Introduction of Jincheng Railway Line?

Jincheng Railway starts from Jinzhou Station and ends at Chengde Station, with a total length of 437 kilometers. It starts from Jinzhou in the north, passes through Yixian to Chaoyang to Jianping (Ye), and passes through Lingyuan and Pingquan to Chengde. And is connected with the Beipiao branch line. It turned out that Japan invaded North China and hastily built it, with poor quality. The line runs in the hilly area of western Liaoning and the mountainous area of northern Hebei. After liberation, the line was reformed and the transportation capacity was greatly improved. The whole line has become an important channel for communication between Northeast China and Shanhaiguan. Transportation is mainly coal and grain, mainly to Shenyang and Anshan.

There are 52 stations along the route. Jincheng Railway, formerly known as Jingu Railway. Built in 1933- 1938. 1945 due to the demolition of the line from Chengde to Gubeikou, the Jingu Railway was only opened to Chengde, so it was later renamed Jincheng Line. It is another passage from northeast to north China.

terminal

Jinzhou Station, Bajiao Station, Yixian Station, Beipiao South Station, Chaoyang Station, Public Substation, Yebaishou Station, Lingyuan East Station, Lingyuan Station, Sanjia Station, Yang Shuling Station, Pingquan Station, Xiaosigou Station, Xiabancheng Station, Chengde East Station and Chengde Station.

For more information about the specifications of railway branch lines and the qualifications of railway construction enterprises in various regions of the country, you can log in to the construction network design link for inquiry.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.