On February 18, Jingmen put forward some implementation measures to better develop prefabricated buildings.

February 18 prefabricated building is a new type of building that the state pays more attention to. Every province has set some development goals, and Jingmen City is no exception. In order to better develop prefabricated buildings, some suggestions are put forward.

February 18 prefabricated building is a new type of building that the state pays more attention to. Every province has set some development goals, and Jingmen City is no exception. In order to better develop prefabricated buildings, several main implementation measures are put forward. Let me give you a detailed introduction!

Strengthen policy guidance and optimize the development environment. The first is to formulate and release the implementation plan for the development of prefabricated buildings in Jingmen City. Clarify the implementation area and target tasks of Jingmen prefabricated buildings, and give priority to the approval of construction projects that meet the relevant standards and norms of prefabricated buildings.

The second is to introduce industrial incentive policies. For prefabricated construction industry projects, you can enjoy preferential land use, give rewards that do not exceed 3% of the planned total construction area, delay the payment of urban construction supporting fees, apply for pre-sale permits in advance, and enjoy preferential taxes and fees related to high-tech enterprises. In the examination and approval of fixed assets investment projects, the content of prefabricated buildings will be increased, and priority will be given to the examination and approval of construction projects that meet the relevant standards and norms of prefabricated buildings.

The third is to strengthen fiscal and taxation support. Actively encourage prefabricated construction projects to declare the national green building star logo, and support projects that have obtained the national building star logo to declare national and provincial incentive funds. Support manufacturing enterprises that meet the requirements of high-tech enterprises to enjoy relevant preferential tax policies. Before June 65438+1 October1in 2022, if prefabricated buildings are adopted for projects that acquire land through bidding, auction and hanging, the supporting fees for urban infrastructure construction for implementing prefabricated buildings may be exempted.

Fourth, focus on building the entire industrial chain of prefabricated buildings. From the whole process of research and development; D, design, production, application, construction, overall decoration, operation and maintenance, with an annual output of 6,543,800 cubic meters+4,000 cubic meters, production lines of precast concrete members have been built one after another. The first phase has an annual output of 60,000 tons of steel tube bundle members, 6,543,800 square meters of floor slabs and 20,000 tons of steel column beams, which is expected to meet the construction demand of about 6,543,800 square meters of assembled steel structures, and 400,000 square meters of assembled wood structures are under construction.

Innovate management mechanism and build technical support.

The first is to establish a joint meeting system for prefabricated building work. The leaders in charge of the municipal government regularly organize special meetings on the development of prefabricated buildings to discuss and deploy the development of prefabricated buildings in Jingmen City.

The second is to strengthen the bidding service and guidance of assembled construction projects. In principle, the general contracting mode is implemented for prefabricated buildings, and eligible units can be independent or joint bid.

The third is to strengthen the whole process control and strictly implement the review requirements of fixed assets investment projects (approval and filing), construction permits and completion acceptance. So as to achieve the standard specification and complete procedures. Establish a "closed" management mechanism for prefabricated buildings, strictly carry out technical review and pre-evaluation, and ensure that construction land planning conditions, land transfer announcements, land allocation decisions or land transfer contracts are implemented as required, and ensure that construction drawing design documents include special articles on prefabricated buildings.

The fourth is to strengthen quality supervision. Actively promote the quality assurance and insurance of prefabricated buildings, improve engineering quality insurance products and services, improve the quality liability compensation mechanism, and reduce the quality and safety risks of prefabricated buildings. At the same time, we actively signed a strategic cooperation agreement with the Science and Technology and Industrialization Development Center of the Ministry of Housing and Urban-Rural Development, vigorously implemented the cooperation mode of "promoting key projects of comprehensive strategic cooperation", and carried out strategic cooperation on seven key tasks such as construction industrialization and prefabricated buildings. Through competitive negotiation, entrust science,

Strengthen pilot demonstration and play a leading role. Adhere to the first test, the second-phase residential building of Fanghuayuan Community in Beijing (building area145,700 square meters, building height 18 floor 52.5 meters) undertaken by China Construction Third Bureau is progressing in an orderly manner; The blue-collar apartment (75,000 square meters) in Zhanghe New District has passed the tender, and the winning bidder, China Construction Third Bureau, is clearing the field and preparing to start construction. The reconstructed house (80,000 square meters) in Yingshan Happiness Community is displayed by the assembled steel tube bundle steel structure building system. The development projects of Phoenix New Area (300,000 square meters) and Zhanghe New Area (400,000 square meters) of China Construction Third Bureau are planned to adopt prefabricated buildings. Adhere to the demonstration and guidance, and set up an expert Committee on the modernization of the construction industry, including 8 foreign experts. The leaders of the Science and Technology and Industrialization Development Center of the Ministry of Housing and Urban-Rural Development and the Provincial Department of Housing and Urban-Rural Development visited Jingmen for investigation and guidance three times. Training courses on prefabricated buildings with 0/50 people from the whole province and 0/70 people from the whole city were held in Jingmen, which aroused widespread concern in society.