Steel structure workshop cost consultation?

The price of steel structure workshop can only be compared with some basic conditions, such as imported or domestic color plates, their thickness and coating; Material and thickness of insulating layer; Whether there is a skylight; Workshop spacing and span; There are many factors related to the existence of cranes, crane tonnage and working system level, and the influence of regional price difference and the qualification level of construction units can not be ignored.

The cost is mainly related to the use of steel beams. You can ask how many kilograms of steel are used per cubic meter, then multiply it by the price of steel, add the cost of steel production, and finally add the price of civil works and water and electricity without steel structure, which is tens of yuan, and the result is the cost.

The factory building cost is related to many factors, such as location, building structure type, use and construction time. Steel roof trusses are more expensive than thin web beams. The cost now is more expensive than last year. According to the calculation of 1000 yuan/square meter, it needs 800,000 yuan, and the steel roof truss structure needs1000 million yuan. This is an estimate, and the specific budget should be calculated according to the local price and the specific content of the factory building design. The following is the cost analysis before and in 2003 for your reference. 1. Analysis of the engineering cost of an industrial workshop in Hangzhou This cost index is compiled according to the engineering cost data of an industrial workshop in Hangzhou and provided by the Municipal Bidding Office for reference. I. Project Overview Project Name: Construction site of an industrial workshop: Hangzhou Project Category: Class II Building Area: 24 126m2 Structure Type: Frame Structure Height: 40.4m Floor: 6 Floor Unilateral Cost: 1 190 yuan /m2 Compilation Date: 65438+February 2000 Project. Φ 800 and Φ 900 bored piles are used for the foundation, and the number of piles is 19 1. Full-frame load-bearing structure, separated by porous clay brick filled wall. The transverse frame of each floor in the workshop adopts unbonded prestress technology, and there are cantilever structures at both ends. 2. The workshop cost of Yichang New Industrial Zone: 400 yuan/㎡ for brick-concrete structure workshop, 600 yuan/㎡ for frame structure workshop, and 1000 yuan/㎡ for light steel structure workshop. (The above prices are general quotations, and the specific situation needs to be accounted according to the building materials actually used in the plant. 3. Cost analysis of a factory building in Chengdu Project name: single-storey industrial factory building Project category: building category 4, decoration category 3 Charge level: building category 3 2, decoration category 3 2 Building area: 1.724 square meters Project cost: 1.582 506 5438+0.09 Yuan Unit cost: 91. Overview of the Project Structural Features: Structural Precast Frame Column Base 4115 Foundation Column Beam Roof Frame Reinforced Concrete Prestressed Thin Web Beam Roof Insulation Layer Roof Waterproof Layer Prestressed Big Roof Panel Special Wall Cast-in-situ Cement Vermiculite Neoprene Cold Glue Decoration Standard Exterior Wall Interior Wall Ceiling Floor Doors and Windows 80 106 Paint 106 Paint Bean Stone Metal.