(1) Feasibility study fee
Feasibility study fee refers to the cost of technical and economic demonstration of relevant construction schemes, technical schemes or production and operation schemes, and the preparation and review of feasibility study reports in the project investment decision-making stage. Including project proposal, pre-feasibility study, feasibility study fee, etc.
(2) Special assessment fee
Special assessment fee refers to the expenses incurred by the construction unit in entrusting relevant units to carry out special assessment and relevant acceptance work in accordance with state regulations.
Special evaluation fees include environmental impact evaluation fees, safety pre-evaluation fees, occupational hazard pre-evaluation fees, earthquake safety evaluation fees, geological disaster risk evaluation fees, soil and water conservation evaluation fees, overlying mineral resources evaluation fees, energy-saving evaluation fees, risk and operability analysis and safety integrity evaluation fees and other special evaluation fees.
(3) Survey and design fees
1. Investigation fee
The survey fee refers to the fees charged by the surveyor for collecting existing data, conducting on-site survey, formulating survey outline, conducting survey operation, and compiling engineering survey documents and geotechnical engineering design documents according to the entrustment of the employer.
2. Design fee
Design fee refers to the fee charged by the designer for providing services such as compiling preliminary design documents, construction drawing design documents, non-standard equipment design documents and as-built drawings of the construction project according to the entrustment of the employer.
(4) Supervision fee
Supervision fee refers to the cost incurred by the project supervision unit entrusted by the construction unit to provide supervision services for the project construction.
(5) Research and test fees
The research and test fee refers to the research and test necessary for providing or verifying the design parameters, data and materials for the construction project, as well as the cost required for testing and verifying the design during the construction process. Including special research fees, labor costs, materials costs, test equipment and instrument use fees. This cost is calculated according to the research and test contents and requirements put forward by the design unit according to the needs of this project. It should be noted that the following items are not included in the calculation:
(1) The items that should be paid for the three expenses of science and technology (i.e. trial production expenses of new products, intermediate test expenses and important scientific research subsidies).
(2) The expenses incurred by the construction enterprise in the general appraisal and inspection of building materials, components and buildings, as well as the research and test expenses of technological innovation, shall be included in the construction and installation expenses.
(3) Projects that should be paid by survey and design fees or engineering fees.
(six) special equipment safety supervision and inspection fees
Special equipment safety supervision and inspection fee refers to the inspection and supervision of equipment (facilities) installed in the construction site and included in the scope of national special equipment, which should be included in the project expenditure.
(seven) supervision fee supervision fee
Refers to the expenses incurred by factory supervision on the manufacturing process and quality of equipment and materials needed for the project.
Equipment and material supervision refers to the service that the unit undertaking equipment supervision is entrusted by the project legal person or the construction unit, adheres to the principles of objectivity, fairness, honesty and science in accordance with the requirements of the equipment and material supply contract, and supervises the technological process and manufacturing quality of the equipment and materials needed for the project in the manufacturing process, and is responsible for the entrusting party (project legal person or the construction unit).
(8) Bidding fees
Bidding fee refers to the cost incurred by the construction unit to entrust a bidding agency to carry out bidding services.
(9) Design review fee
Design review fee refers to the cost that the construction unit entrusts a qualified institution to review the design documents. Design documents include preliminary design documents and construction drawing design documents.
(ten) the technical and economic standards of the use fee.
Technical and economic standard use fee refers to the cost incurred by using relevant technical and economic standards in the process of investment determination, valuation and cost control of construction projects.
(eleven) the project cost consulting fee
The project cost consulting fee refers to the cost incurred by the construction unit to entrust the cost consulting agency to carry out the relevant cost business work at various stages.