General interview questions:
1, talk about your understanding and thinking about project cost control or cost control;
2, the composition of the project cost and the valuation procedure of the bill of quantities;
3. What is the engineering cost index of industrial workshop (1 ~ 4 floors) and small high-rise residence? What is the number of concrete, steel bars, formwork and masonry per square meter of construction area?
4. How long does it take you to work out the total engineering quantity of a small high-rise residential building with a square meter of 10000 (or 65438+ 10,000)?
5. The price information you have about local labor, materials, machinery and conventional construction projects (such as wall plastering, steel bars, templates, commercial concrete, floors, marble, etc.). );
6, the calculation rules of reinforcement, how to actually arrange reinforcement on the construction site, etc. ;
7, what position, under what circumstances scaffolding is suitable for scaffolding, scaffolding, or scaffolding, how to define the subtitle;
8. How to calculate stair formwork and cantilever formwork;
9, beam-column intersection template is deducted;
10, reserved doors and windows, size of the hole, etc.