What is the content of the tender documents? Introduction of construction projects?

The content of the tender is very important, and what main information is not needed should be arranged reasonably. Zhong Da Consulting will tell you the contents of the tender.

(1) Letter of Bid. The model is as follows:

Tender (letter of tender)

_ _ _ _ _ (construction unit or bidding office)

After studying the bidding conditions, survey, design and construction drawings of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Selection of construction methods and construction machinery

We hereby agree that we will be bound by this tender within _ _ _ days after it is issued, and we are willing to be bound by it at any time during this period (that is, from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _). Once our bid is accepted, we will negotiate with your company and formally sign the _ _ _ _ _ _ _ _ _ _ contract.

We promise that once this tender (tender letter) is issued, it shall not be changed for any reason after the deadline for bidding, and we shall not refuse to sign the construction contract and construction after winning the bid; Once winning the bid, this bid together with your company's letter of acceptance will constitute a legally binding agreement between us and your company before signing the formal contract.

(If the tender requires the bidder to provide the guarantee from the bank or the superior department, the bidder shall attach the performance guarantee from the bank or the superior department in the tender (tender letter). )

Tender Release Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Bidder: _ _ _ _ _ _ (official seal)

Person in charge of the enterprise: _ _ _ _ _ _ (seal)

Contact person: _ _ _ _ _ _ (seal)

Tel: _ _ _ _ _ _

Address: _ _ _ _ _ _

(2) a comprehensive description. Including construction area, total construction period, planned commencement and completion date, total quoted amount, etc.

(3) Consumption of steel, cement and wood. Where a bargaining contract is implemented, the difference between the unit price and the total price shall be explained.

(4) Confirm the bidding documents or put forward new suggestions.

(5) Description of quotation. That is, indicate the contents that are not included in the total quotation amount and the conditions that require the bidder to cooperate, and indicate the items, quantities, amounts and reasons that are not included. The requirements for the tenderee should be specific and clear. If the tenderee can't cooperate, put forward the quotation and requirements, such as how much to increase the quotation and the extension of the construction period.

(6) Suggestions and measures to reduce costs.

(7) Construction organization design or construction scheme. It mainly includes general layout, main construction methods, machinery selection, construction schedule arrangement, specific measures to ensure construction period, quality and safety, manpower, key personnel and material resources invested, positions, titles and resumes of project leaders and technical leaders.

(8) single (1) project bidding. Including project name, building area, structure type, eaves height, number of floors, quality standard, cost and total price composition of single project, contents of subcontracted project, subcontractors to be used or ways to select subcontractors, etc.