How much is the decoration price in Zhuhai per square meter?

Labor costs about 300 yuan a day, so you must sign an installation contract with the installation master.

Decoration works are divided into half-package and full-package.

Half a package is generally around 300~500 square meters.

Semi-package, also called cleaning accessories, refers to the main materials purchased by themselves, such as floors, sanitary wares, tiles, floor tiles, paints, cabinets, locks and hardware. Other accessories are arranged by the construction team, such as sand, nails, cement, etc. It will be difficult, but the material quality and budget are well controlled.

Advantages:

1, choose the main part to take the initiative, which is called "grasping the key points".

2, the main building materials to buy their own, no matter from the safety or economy are more assured.

3, by the decoration company to help you design, so you don't have to study design, as long as you know more about building materials.

4. The auxiliary building materials are rationed by the construction team, which saves a lot of effort in small things.

Disadvantages:

1, I still have to spend a lot of time in the building materials market, so I can't decorate it easily.

2. When signing the contract, you must clearly indicate which ones are provided by the decoration company and which ones are purchased by the owners themselves. Otherwise, it will be easily used by the decoration company in the later period, which will make you feel very tired and passive.

Second, all-encompassing.

Turnkey is also called contracting for materials, and the contractor is responsible for all material procurement and construction.

Advantages:

1, the owner saves effort, all he has to do is communicate with the other party in time, let the other party know his intention and supervise the basic progress and quality of the project.

2. The design made by the decoration company is more professional, and it is less likely to have regrets in the future.

3. The design, construction and material selection are all completed by the same company, and the final effect will be more complete and the style will be more unified.

Disadvantages:

1. In today's decoration market, there are many various companies and employees, so it is really not easy to identify and select.

2. When you meet some informal companies, you have a great chance of being cheated.

3, especially in the procurement of building materials, it may be exploited by decoration companies.

Half-package decoration price and all-package decoration price

Semi-package: Accessories+labor (excluding main materials) Accessories include pipes, water pipes, elbows, glue, iron wires, clips, waterproof coatings, cement, yellow sand, bricks, blockboard, gypsum board, Jiuli board, 90 1 glue, eco-board, decorative board, latex paint, putty powder, grid cloth, etc.

All-inclusive: auxiliary materials+labor+main materials. The main materials include wooden door, door cover, window cover, ceramic tile, skirting line, floor, sill, toilet, toilet, shower head, towel rack, cabinet, integrated ceiling, yuba, chandelier, ceiling lamp, countertop, triangle valve, panel, faucet, bathroom cabinet, curtain and furniture: bed.

Because the auxiliary materials of the half-package decoration package are the main materials purchased by customers, it can prevent the construction party from tampering with the construction materials, but it does not necessarily save money. The contractor needs to choose a more reliable construction unit. This method is expensive, but it can save your time and energy and ensure the quality of materials. Because of the complete design, we can clearly understand the types and quantities of materials in the decoration. As long as the budget is transparent and the brand, style, price, quantity and grade of the materials are listed one by one, the owner can effectively supervise the quality of the materials and ensure that the materials are true. In addition, if the above premise is met, the contractor's materials or accessories can save time and cost, so that the decorator can save time and worry.

The decoration cost of all-inclusive decoration includes material cost, artificial machinery cost, profit and so on. In addition to the company's operating expenses, advertising fees, designers' commissions, etc. Only 60% of the money paid by customers can be spent on the house. Experts remind that no matter which decoration method is adopted, don't ignore the professional services provided by building materials merchants. Free services can save a lot of construction costs.

According to the formal process, the following contents will be clearly reflected in the semi-package renovation contract, and the details will be listed in the budget. The contents include: the situation of wall, roof and ground before construction; Whether it is necessary to carry out transformation and processing; Which parts need waterproofing, tile laying and floor laying; The second-hand house wall is covered with bandages and hung with nets. And bad decoration companies and "guerrillas" usually hide the problems of roofs and walls before decoration, thus reducing the quotation to attract consumers. After signing the contract and receiving part of the contract payment, ask these questions before charging.

In addition, the decoration company is required to list the modeling expenses and show the standard construction drawings. In addition, the unit of measurement, unit price, materials, etc. It should be stipulated in the contract. According to the drawings and these standards, consumers can clearly understand the building materials and the quantity of materials used. The price difference of materials for water circuit reconstruction is very large, and the room of about 100㎡ can make a profit of thousands of yuan by shoddy method. "Consumers must agree on the brand and model of materials in this link, and supervise the construction personnel to construct in strict accordance with the prescribed methods.