Hami Railway Station Introduction
Hami new railway station belongs to the second double-track auxiliary project of Lanzhou-Xinjiang (Hami hub introduction project), with a construction area of 13282.53 square meters. It is planned to design 4 sets of 6-line high-speed field (including 1 set and general speed field * * *), and the general speed field is designed as 2 sets of 3 lines, with a total cost of about 8 1 10,000 yuan. The design area of Hami New Railway Station exceeds Yining Railway Station and will become the second largest railway station in Xinjiang. It is expected to be put into use around 20 14 10 and 3 1. Hami new railway station has a total investment of 65.438+0.6 billion yuan and a total construction area of 9,997 square meters, which is twice that of the old railway station. The total construction area of the station building is 9625 square meters, and the whole station building construction fully embodies the practicality and local characteristics of Hami. The total underground construction area of the station building is 372 square meters, the building height of the station building is 19 meters, there are two floors above the ground (local interlayer) and one underground floor, the building width is 1 10.00 meters, and the building depth is 45 meters. The newly-built waiting room is divided into two floors, with a waiting area of more than 2,500 square meters, which can accommodate at least 2,200 passengers. There are six ticket sales windows in the lobby, and three automatic ticket vending machines and an ATM machine are installed, which is more convenient for passengers to purchase tickets. The platform of Hami New Passenger Station is arranged side by side from south to north according to the high-speed parking lot, ordinary parking lot and regional operation parking lot, in which the high-speed parking lot is equipped with 8 bus lines and 4 platforms, and the ordinary parking lot is equipped with 5 bus lines. 1。 On the afternoon of August 2 1, a fire broke out at Hami Railway Station in Xinjiang. The fire has been basically controlled by firefighters. The cause of the fire is still under investigation, and there are no reports of casualties. From 00:00 on 20110/October 19, Hami new railway station was officially opened, and all passenger services of Hami south station were transferred to Hami railway station.