the ceiling is installed, you can put the antique shelf in the designated position and fix it.
& gt06
Wall treatment
After the ceiling and top corner line are installed, the wall surface can be treated. When the wall surface is treated, it should be leveled first, then brushed with putty, and finally sprayed with latex paint. It should be noted that the color scheme of latex paint must be determined before wall treatment.
& gt07
Kitchen and bathroom hung ceiling
After the foundation decoration is completed, you can prepare the kitchen and bathroom ceiling and riser. The ceiling and riser of kitchen and bathroom are mainly for the overall beauty. This item can also be omitted if the budget is overspent.
& gt08
Cabinet installation
After the kitchen and bathroom ceiling is completed, the whole cabinet is installed. Because it takes a certain period to customize the whole cabinet, you must contact the cabinet manufacturer one and a half months in advance to measure the size, choose the appropriate style, and contact the manufacturer in time to determine the installation time.
& gt09
Floor installation
In general, the floor installation should be put last, but before the wooden door installation. This is because the foundation decoration in the early stage will produce a lot of dust, which will enter the gap of the plate, making it difficult to clean the plate. So the floor installation should be put last. If the lamps are purchased in advance, they should be installed before the floor installation.
& gt 10
Wooden door installation
The installation of wooden doors is the last link of the whole decoration, and it takes a certain period to customize wooden doors, so it is necessary to contact the manufacturer for measurement half a month to one month in advance. After the wooden door was installed, the whole decoration was basically completed.
I hope I can help you! Hope to adopt!